BILLS OF QUANTITIES

FOR

THE PROPOSED NEW OFFICE DEVELOPMENT

ON ERF 8681, WINDHOEK

FOR

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY

(BIPA)

MARCH 2026

BILLS OF QUANTITIES

FOR

THE PROPOSED NEW OFFICE DEVELOPMENT

ON ERF 8681, WINDHOEK

FOR

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY

(BIPA)

ARCHITECT QUANTITY SURVEYOR

Marley Tjitjo Architects Dawid Nel Quantity Surveyors Inc.

PO Box 96088 PO Box 40113

Windhoek Ausspannplatz, Windhoek

Tel: 061 – 220 604 Tel: 061 – 244 701

Fax: 061 – 220 605 Fax: 061 – 244 779

CIVIL & STRUCTURAL ENGINEERS ELECTRICAL & MECHANICAL ENGINEERS

Denchi Consulting Engineers Denchi Consulting Engineers

PO Box 80352 PO Box 80352

Windhoek Windhoek

Tel: 061 – 228 183 Tel: 061 – 228 183

Fax: 061 – 231 703 Fax: 061 – 231 703

INDEX

ANNEXURE ‘A’ – MAIN BILLS OF QUANTITIES

SECTION 1 - PRELIMINARIES AND GENERAL

SECTION 2 - BUILDINGS

SECTION 3 - EXTERNAL WORKS

SECTION 4 - OTHER CONTRACTS AND SUNDRY ITEMS

ANNEXURE ‘B’ – ELECTRICAL INSTALLATION BILLS OF QUANTITIES

SECTION 1 – TECHNICAL SPECIFICATIONS

SECTION 2 – BILLS OF QUANTITIESPRELIMINARIES

ANNEXURE ‘C’ – ELECTRONIC INSTALLATIONS BILLS OF QUANTITIES

SECTION 1 – TECHNICAL SPECIFICATIONS

SECTION 2 – BILLS OF QUANTITIESPRELIMINARIES

ANNEXURE ‘D’ – HVAC INSTALLATIONS BILLS OF QUANTITIES

SECTION 1 – TECHNICAL SPECIFICATIONS

SECTION 2 – BILLS OF QUANTITIESPRELIMINARIES

NOTE:

TOTALS OF ANNEXURES ‘B’ TO ‘D’ AE TO BE TRANSFERRED TO

SECTION 4 – OTHER CONTRACTS OF ANNEXURE ‘A’

Item Description Unit Qty Amount

PRELIMINARIES AND GENERAL

PRELIMINARIES

NOTES

1) The "General Conditions of Contract" as

included in the "Standard Bidding Documents

for Open Advertised Bidding (Works)" shall be

the form approved.

2) Bidders are referred to the above-mentioned

documents for the full intent and meaning of

each clause thereof (hereinafter referred to by

heading and clause number only) for which

such allowance must be made as may be

considered necessary.

3) Bidders are referred to page 1/6 item F

regarding the adjustment of preliminaries in

any/all compensation events when pricing these

preliminaries items in respect to "Fixed, Time or

Value" relation.

----------------------------------------------

GENERAL CONDITIONS OF CONTRACT

GENERAL

A

Clause 1: Definitions Fixed:...........................

Time:............................ Value:...........................

Item 1 -

B

Clause 2: Interpretations

Fixed:........................... Time:............................

Value:...........................

Item 0 -

C

Clause 3: Language and Law

Fixed:........................... Time:............................

Value:...........................

Item 0 -

D

Clause 4: Project manager's decisions

Fixed:........................... Time:............................

Value:...........................

Item 0 -

-

Page 1 of 58

Item Description Unit Qty Amount

PRELIMINARIES AND GENERAL

PRELIMINARIES (Continued)

GENERAL CONDITIONS OF CONTRACT

GENERAL (Continued)

A

Clause 5: Delegation Fixed:...........................

Time:............................ Value:...........................

Item 0 -

B

Clause 6: Communications

Fixed:........................... Time:............................

Value:...........................

Item 0 -

C

Clause 7: Sub-contracting

Fixed:........................... Time:............................

Value:...........................

Item 0 -

D

Clause 8: Other contractors

Fixed:........................... Time:............................

Value:...........................

Item 0 -

E

Clause 9: Personnel and Equipment

Fixed:........................... Time:............................

Value:...........................

Item 0 -

F

Clause 10: Employer?s and Contractor?s Risks

Fixed:........................... Time:............................

Value:...........................

Item 0 -

G

Clause 11: Employer?s Risks

Fixed:........................... Time:............................

Value:...........................

Item 0 -

H

Clause 12: Contractor?s Risks

Fixed:........................... Time:............................

Value:...........................

Item 0 -

-

Page 2 of 58

Item Description Unit Qty Amount

PRELIMINARIES AND GENERAL

PRELIMINARIES (Continued)

GENERAL CONDITIONS OF CONTRACT

GENERAL (Continued)

A

Clause 13: Insurance Fixed:...........................

Time:............................ Value:...........................

Item 0 -

B

Clause 14: Site Data Fixed:...........................

Time:............................ Value:...........................

Item 0 -

C

Clause 15: Contractor to Construct the Works

Fixed:........................... Time:............................

Value:...........................

Item 0 -

D

Clause 16: The Works to Be Completed by the

Intended Completion Date

Fixed:........................... Time:............................

Value:...........................

Item 0 -

E

Clause 17: Approval by the Project Manager

Fixed:........................... Time:............................

Value:...........................

Item 0 -

F

Clause 18: Safety Fixed:...........................

Time:............................ Value:...........................

Item 0 -

G

Clause 19: Discoveries Fixed:...........................

Time:............................ Value:...........................

Item 0 -

H

Clause 20: Possession of the Site

Fixed:........................... Time:............................

Value:...........................

Item 0 -

-

Page 3 of 58

Item Description Unit Qty Amount

PRELIMINARIES AND GENERAL

PRELIMINARIES (Continued)

GENERAL CONDITIONS OF CONTRACT

GENERAL (Continued)

A

Clause 21: Access to the Site

Fixed:........................... Time:............................

Value:...........................

Item 0 -

B

Clause 22: Instructions Fixed:...........................

Time:............................ Value:...........................

Item 0 -

C

Clause 23: Appointment of the Adjudicator

Fixed:........................... Time:............................

Value:...........................

Item 0 -

D

Clause 24: Procedure for Disputes

Fixed:........................... Time:............................

Value:...........................

Item 0 -

TIME CONTROL

E

Clause 25: Program Fixed:...........................

Time:............................ Value:...........................

Item 0 -

F

Clause 26: Extension of the Intended

Completion Date Fixed:...........................

Time:............................ Value:...........................

Item 0 -

G

Clause 27: Acceleration Fixed:...........................

Time:............................ Value:...........................

Item 0 -

H

Clause 28: Delays Ordered by the Project

Manager Fixed:...........................

Time:............................ Value:...........................

Item 0 -

-

Page 4 of 58

Item Description Unit Qty Amount

PRELIMINARIES AND GENERAL

PRELIMINARIES (Continued)

GENERAL CONDITIONS OF CONTRACT

TIME CONTROL (Continued)

A

Clause 29: Management Meetings

Fixed:........................... Time:............................

Value:...........................

Item 0 -

B

Clause 30: Early Warning

Fixed:........................... Time:............................

Value:...........................

Item 0 -

QUALITY CONTROL

C

Clause 31: Identifying Defects

Fixed:........................... Time:............................

Value:...........................

Item 0 -

D

Clause 32: Tests Fixed:...........................

Time:............................ Value:...........................

Item 0 -

E

Clause 33: Correction of Defects

Fixed:........................... Time:............................

Value:...........................

Item 0 -

F

Clause 34: Uncorrected Defects

Fixed:........................... Time:............................

Value:...........................

Item 0 -

COST CONTROL

G

Clause 35: Contract Price

Fixed:........................... Time:............................

Value:...........................

Item 0 -

H

Clause 36: Changes in the Contract Price

Fixed:........................... Time:............................

Value:...........................

Item 0 -

-

Page 5 of 58

Item Description Unit Qty Amount

PRELIMINARIES AND GENERAL

PRELIMINARIES (Continued)

GENERAL CONDITIONS OF CONTRACT

COST CONTROL (Continued)

A

Clause 37: Variations Fixed:...........................

Time:............................ Value:...........................

Item 0 -

B

Clause 38: Cash Flow Forecasts

Fixed:........................... Time:............................

Value:...........................

Item 0 -

C

Clause 39: Payment Certificates

Fixed:........................... Time:............................

Value:...........................

Item 0 -

D

Clause 40: Payments Fixed:...........................

Time:............................ Value:...........................

Item 0 -

E

Clause 41: Compensation Events

Notwithstanding the provisions of this clause,

the preliminaries shall be adjusted on the basis

of fixed, time and value related items.

Fixed:........................... Time:............................

Value:...........................

Item 0 -

F

Clause 42: Tax Fixed:...........................

Time:............................ Value:...........................

Item 0 -

G

Clause 43: Currencies Fixed:...........................

Time:............................ Value:...........................

Item 0 -

H

Clause 44: Price Adjustment

Fixed:........................... Time:............................

Value:...........................

Item 0 -

-

Page 6 of 58

Item Description Unit Qty Amount

PRELIMINARIES AND GENERAL

PRELIMINARIES (Continued)

GENERAL CONDITIONS OF CONTRACT

COST CONTROL (Continued)

A

Clause 45: Retention Fixed:...........................

Time:............................ Value:...........................

Item 0 -

B

Clause 46: Liquidated Damages

Fixed:........................... Time:............................

Value:...........................

Item 0 -

C

Clause 47: Bonus Fixed:...........................

Time:............................ Value:...........................

Item 0 -

D

Clause 48: Advance Payment

Fixed:........................... Time:............................

Value:...........................

Item 0 -

E

Clause 49: Securities Fixed:...........................

Time:............................ Value:...........................

Item 0 -

F

Clause 50: Dayworks Fixed:...........................

Time:............................ Value:...........................

Item 0 -

G

Clause 51: Cost of Repairs

Fixed:........................... Time:............................

Value:...........................

Item 0 -

H

Clause 52: Labour Clause

Fixed:........................... Time:............................

Value:...........................

Item 0 -

-

Page 7 of 58

Item Description Unit Qty Amount

PRELIMINARIES AND GENERAL

PRELIMINARIES

GENERAL CONDITIONS OF CONTRACT

FINISHING THE CONTRACT

A

Clause 53: Completion Fixed:...........................

Time:............................ Value:...........................

Item 0 -

B

Clause 54: Taking Over Fixed:...........................

Time:............................ Value:...........................

Item 0 -

C

Clause 55: Final Account

Fixed:........................... Time:............................

Value:...........................

Item 0 -

D

Clause 56: Operating and Maintenance Manuals

Fixed:........................... Time:............................

Value:...........................

Item 0 -

E

Clause 57: Termination Fixed:...........................

Time:............................ Value:...........................

Item 0 -

F

Clause 58: Fraud and Corruption

Fixed:........................... Time:............................

Value:...........................

Item 0 -

G

Clause 59: Payment upon Termination

Fixed:........................... Time:............................

Value:...........................

Item 0 -

H

Clause 60: Property Fixed:...........................

Time:............................ Value:...........................

Item 0 -

-

Page 8 of 58

Item Description Unit Qty Amount

PRELIMINARIES AND GENERAL

FINISHING THE CONTRACT (Continued)

A

Clause 61: Release from Performance

Fixed:........................... Time:............................

Value:...........................

Item 0 -

SPECIFIC PRELIMINARIES

B

Samples of materials The contractor shall

furnish at his own cost such samples of

materials and specimens of colours as may be

called for by the Project Manager for his

approval.

Fixed:........................... Time:............................

Value:...........................

Item 0 -

C

Samples of workmanship and mock-ups The

contractor shall furnish such samples of

workmanship as may be called for by the

Project Manager for his approval. Where an

assembly of various elements of the buildings is

required, which is not incorporated in the works,

this shall be arranged by the contractor. Any

cost involved shall be borne by the employer.

Fixed:........................... Time:............................

Value:...........................

Item 0 -

D

Ordering of materials Should the Bills of

Quantities be used for ordering materials, this

shall be entirely at the contractor's risk.

Fixed:........................... Time:............................

Value:...........................

Item 0 -

E

Enclosure of works The contractor shall

provide, erect, alter as necessary, maintain and

remove and make good at completion suitable

hoardings complete with gantries, fans, safety

screens, barriers, access gates, covered

gangways, steel sections at crane lifts, splayed

corners, returned ends, etc. all as necessary for

the enclosure of the works and the protection of

the general public and others. The contractor

shall pay and recover all deposits and pay all

fees and charges in connection with the

hoarding and the use of the pavements

throughout the whole course of the contract, all

in accordance with any Act of Parliament,

regulation or by-law of any local authority.

Fixed:........................... Time:............................

Value:...........................

Item 0 -

-

Page 9 of 58

Item Description Unit Qty Amount

PRELIMINARIES AND GENERAL

PRELIMINARIES (Continued)

SPECIFIC PRELIMINARIES (Continued)

A

Pavement crossings and parking meters The

contractor shall pay and recover all deposits

and pay all fees and charges in connections

with and/or obtain permission for the

suspension of parking facilities and for

pavement or street encroachment and or

crossings and the removal and eventual

reinstatement of any local authority's parking

meters Fixed:...........................

Time:............................ Value:...........................

Item 0 -

B

Special scaffolding No special scaffolding is

measured as these Bills of Quantities are based

on the sixth edition of the Standard System for

Measuring Building Work. The Contractor shall

provide, maintain and remove on completion

special scaffolding for areas exceeding 5m

above floor level, for use of all trades, as

defined under the "Description of the Works".

Fixed:........................... Time:............................

Value:...........................

Item 0 -

C

Contractor's offices and sheds The contractor

shall provide and maintain temporary sheds and

offices for the proper storage of materials and

for the use of the workmen and shall remove

such temporary sheds and offices on

completion. Fixed:...........................

Time:............................ Value:...........................

Item 0 -

D

Offices The contractor shall provide, maintain

and remove on completion office

accommodation for meetings held on site. The

office shall be provided with tables and chairs

sufficient for the maximum number of persons

attending meetings and shall be kept

clean.Fixed:...........................Time:.....................

.......Value:...........................

Item 0 -

-

Page 10 of 58

Item Description Unit Qty Amount

PRELIMINARIES AND GENERAL

PRELIMINARIES (Continued)

SPECIFIC PRELIMINARIES (Continued)

A

Main notice boardThe contractor shall provide,

erect where directed, maintain and remove on

completion the main noticeboard complying with

the requirements of the Institute of Namibian

Architects, with the title of the project and the

names of the employer, the architect, the

quantity surveyor, the consulting engineers and

the contractor signwritten thereon.

Fixed:...........................Time:............................V

alue:...........................

Item 0 -

B

Water The contractor shall provide all water

for the works, including all necessary temporary

plumbing, removing same and making good on

completion. Fixed:...........................

Time:............................ Value:...........................

Item 0 -

C

Electricity and lighting The contractor shall

provide all necessary electricity and artificial

lighting for the works, including all necessary

temporary installation work, removing same and

making good on completion.

Fixed:........................... Time:............................

Value:...........................

Item 0 -

D

Telephones The contractor shall provide,

maintain and remove on completion a PT

telephone on site for use by all persons

engaged upon the works and shall be entitled to

recover the cost of outgoing calls from those

making them. Fixed:...........................

Time:............................ Value:...........................

Item 0 -

E

Toilets The contractor shall provide, maintain in

a thoroughly clean and tidy condition proper

toilets for the use of the workmen and remove

same on completion. Fixed:...........................

Time:............................ Value:...........................

Item 0 -

-

Page 11 of 58

Item Description Unit Qty Amount

PRELIMINARIES AND GENERAL

PRELIMINARIES (Continued)

SPECIFIC PRELIMINARIES (Continued)

A

Payment of preliminariesThe amount to be

included in each monthly certificate in respect of

preliminaries costs shall be calculated from the

priced items within the preliminaries section of

the bills of quantities. The contractor and project

manager shall agree a division of the priced

preliminaries items into:1) an initial or

establishment charge, payment of which shall

bemade to the contractor on proof that the

relevant expenditures have been made;2) a

monthly charge, and 3) a final or dis-

establishment chargeShould the contractor and

project manager be unable to agree such

division then the project manager shall make a

fair and reasonable division.In arriving at such

division cognisance shall be taken of such

factors as:1) Premiums for policies of insurance

and performance guarantees being renewable

annually,2)Plant, scaffolding and the like

remaining the property of the contractor or the

hiring company and the capital cost thereof not

being treated as part of the initial charge.In the

event of an extension of time for the completion

of the works the monthly charge be recalculated

on the same basis as originally but taking into

account the revised contract period and the

amounts already paid to the contractor.

Fixed:...........................Time:............................V

alue:...........................

Item 0 -

B

Protection The contractor shall provide for the

protection of all work for which a certificate of

practical completion has not been issued and

which is liable to be damaged from any cause.

The contractor shall be responsible for any

damage which may occur and shall make good

at his own expense. Fixed:...........................

Time:............................ Value:...........................

Item 0 -

-

Page 12 of 58

Item Description Unit Qty Amount

PRELIMINARIES AND GENERAL

PRELIMINARIES (Continued)

SPECIFIC PRELIMINARIES (Continued)

A

Site security The contractor shall provide all

watching and lighting necessary for general site

security. Fixed:...........................

Time:............................ Value:...........................

Item 0 -

B

Notice before covering work The contractor

shall give adequate notice to the project

manager whenever any work or materials

which are subjected to the project manager's

inspection or remeasurement are to be covered

in or concealed in any way. In default of such

notice being received such work or materials

shall be uncovered and later made good at the

contractor's expense. Fixed:...........................

Time:............................ Value:...........................

Item 0 -

C

Disturbance The contractor shall execute the

whole of the works with a minimum of

disturbance to the adjoining premises, any parts

of the works already handed over and the

occupants of those premises and/or parts.

Fixed:........................... Time:............................

Value:...........................

Item 0 -

D

Clearing and cleaning The contractor shall

regularly clean and clear away all rubbish and

excess materials as the works proceed and, on

completion, leave the works in a clean and

satisfactory state for immediate use and

occupation. Fixed:...........................

Time:............................ Value:...........................

Item 0 -

E

Vermin The contractor shall take all necessary

precautions to keep the works and site free from

vermin during construction and shall leave the

works vermin free on completion.

Fixed:........................... Time:............................

Value:...........................

Item 0 -

-

Page 13 of 58

Item Description Unit Qty Amount

PRELIMINARIES AND GENERAL

PRELIMINARIES (Continued)

SPECIFIC PRELIMINARIES (Continued)

A

Workmen's Compensation Insurance. The

Contractor and domestic sub-contractors shall

insure workmen in terms of the Employee

Compensation Act 5 of 1995 and shall deposit

immediately with the Project Manager written

confirmation of evidence of registration under

the Workmen's Compensation Act when signing

the Contract. Persons not falling under the

above mentioned Act must be insured under

individual Personal Accident Insurance policies

to the satisfaction of the Project Manager.

Fixed:........................... Time:............................

Value:...........................

Item 0 -

B

Open Fires. No open fires will be permitted

except in such places as are approved by the

Principal Agent. Any workmen or labourers

lighting fires in unauthorised places are to be

immediately dismissed. Fixed:...........................

Time:............................ Value:...........................

Item 0 -

C

Blasting The Contractor shall take all

responsibility during blasting operations, should

any be necessary, and must observe all

conditions set forth in Government and Local

Authority Regulations. The use of explosives is

left to the discretion of the Contractor who must

indemnify the Employer against any claims for

damages to persons or property on or near the

site from any cause whatsoever arising out of

the use of explosives. The Contractor will be

held solely responsible for and must

immediately make good, at his own expense,

any damage that may occur through the use of

explosives. Fixed:...........................

Time:............................ Value:...........................

Item 0 -

-

Page 14 of 58

Item Description Unit Qty Amount

PRELIMINARIES AND GENERAL

PRELIMINARIES (Continued)

SPECIFIC PRELIMINARIES (Continued)

A

As built drawings The position of construction

breaks and the extent of individual concrete

pours are to be recorded by the contractor on

the structural engineer's drawings and are to be

submitted to the architect and the structural

engineer for their records. The contractor shall

furnish the Project Manager with a set of

marked drawings indicating the positions of all

plumbing and drainage pipe work as actually

built. Fixed:...........................

Time:............................ Value:...........................

Item 0 -

B

Protection of trees Only those trees as are

indicated by the Project Manager shall be

removed. All other trees are to be protected

during the building operations and no workmen

may damage these trees in any way. The

Contractor is to note that some trees may occur

within the area of building operations. Before

removing such trees, the Contractor is to obtain

specific instructions from the Project Manager

as whether such trees may be removed or not.

Fixed:........................... Time:............................

Value:...........................

Item 0 -

-

Page 15 of 58

Item Description Unit Qty Amount

Collection

PRELIMINARIES AND GENERAL

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Page 16 of 58

Item Description Unit Qty Amount

BUILDINGS

ALTERATIONS AND DEMOLITIONS

REMOVAL OF EXISTING WORK

Breaking down and removing brickwork etc

A Half brick wall m² 18 -

Taking out doors, windows, etc, including

thresholds, sills, etc, setting aside for re-use and

later refixing in new position

B Timber door and and frame size 900 x 2 100mm No. 5 -

C

Form opening in one brick wall for to form

opening size 950 x 2 100mm high

No. 1 -

Taking down and removing roofs, floors,

panelling, ceilings, partitions, etc

D

Existing cellootex' ceiling, including cornice and

brandering

m² 192 -

E Remove existing fascia and barge board m 0 -

Taking out and removing sundry joinery work,

fittings, etc

F Kitchen counter on steel brackets m 2 -

G

Kitchen sink cupboard size 1 440 x 600 x

900mm with single bowl sink

No. 1 -

H Kitchen wall cupboard size 800 x 300 x 600mm No. 1 -

I Kitchen wall cupboard size 900 x 300 x 600mm No. 1 -

J BedrOom cupboard size 3 000 x 600 x 2 700 No. 4 -

Taking up and removing wood block floor

coverings, vinyl floor coverings, carpets, etc and

preparing screeds for new floor coverings

-

Page 17 of 58

Item Description Unit Qty Amount

BUILDINGS (Continued)

ALTERATIONS AND DEMOLITIONS

REMOVAL OF EXISTING WORK

Taking up and removing wood block floor

coverings, vinyl floor coverings, carpets, etc and

preparing screeds for new floor coverings

(Continued)

A Carpets from timber floors m² 177 -

B Timber skirting m 187 -

Taking out and removing ironmongery

C

Ironmongery from single timber door, including

door lock, handles, etc.

No. 19 -

D

Ironmongery from single timber door, including

door lock, handles, etc.

No. 1 -

E

Catches and stays from existing double side

hung windows, including replacing with new

No. 23 -

F Venetian blinds No. 23 -

Taking out and removing sanitary fittings, tanks,

geysers, etc, including disconnecting from

pipes, traps, etc and making good floor and wall

finishes (making good tiling and paintwork

elsewhere)

G Vitreous china urinal No. 1 -

H Vitreous china wc No. 2 -

I Vitreous china wash hand basin No. 2 -

Taking out/off and removing glass and mirrors

J

Remove glass from existing timber doors and

windows

m² 7 -

CUTTING THROUGH FLOORS AND

-

Page 18 of 58

Item Description Unit Qty Amount

BUILDINGS

ALTERATIONS AND DEMOLITIONS

CUTTING THROUGH FLOORS AND

Cutting through:

A

Existing existing timber floor to accomodate new

half brick wall

m 6 -

BUILDING UP OPENINGS

Brickwork in 7MPa concrete bricks in Class II

mortar in building up openings

B Half brick wall m² 2 -

C One and a half brick wall m² 4 -

OPENINGS THROUGH EXISTING WALLS

Altering openings

D

Altering opening in one brick wall where700 x

1500mm high timberl window removed to form

opening and build in timber single door and

frame 950 x 2100mm high overall elsewhere

removed by breaking out brickwork on both

sides and bottom, including prestressed

concrete lintels, making good cement plaster on

both sides and into reveals and with 20MPa

concrete threshold with steel trowelled finish

(new door and frame and making good

paintwork elsewhere)

No. 1 -

Breaking out for and forming openings through

brick walls for new doors and frames, including

prestressed concrete lintels, making good

cement plaster on both sides and into reveals

and with 20 MPa concrete thresholds with steel

trowelled finish (new doors and frames and

making good paintwork elsewhere)

E

Opening for door with timber frame 950 x 2

100mm high overall through one brick wall

No. 1 -

-

Page 19 of 58

Item Description Unit Qty Amount

BUILDINGS (Continued)

ALTERATIONS AND DEMOLITIONS

OPENINGS THROUGH EXISTING WALLS

Breaking out for and forming openings through

brick walls for new doors and frames, including

prestressed concrete lintels, making good

cement plaster on both sides and into reveals

and with 20 MPa concrete thresholds with steel

trowelled finish (new doors and frames and

making good paintwork elsewhere) (Continued)

A

Plain opening through one brickwall size 1 500 x

2 100mm high overall

No. 1 -

EARTHWORKS

SUPPLEMENTARY PREAMBLES

B

Attention is directed to the relevant sections of

the Model Preambles to All Trades which forms

a part of this Bill and must be read in

conjunction herewith. 0 -

C

Descriptions of carting away of excavated

material shall be deemed to include loading

excavated material onto trucks directly from the

excavations or, alternatively, from stock piles

situated on the building site.

0 -

D

The quantities of excavation, filling, carting

away, etc. measured are the nett volumes and

the Contractor is to make allowances in his

prices for the bulking of material.

0 -

EXCAVATION, FILLING, ETC

Excavation in earth not exceeding 2m deep

E Trenches m³ 97 -

F Holes m³ 4 -

-

Page 20 of 58

Item Description Unit Qty Amount

BUILDINGS

EARTHWORKS

EXCAVATION, FILLING, ETC

Extra over excavation in earth for excavation in

A Soft rock m³ 15 -

B Hard rock m³ 5 -

Extra over all excavations for carting away

C

Extra over all excavations for carting away

surplus materials from the excavations and/or

stock piles on site to a dump site to be located

by the Contractor, including allowing for bulking

of materials

m³ 20 -

Risk of collapse of excavations

D

Sides of trench and hole excavations not

exceeding 1,5m deep

m² 344 -

Keeping excavations free of water

E Keeping excavations free of water No 1 -

Earth filling obtained from the excavations

and/or prescribed stock piles on site compacted

to 95% Mod AASHTO density

F Backfilling to trenches, holes, etc. m³ 72 -

G Under floors, steps, pavings, etc. m³ 16 -

Earth filling supplied by the contractor

compacted to 95% Mod AASHTO density

H

Selected layer under floors, pavings, etc. of

type G5 natural gravel well watered and

compacted to 95% Mod AASHTO density

(Minimum CBR of 25 at 95% Mod AASHTO

Density) m³ 26 -

-

Page 21 of 58

Item Description Unit Qty Amount

BUILDINGS

EARTHWORKS

EXCAVATION, FILLING, ETC

Coarse river sand filling supplied by the

contractor

A

25mm Thick layer of approved clean earth filling

laid over poisoned areas under floors

m² 176 -

COMPACTION OF SURFACES

B

Compaction of ground surfaces inside trenches,

including scarifying for a depth of 100mm,

breaking down oversize material, adding

suitable material where necessary and

compacting to 95% Mod AASHTO density

m² 84 -

C

Compaction of ground surfaces under floors,

paving, etc., including scarifying for a depth of

150mm, breaking down oversize material,

adding suitable material where necessary and

compacting to 95% Mod AASHTO density

m² 176 -

SOIL POISONING

Soil insecticide

D

Under floors, pavings, etc. including forming and

poisoning shallow furrows against foundation

walls etc, filling in furrows and ramming

m² 176 -

E To bottoms and sides of trenches, holes, etc. m² 437 -

CONCRETE, FORMWORK AND

SUPPLEMENTARY PREAMBLES

F

Attention is directed to the relevant sections of

the Model Preambles to All Trades which forms

a part of this Bill and must be read in

conjunction herewith 0 -

-

Page 22 of 58

Item Description Unit Qty Amount

BUILDINGS

CONCRETE, FORMWORK AND

CONCRETE

A

Prices for concrete cast against excavated

surfaces shall include for casting against all

types of material in the excavations and shall

include for additional concrete required in filling

to irregularities.

0 -

B

Prices for all concrete shall include for forming

shaped tops and for striking off and curing of top

surfaces of concrete.

0 -

C

Prices for concrete in surface beds cast in

panels shall include for all formwork, fillets, etc.

required in forming the panels.

0 -

D

The costs of making, storing and testing of

concrete test cubes as required under clause 7

"Tests" of SABS 1200 G shall include the cost

of providing cube moulds necessary for the

purpose, for testing costs and for submitting

reports on the tests to the Architect. The testing

shall be undertaken by an independent firm or

institution nominated by the Contractor to the

approval of the Architect

0 -

UNREINFORCED CONCRETE

Class 15MPa/19mm concrete

E Surface blinding cast against excavated m³ 0 -

Class 20MPa/19mm concrete

F Surface beds on waterproofing m³ 16 -

G Ramp on waterproofing m³ 2 -

Class 25MPa/19mm concrete

-

Page 23 of 58

Item Description Unit Qty Amount

BUILDINGS (Continued)

CONCRETE, FORMWORK AND

CONCRETE (Continued)

UNREINFORCED CONCRETE (Continued)

Class 25MPa/19mm concrete (Continued)

A Strip footings m³ 63 -

REINFORCED CONCRETE

Class 20MPa/19mm concrete

B Steps, urinal steps, cupboard platforms, etc m³ 5 -

C Column bases m³ 1 -

Class 25MPa/19mm concrete

D Rectangular columns in foundations m³ 0 -

E Slabs inclusive of beams and inverted beams m³ 2 -

F Beams and isolated beams m³ 0 -

G Filling to cavity of hollow wall m³ 12 -

TEST BLOCKS

Making and testing 150 x 150 x 150mm

concrete strength test cube

H

Allow for the manufacture of a set of six

concrete strength test cubes as described, size

150mm x 150mm x 150mm, transporting to and

handing over to an approved testing authority

and paying all costs and charges related thereto

No 10 -

CONCRETE SUNDRIES

Finishing top surfaces of concrete smooth with a

wood float

-

Page 24 of 58

Item Description Unit Qty Amount

BUILDINGS (Continued)

CONCRETE, FORMWORK AND

CONCRETE (Continued)

CONCRETE SUNDRIES (Continued)

Finishing top surfaces of concrete smooth with a

wood float (Continued)

A Surface beds, slabs, etc. m² 188 -

FORMWORK

B

Descriptions of formwork shall be deemed to

include use and waste only (except where

described as "left in" or "permanent"), for fitting

together in the required forms, wedging,

plumbing and fixing to true angles and surfaces

as necessary to ensure easy release during

stripping and for reconditioning as necessary

before re-use. The vertical strutting shall be

carried down to such construction as is

sufficiently strong to afford the required support

without damage and shall remain in position

until the newly constructed work is able to

support itself. Formwork to soffits of solid slabs,

etc. shall be deemed to be to slabs not

exceeding 250mm thick unless otherwise

described. Formwork to sides of items

described as "in ground" means formwork from

top of bearing level to top of surface bed.

Where a height above bearing level is stated,

the bearing level is taken to be the surface bed

or slab level as the case may be. Formwork to

sides of bases, pile caps, ground beams, etc.

will only be measured where it is prescribed by

the Engineer for design reasons. Formwork

necessitated by irregularity or collapse of

excavated faces will not be measured and the

cost thereof shall be deemed to be included in

the allowance for taking the risk of collapse of

the sides of the excavations, provision for which

is made in "Earthworks".

0 -

-

Page 25 of 58

Item Description Unit Qty Amount

BUILDINGS

CONCRETE, FORMWORK AND

FORMWORK

SMOOTH FORMWORK (DEGREE OF

Smooth formwork to sides

A

Rectangular columns in foundations not

exceeding 3.5m high above bearing level`

m² 2 -

B

Beams attached to slabs not exceeding 3,5m

high above beraing level

m² 5 -

C

Edges, risers, ends and reveals not exceeding

300mm high

m 104 -

Smooth formwork to soffits

D

Slabs not exceeding 250mm propped not

exceeding 3.5m high above bearing level

m² 0 -

E

Beams attached to slabs propped not exceeding

3.5m high above bearing level

m² 0 -

Boxing in smooth formwork to form

F 25 x 25mm Vertical chamfer at corner m 27 -

MOVEMENT JOINTS ETC

Expansion joints with 6mm "Jointex" or similar

and approved closed cell expanded

polyethylene preformed joint filler between

vertical concrete and brick surfaces

G 12mm Joints not exceeding 300mm high m 172 -

Saw cut joints

H 10mm x 40mm Saw-cut joints in top of concrete m 11 -

REINFORCEMENT

-

Page 26 of 58

Item Description Unit Qty Amount

BUILDINGS

CONCRETE, FORMWORK AND

REINFORCEMENT

REINFORCEMENT

Mild steel reinforcement to structural concrete

work

A 10mm Diameter bars TON 0 -

High tensile steel reinforcement to structural

concrete work

B 12mm Diameter bars TON 0 -

C 16mm Diameter bars TON 0 -

Fabric reinforcement

D

Wire fabric reinforcement Ref No. 245 cast into

concrete

m² 31 -

PRECAST CONCRETE

PRECAST CONCRETE

Precast concrete finished smooth on exposed

surfaces including bedding, jointing and

pointing

E

"Wibeku Saddleback" coping size 300 x 50mm

with drip grooves both sides

m 80 -

MASONRY

SUPPLEMENTARY PREAMBLES

F

Prices for brickwork shall include for setting up

and building windows and door frames into

position in brick walls, wedging, pinning,

building solid against frames, etc., bedding of

roof coverings, wall plates, base plates, etc.,

forming ventilation flues through walls for air

bricks, etc., building ends of rafters, purlins,

joists, bars, pipes, bolts, etc. into or through

brickwork including wrapping in polyethylene

sheeting as necessary.

0 -

-

Page 27 of 58

Item Description Unit Qty Amount

BUILDINGS (Continued)

MASONRY (Continued)

SUPPLEMENTARY PREAMBLES

A

Prices for brickwork are to include for all raking

or splay cutting and waste, forming of squint

quoins or birdsmouth angles and the forming of

straight joints at expansion or construction joints

in walls and at windows, doors or plain

openings, etc.

0 -

B

Descriptions of recessed pointing to fair face

brickwork and face brickwork shall be deemed

to include square recessed, hollow recessed,

weathered pointing, etc 0 -

BRICKWORK

FOUNDATIONS

Brickwork in 14MPa concrete bricks in Class I

mortar

C Brick pier m³ 13 -

D One brick wall m² 266 -

E Half brick wall m² 87 -

F One and a half brick wall m² 88 -

G

370mm Hollow walls of two half brick skins with

150mm reinforced concrete infill (concrete and

reinforcement elsewhere)

m² 31 -

SUPERSTRUCTURE

Brickwork in 7MPa concrete bricks in Class II

mortar

H Half brick wall m² 262 -

I One brick wall m² 393 -

-

Page 28 of 58

Item Description Unit Qty Amount

BUILDINGS

MASONRY

BRICKWORK

BRICKWORK SUNDRIES

Brickwork reinforcement

A 75mm Wide reinforcement built in horizontally m 771 -

B

150mm Wide reinforcement built in horizontally

in foundation

m 2,880 -

C 150mm Wide reinforcement built in horizontally m 740 -

D

75mm Wide reinforcement built in horizontally in

foundations

m 341 -

E

225mm Wide reinforcement built in horizontally

in foundation

m 1,037 -

Prestressed fabricated lintels including any

necessary temporary support

F 110mm x 76mm Lintels in lengths not exceeding m 31 -

WATERPROOFING

DAMP-PROOFING OF WALLS AND

One layer of type FV damp proof course

G In walls m² 47 -

One layer of 375 micron "Consol Plastics

Hyperlastic Orange" waterproof sheeting

sealed at laps with "Superstik" tape

H

Under floors, including dressing up against

walls, etc.

m² 176 -

Two coats "Brixeal" bitumen emulsion

waterproof coating

I On walls m² 277 -

-

Page 29 of 58

Item Description Unit Qty Amount

BUILDINGS

WATERPROOFING

WATERPROOFING TO ROOFS,

4mm "SIKA INDEX VIS POLYESTER" or similar

and plastomeric distilled polymer-bitumen

waterproofing membrane, reinforced with a rot-

proof "non-woven" polyester fabric stabilized

with fibreglass mat applied in strict accordance

with the manufacturer's instructions, including

all necessary primers, etc.

A Screeded concrete roofs m² 12 -

B Extra for 150mm turnup m 49 -

JOINT SEALANTS ETC

? two-part grey polysulphide sealing compound

including backing cord, bond breaker, primer,

etc

C Joints m 172 -

ROOF COVERINGS

PROFILED METAL SHEETING AND

“Global Roofing Solutions Klip-Lok 406” or

similar and approved profile with 406mm cover

roll-formed in continuous lengths from 0.47mm

thick Zincalume AZ150 coated spelter G550

steel sheeting with a standard colour “Clean

Colorbond ThermaTech” or similar and

approved top coat and Shadow Grey backing

coat roof sheeting fixed to steel intermediate

purlins at maximum 2 000mm centres and

eaves and ridge purlins at maximum 1 700mm

centres using “Global Roofing Solution KL65” or

similar and approved clips fixed with 10No.16 x

16mm long self-drilling wafer head PH2 screws

-

Page 30 of 58

Item Description Unit Qty Amount

BUILDINGS (Continued)

ROOF COVERINGS (Continued)

PROFILED METAL SHEETING AND

ACCESSORIES (Continued)

“Global Roofing Solutions Klip-Lok 406” or

similar and approved profile with 406mm cover

roll-formed in continuous lengths from 0.47mm

thick Zincalume AZ150 coated spelter G550

steel sheeting with a standard colour “Clean

Colorbond ThermaTech” or similar and

approved top coat and Shadow Grey backing

coat roof sheeting fixed to steel intermediate

purlins at maximum 2 000mm centres and

eaves and ridge purlins at maximum 1 700mm

centres using “Global Roofing Solution KL65” or

similar and approved clips fixed with 10No.16 x

16mm long self-drilling wafer head PH2 screws

(Continued)

A Roofcoverings not exceeding 25 degrees m² 167 -

B Ride capping m 19 -

CARPENTRY AND JOINERY

EAVES, VERGES, ETC

Everite FC77 pressed fibre-cement

C 10 x 225mm Fascia m 94 -

DOORS ETC

Wrought meranti doors

D

Labour-only for building in timber door door and

frame eslwhere removed

No. 3 -

FITTINGS

KITCHEN CUPBOARDS

Kitchen cupboards etc constructucted of MDF

(High Density Fibreboard) with "Melawood

Supagloss" or similar and approved drawer

fronts and doors with soft close hinges,

stainless steel type "Bar handle straight 200"

handles and heavy duty ball bearing telescopic

drawer slides

-

Page 31 of 58

Item Description Unit Qty Amount

BUILDINGS (Continued)

CARPENTRY AND JOINERY (Continued)

FITTINGS (Continued)

KITCHEN CUPBOARDS (Continued)

Kitchen cupboards etc constructucted of MDF

(High Density Fibreboard) with "Melawood

Supagloss" or similar and approved drawer

fronts and doors with soft close hinges,

stainless steel type "Bar handle straight 200"

handles and heavy duty ball bearing telescopic

drawer slides (Continued)

A

Kitchen sink cupboard size 2 000 x 600 x

900mm complete with with counter suitable for

single bowl sink

No. 3 -

COUNTERS

B Provisional amount for reception counter No. 1 -

CEILINGS, PARTITIONS AND ACCESS

SUSPENDED CEILINGS

9,5mm "Rhino" or similar and approved gypsum

plasterboard ceiling with taped and skimmed

joints finished with gypsum skim plaster

trowelled to a smooth polished surface fixed to

"Donn screw up" or similar and approved grid

system

C

Sloping ceiling suspended not exceeding 1,0m

below steel rafters and lipped channel purlins

m² 145 -

D

Ceiling suspended not exceeding 1,0m below

timber trusses

m² 263 -

Cornices to suspended ceilings

E

"Donn SM25" or similar and approved wall

channel secured to wall at 450mm maximum

centres (Colour: White)

m 0 -

-

Page 32 of 58

Item Description Unit Qty Amount

BUILDINGS

CEILINGS, PARTITIONS AND ACCESS

PARTITIONS ETC

Rhino-Drywall System No 1 steel stud

partitioning with "Rhino Wallboard" on both

sides

A 76mm Drywall partition 3 900mm high m 5 -

B

Extra-over 3 900mm high partition for vertical

abutments against plastered wall

No. 2 -

C

Extra-over 3 900mm high partition for plain

opening for aluminium or timber door size 900 x

2 100mm high (Door elsewhere0

No. 1 -

IRONMONGERY

LOCKS

Dormakaba

D

"Dormakaba D02725 SS " or similar and

approved stainless steel narrow stile dead lock

operating with european profile cylinder

No. 19 -

E

"Dormakaba D02725 SS " or similar and

approved stainless steel narrow stile dead lock

operating with european profile cylinder for

double door No. 1 -

HANDLES

Dormakaba

F

"Dormakaba CB300" or similar and approved

stainless steel lever handle with cylinder

keyhole

No. 11 -

G

"Dormakaba DHP-430-CL-SF 170X170" or

similar and approved stainless steel pull handle

and plate

No. 8 -

-

Page 33 of 58

Item Description Unit Qty Amount

BUILDINGS (Continued)

IRONMONGERY (Continued)

HANDLES (Continued)

Dormakaba (Continued)

A

"Dormakaba DHP-430-CL-SF 170X170" or

similar and approved stainless steel pull handle

and plate for double door

No. 1 -

BATHROOM FITTINGS

Bathroom Butler

B

"4601BRSH" Brushed stainless steel toilet

paper holder

No. 6 -

C

"4604BRSH" Brushed stainless steel spare

toilet paper holder

No. 6 -

D

"4610BRSH" Brushed stainless steel single

robe hook

No. 6 -

E "4640BRSH" Brushed stainless steel towel ring No. 6 -

Franke

F "Franke CNTX600" Straight grab rail No. 6 -

G "Franke CNTXPAR" Paraplegic grab rail No. 6 -

H "Franke RODX672" toilet paper holder No. 6 -

Taurus

I

"Taurus 48-CL00004" Stainless steel soap

dispenser

No. 6 -

J

"Taurus SD1117" Stainless steel lever control

paper towel dispenser

No. 6 -

K

"Taurus SD1136 (SS)" Stainless steel paper

disposer

No. 6 -

SUNDRIES

-

Page 34 of 58

Item Description Unit Qty Amount

BUILDINGS

IRONMONGERY

SUNDRIES

Union

A Door stop No. 21 -

STRUCTURAL STEELWORK

B

The Tenderer is advised to refer to the "Model

Preambles for all Trades" before pricing this Bill.

(1)

0 -

C

Descriptions Descriptions of bolts shall be

deemed to include nuts and washers.

Descriptions of L-shaped and U-shaped anchor

bolts shall be deemed to include bending,

threading, nuts and washers and embedding in

concrete. Descriptions of expansion anchors

and bolts and chemical anchors and bolts shall

be deemed to include nuts, washers and

mortices in brickwork or concrete. All steel to

be painted with red oxide primer before delivery

to site. Shop drawings shall be prepared and

submitted for approval prior to manufacture.

0 -

STEEL COLUMNS AND BEAMS

Welded columns in single lengths with flat

section base, top, bearer and connection plates

bolted to ?

D

180mm x 10mm x 44.319 kg/m Square hollow

section columns

TON 1 -

Welded beams in single lengths with flat section

bearer and connection plates bolted to ?

columns

E

254 x 254 x 84.7kg/m Univeral bearing pile fixed

to top of brickwall

TON 4 -

-

Page 35 of 58

Item Description Unit Qty Amount

BUILDINGS (Continued)

STRUCTURAL STEELWORK (Continued)

STEEL COLUMNS AND BEAMS

Welded beams in single lengths with flat section

bearer and connection plates bolted to ?

columns (Continued)

A

76 x 50mm x 2.5mm x 4.77 kg/m Square hollow

section beams

TON 0 -

B

100 x 50 x 2.5mm x 5.69 kg/m Rectangular

hollow section rafters

TON 0 -

Bolts to columns, beams, etc

C Baseplates No. 27 -

PURLINS, GIRTS, BRACING, ETC

Purlins and girts bolted to steel

D

75 x 50 x 20 x 2.5mm Lipped channel section

purlin

TON 1 -

METALWORK

SUNDRY STEELWORK

Purpose-made steel fireplaces, barbeques, etc.

E

'1500mm Hifire Deluxe" or similar and approved

buil-in brraai complete

No. 1 -

ALUMINIUM WINDOWS, DOORS, ETC

Black powder coated aluminium windows of

'Clip 44' or similar and approved sections glazed

with "Solarvue" or similar and approved grey

high penetration resistant PVB laminated safety

glass (minimum 6.76mm thick) and plugged to

brickwork or concrete with chemical anchors

F Window type PT99 size 900 x 900mm high No. 3 -

-

Page 36 of 58

Item Description Unit Qty Amount

BUILDINGS (Continued)

METALWORK (Continued)

ALUMINIUM WINDOWS, DOORS, ETC

Black powder coated aluminium windows of

'Clip 44' or similar and approved sections glazed

with "Solarvue" or similar and approved grey

high penetration resistant PVB laminated safety

glass (minimum 6.76mm thick) and plugged to

brickwork or concrete with chemical anchors

(Continued)

A

Purpose-made window of two top opening

panes and two fixed panes size 580 x 2 400mm

high (W03)

No. 2 -

B

Purpose-made window trapesium shaped

window of three fixed panes size 1 000 x 3

496mm high overall (W05)

No. 1 -

C

Purpose-made window of two top opening

panes and two fixed panes size 750 x 2 680mm

high (W06)

No. 6 -

D

Purpose-made window of two top opening

panes and two fixed panes size 750 x 2 920mm

high (W04)

No. 2 -

E

Purpose-made window trapesium shaped

window of three fixed panes size 1 000 x 3

496mm high overall (W05)

No. 2 -

F

Purpose-made window of three fixed panes size

1 679 x 350mm high (W07)

No. 3 -

G

Purpose-made window trapesium shaped

window of seven unequal fixed panes size 4 810

x 3 280mm high overall (above D07)

No. 1 -

Black powder coated aluminium doors,

sidelights and fanlights glazed with "Solarvue"

or similar and approved high penetration

resistant PVB laminated safety glass (minimum

6.76mm thick) and plugged to brickwork or

concrete with chemical anchors

-

Page 37 of 58

Item Description Unit Qty Amount

BUILDINGS (Continued)

METALWORK (Continued)

ALUMINIUM WINDOWS, DOORS, ETC

Black powder coated aluminium doors,

sidelights and fanlights glazed with "Solarvue"

or similar and approved high penetration

resistant PVB laminated safety glass (minimum

6.76mm thick) and plugged to brickwork or

concrete with chemical anchors (Continued)

A

Single entrance door door with sidelight and

toplight size 1 500 x 2 639mm high overall (D11)

complete with ironmongery, floor springs, etc.

No. 1 -

B

Double entrance door door with two sidelightss

size 3 720 x 2 400mm high overall (D07)

complete with ironmongery, floor springs, etc.

No. 1 -

C

Single alumnium door and frame size 900 x 2

400mm high overall

No. 14 -

STEEL STRONGROOM DOORS,

Strongroom doors etc suitable for 230mm walls

fixed to brickwork or concrete

D

"Falcon Record Room Door" or similar and

approved record room door with a 6mm steel

plate for a wall opening of 880 x 1 930mm high

with one 7 lever keylock set complete with

heavy duty door stop, inner release and double

ended vent No. 2 -

PLASTERING

SCREEDS

Screeds wood floated on concrete

E

Average 50mm thick screed to falls and cross

falls

m² 12 -

-

Page 38 of 58

Item Description Unit Qty Amount

BUILDINGS (Continued)

PLASTERING (Continued)

SCREEDS (Continued)

Screeds wood floated on concrete (Continued)

A 25mm Thick screed m² 290 -

Cement plaster screeds wood floated on

concrete including "Sikalite" or similar and

approved powdered waterproofing admixture

added as per manufacturer's instructions

B 25mm Thick screed m² 172 -

INTERNAL PLASTER

Compo plaster on brickwork

C Narrow widths m² 33 -

D Walls m² 658 -

Compo plaster on concrete

E Soffit of slabs m² 7 -

EXTERNAL PLASTER

Cement plaster on brickwork

F On brickwork m² 828 -

G On brickwork in foundations m² 377 -

Cement plaster on concrete

H

Projecting and isolated concrete columns and

beams

m² 4 -

TILING

WALL TILING

-

Page 39 of 58

Item Description Unit Qty Amount

BUILDINGS

TILING

WALL TILING

600 x 600 x 7.5mm "Durham Grey " or similar

and approved matt finish glazed hardbody wall

tiles fixed with and including an approved tile

adhesive to plaster (plaster elsewhere

measured) and flush pointed with an approved

waterproof cement grouting

A On walls m² 142 -

B On narrow widths m² 7 -

FLOOR TILING

600mm x 600mm x 10mm Approved full body

porcelain floor tiles fixed with an approved high

traffic adhesive to screed (screed elsewhere

measured) and flush pointed with tinted

waterproof jointing compound (PC =

N$450.00/m²)

C On floors m² 462 -

D 100mm High cut tile skirting m 618 -

E Treads and risers of stair m 38 -

DIVIDING STRIPS, EDGE STRIPS, ETC.

Schluter Systems

F "RENO-AU/-AEU" Profile 10mm high m 15 -

Kirk Marketing

G M-Trim SSE250 stainless steel straight edge m 668 -

PLUMBING AND DRAINAGE

SANITARY FITTINGS

-

Page 40 of 58

Item Description Unit Qty Amount

BUILDINGS

PLUMBING AND DRAINAGE

SANITARY FITTINGS

Duravit

A

"DuraSystem® WD1028000040" concealed

cistern for wet installation supplied and installed

complete with "Gerberit Twinline 30" flush

actuator No. 6 -

B

"No.1 DUR-21830900002" White close coupled

rimless pan with back inlet complete with

0075081000 chrome water connection

No. 6 -

Franke

C

"Maris MRG610-37" Fragranite white single

bowl inset sink size 410 x 440mm with and

including 90mm stainles steel basket waste

No. 2 -

Gerberit

D

"Selnova Square GEB-500.310.01.1" White wall-

hung basin with centre tap hole size 500 x

420mm widewith overflow and slotted pop-up

waste No. 6 -

TRAPS, ETC.

Wirquin

E "Espace" single bowl sink trap No. 2 -

Gio Design

F

"Gio Design A186-32" 32mm Round chrome

bottle trap

No. 6 -

TAPS, VALVES, ETC

Cobra Watertech

G

15mm "Cobra 232/350" Angle regulating valve

with 350mm service connection

No. 22 -

-

Page 41 of 58

Item Description Unit Qty Amount

BUILDINGS

PLUMBING AND DRAINAGE

TAPS, VALVES, ETC

Logis

A

" Logis HG-71090-000" chrome plated basin

mixer 190 with pop-up waste

No. 6 -

B "Logis M31 HG-71835000" Chrome sink mixer No. 2 -

SANITARY PLUMBING

PIPES

uPVC pipes

C 40mm Pipes m 40 -

D 50mm Pipes m 40 -

Extra over uPVC pipes for fittings

E 40mm Bend No. 16 -

F 40mm Access bend No. 16 -

G 50mm Bend No. 16 -

H 50mm Access bend No. 16 -

I 40mm Junction No. 16 -

J 40mm Access junction No. 16 -

K 50mm Junction No. 16 -

L 50mm Access junxction No. 16 -

M 50mm Reducer No. 16 -

WATER SUPPLIES

PIPES (METHOD "B")

-

Page 42 of 58

Item Description Unit Qty Amount

BUILDINGS

PLUMBING AND DRAINAGE

WATER SUPPLIES

PIPES (METHOD "B")

Class 0 copper pipes

A 15mm Pipe m 80 -

B 22mm Pipes m 20 -

Extra over class 0 copper pipes for capillary

fittings

C 15mm Fittings No. 40 -

D 22mm Fittings No. 10 -

WATER HEATERS

Undercounter electric water heater

E

"Kwikot Prisma Classique" or similar and

approved 10litre under basin geyser

No. 2 -

GLAZING

GLAZING TO WOOD WITH PUTTY

6.38mm "Solarvue" or similar and approved

normal strength laminated coated safety glass

F Panes not exceeding 0.10m² m² 7 -

TOPS, SHELVES, DOORS, MIRRORS,

4mm Silvered float glass copper backed mirrors

with 10mm bevelled and polished edges holed

for and fixed with chromium plated dome

capped mirror screws with rubber buffers to

plugs in brickwork or concrete

-

Page 43 of 58

Item Description Unit Qty Amount

BUILDINGS (Continued)

GLAZING (Continued)

TOPS, SHELVES, DOORS, MIRRORS,

4mm Silvered float glass copper backed mirrors

with 10mm bevelled and polished edges holed

for and fixed with chromium plated dome

capped mirror screws with rubber buffers to

plugs in brickwork or concrete (Continued)

A Mirror size 600 x 900mm high No. 6 -

PAINTWORK

B

Attention is directed to the relevant sections of

the Model Preambles to All Trades which forms

a part of this Bill and must be read in

conjunction herewith 10 -

PAINTWORK ETC TO NEW WORK

ON FLOATED PLASTER

One coat alkali resistant primer, one undercoat

and two coats "Peralin PVA GRADE 1" acrylic

emulsion paint

C External smooth plastered walls m² 1,555 -

D Internal smooth plastered walls m² 515 -

E External smooth plastered concrete beams m² 4 -

F Internal smooth plastered concrete soffits m² 7 -

ON SMOOTH CONCRETE

One coat bonding liquid and two coats exterior

quality PVA emulsion paint

G

On sloping top, ? edge(s) and ? projecting

soffit(s) of copings ?mm girth

m 80 -

ON PLASTER BOARD

-

Page 44 of 58

Item Description Unit Qty Amount

BUILDINGS

PAINTWORK

PAINTWORK ETC TO NEW WORK

ON PLASTER BOARD

One coat alkali resistant primer, one coat

"Peralin SKIM COAT White" and two coats

"Peralin PVA GRADE 1" acrylic emulsion paint

A On ceilings and bulkheads m² 408 -

B On drywall partition m² 37 -

ON METAL

Spot priming defects in pre primed surfaces with

zinc chromate primer and applying one

undercoat and two coats alkyd enamel paint on

steel

C Columns and beams m² 186 -

ON WOOD

Spot priming bare wood surfaces with wood

primer in colours which have a value o 7 or less

on the Munsell system in accordance with

SABS 1091 on previously painted surfaces in

bad condition

D Fascia and barge boards m² 159 -

PAINTWORK ETC TO PREVIOUSLY

ON FLOATED PLASTER

One coat alkali resistant primer, one undercoat

and ? coat/coats ? alkyd enamel paint in

colours which have a value of 7 or less on the

Munsell system in accordance with SABS 1091

E

Internal smooth plastered walls previously

painted

m² 593 -

-

Page 45 of 58

Item Description Unit Qty Amount

BUILDINGS

PAINTWORK

PAINTWORK ETC TO PREVIOUSLY

ON FLOATED PLASTER

One coat alkali resistant primer, one undercoat

and two coats "Peralin PVA GRADE 1" acrylic

emulsion paint

A External smooth plastered walls m² 508 -

ON METAL

One coat aluminium primer, on undercoat and ?

coat/coats ? alkyd enamel paint in colours

which have a value of 7 or less on the Munsell

system in accordance with SABS 1091 on cast

iron

B Repaint previously painted roof m² 250 -

ON WOOD

Grain filling, two coats sanding sealer and ?

coat/coats ? clear lacquer

C Doors m² 81 -

D Glazed timber windows (both sides measured m² 18 -

E Window cills m² 6 -

F Floors m² 177 -

-

Page 46 of 58

Item Description Unit Qty Amount

Collection

BUILDINGS

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Page 47 of 58

Item Description Unit Qty Amount

EXTERNAL WORKS

BULK EARTHWORKS

SITE CLEARANCE, REMOVAL OF

Demolitions

Taking down and removing

A

Carefully take-up and remove existing 60mm

thick roadway concrete pavers and safely store

store on-site for later re-use

m³ 687 -

B Reinforced concrete footings m³ 15 -

C Existing 330mm retaining wall m² 89 -

D

Existing diamond mesh fence 2 400mm high

complete with ground and posts

m 143 -

E Sewer pipe not exceeding 2,0m deep m 36 -

F

Carefully take-up and remove existing precast

storm water channel 300 x 150mm thick and

safely store store on-site for later re-use

m 29 -

G

Break-up and remove existing brick gulley size

450 x 450 x 750mm deep

No. 1 -

Demolishing and removing

H

Single storey garage building with pitched roof,

6,0 x 3,m on plan and 2,80m high at eaves,

comprising unreinforced concrete surface bed,

220mm external walls, 110mm internal walls

and corrugated iron roof covering on timber

trusses (approximate dimensions given)

No. 1 -

I

Single storey ablution building with pitched roof,

3,0 x 1,50m on plan and 2,80m high at eaves,

comprising unreinforced concrete surface bed,

220mm external walls, 110mm internal walls

and corrugated iron roof covering on timber

trusses (approximate dimensions given)

No. 1 -

-

Page 48 of 58

Item Description Unit Qty Amount

EXTERNAL WORKS (Continued)

BULK EARTHWORKS (Continued)

SITE CLEARANCE, REMOVAL OF TREES,

ETC. (Continued)

Demolitions (Continued)

Demolishing and removing (Continued)

A

Single storey residential building with pitched

roof, 4,50 x 3,m on plan and 2,80m high at

eaves, comprising unreinforced concrete

surface bed, 220mm external walls, 110mm

internal walls and corrugated iron roof covering

on timber trusses (approximate dimensions

given)l No. 1 -

Site clearance

B

Digging up and removing rubbish, debris,

vegetation, hedges, shrubs, bush, etc and trees

not exceeding 200mm girth

m² 1,014 -

BULK EXCAVATION, FILLING, ETC.

Excavation in earth not exceeding 2m deep

C

Open face excavation to reduce levels including

forming platforms and compacting (Cut to fill)

m³ 279 -

Earth filling obtained from the excavations

and/or prescribed stockpiles on site compacted

to 95% Mod AASHTO density (unless otherwise

specified) in layers not exceeding 150mm thick

or 100% Mod AASHTO density in case of sand

D Filling over site to raise levels m³ 279 -

Approved earthfilling supplied by the Contractor

and compacted in layers not exceeding 150mm

thick well watered and compacted to 95% Mod

AASHTO density (Minimum CBR of 25 at 95%

Mod AASHTO Density; unlessa otherwise

specified)

-

Page 49 of 58

Item Description Unit Qty Amount

EXTERNAL WORKS (Continued)

BULK EARTHWORKS (Continued)

BULK EXCAVATION, FILLING, ETC.

Approved earthfilling supplied by the Contractor

and compacted in layers not exceeding 150mm

thick well watered and compacted to 95% Mod

AASHTO density (Minimum CBR of 25 at 95%

Mod AASHTO Density; unlessa otherwise

specified) (Continued)

A G5 filling over site to raise levels m³ 540 -

FENCING

SECURITY FENCING

B Hard rock m³ 34 -

"Betafence Securifor 358" or similar and

approved high-security fencing panel system

C

2 400mm High fence fixed to "securifor" post

(elswhere)

m 33 -

D

Sliding vehicular gate size 4 480 x 2 340mm

high complete including sliding tracks cast into

top of concrete beam (beam elswhere)

No. 0 -

"Betafence Securifor Post" or similar and

approved rectangular safety post with inserts for

frontal attachment of panels

E

"Betafence Securifor Post" size 80x60x2.5mm x

2 400mm high

No. 11 -

EXTERNAL PLUMBING AND DRAINAGE

SOIL DRAINAGE

PIPES

uPVC pipes

-

Page 50 of 58

Item Description Unit Qty Amount

EXTERNAL WORKS (Continued)

EXTERNAL PLUMBING AND DRAINAGE

SOIL DRAINAGE (Continued)

PIPES (Continued)

uPVC pipes (Continued)

A 110mm Pipes in ground not exceeding 1,0m m 107 -

B

110mm Pipes in ground exceeding 1,0m and

not exceeding 2,0m deep

m 36 -

C

110mm Pipes in ground exceeding 2,0m and

not exceeding 3,0m deep

m 54 -

Extra over uPVC pipes for fittings

D 110mm Bend No. 4 -

E 110mm Access bend No. 4 -

F 110mm Junction No. 4 -

G 110mm Access junction No. 4 -

H 110mm Reducing junction No. 4 -

I 110mm Double reducing junction No. 4 -

INSPECTION CHAMBERS, ETC.

J

Excavate for and build 30Mpa/19mm stone

unreinforced concrete inspection chamber size

1 200mm diameter internally with 12mm

diameter mild steel reinforcement bars in cover

slab with cast iron manhole cover (else where

measured), exceeding 2 000mm and not

exceeding 3 000mm deep to invert

No. 1 -

K

"Securex Y-560-C" or similar and approved Cast

iron single seal manhole cover and frame

No. 1 -

-

Page 51 of 58

Item Description Unit Qty Amount

EXTERNAL WORKS

EXTERNAL PLUMBING AND DRAINAGE

TAPS, VALVES, ETC.

Cobra watertech

A

25 x 25mm "Universal / 1002/125-25" Brass full

flow FxF gate valve

No. 1 -

B

15 x 15mm "Universal 1002/125-15" Brass full

flow FxF gate valve

No. 1 -

Kent

C

25mm "PSM / AB813-893" 198mm Brass

bodied water meter

No. 1 -

D

"DW407 / DW457" Black water meter box with

blue lid

No. 1 -

WATER SUPPLIES

PIPES

H.D.P.E. type IV pipes class 10 to SABS 533

E 25mm Pipe m 36 -

Extra-over H.D.P.E. type IV pipes class 10 for

compression fittings

F 25mm Fittings No. 15 -

DRIVE WAYS AND PARKING

EARTHWORKS

Approved filling supplied by the Contractor

G

Selected layer under floors, pavings, etc. of

type G5 natural gravel well watered and

compacted to 95% Mod AASHTO density

(Minimum CBR of 25 at 95% Mod AASHTO

Density) m³ 181 -

-

Page 52 of 58

Item Description Unit Qty Amount

EXTERNAL WORKS

DRIVE WAYS AND PARKING

EARTHWORKS

Compaction of surfaces

A

Road bed preparation as per SABS 1200DN

150mm deep, compacted to 93% Mod AASHTO

m² 1,208 -

PAVING

Type S-A paving blocks laid to standard Double

ZigZag pattern on and including 25mm thick

river sand bed with dry filler sand swept and

vibrated into joints all laid on subgrade

(elsewhere) conforming to SABS1200D Degree

Of Accuracy I

B

Paving to "3 sizes Cobble and Flagstone"

pattern on and including 50mm sand bed with

sand swept into joints including preparation of

ground or filling m² 1,208 -

Precast concrete bedded on and including

15MPa/19mm unreinforced concrete base

(0,05m3/m) and jointed and flush pointed in 3:1

cement mortar, including 20MPa/19mm

unreinforced concrete haunching at back of

each kerb and any necessary excavation,

formwork, ramming, etc.

C 50 x 250mm Garden kerb m 173 -

D 50 x 250mm Garden kerb circular on plan m 3 -

E 250 x 125mm Mountable kerb m 21 -

-

Page 53 of 58

Item Description Unit Qty Amount

Collection

EXTERNAL WORKS

-

-

-

-

-

-

-

Page 54 of 58

Item Description Unit Qty Amount

OTHER CONTRACTS AND SUNDRY

ELECTRICAL INSTALLATIONS

Electrical installations

A

Total from Annexure "A" - Electrical Installation

brought forward

Item 1 -

B

Total from Annexure "B" - Electronic Installation

brought forward

Item 1 -

MECHANICAL INSTALLATIONS

Mechanical installations

C

Total from Annexure "C" - HVAC Installation

brought forward

Item 1 -

OTHER SPECIALIST INSTALLATIONS

Landscaping

D

Allow the Sum of N$ 100,000.00 (ONE

HUNDRED THOUSAND NAMIBIA DOLLARS

NETT) for the Landscaping Installation executed

complete Item 1 -

Signage

E

Allow the Provisional Amount of N$ 100,000.00

(ONE HUNDRED THOUSAND NAMIBIA

DOLLARS NETT) for Signage an d Artwork

executed complete Item 1 -

Balustrade

F

Allow the Sum of N$ 50,000.00 (FIFTY

THOUSAND NAMIBIA DOLLARS NETT) for

the Balustrading Installation executed complete

Item 1 -

Material testing

G

Allow the Provisional Amount of N$ 150,000.00

(ONE HUNDRED AND FIFTY THOUSAND

NAMIBIA DOLLARS NETT) for Material Testing

executed complete Item 1 -

Page 55 of 58

-

Item Description Unit Qty Amount

OTHER CONTRACTS AND SUNDRY

CONTINGENCIES AND ESCALATION

Contingencies

A

Allow the contingent sum of N$ 500,000.00

(Five Hundred Thousand Namibia Dollars) for

general contingencies to be used as directed by

the Project Manager and to be deducted in part

or whole if not required

Item 1 -

-

Page 56 of 58

Item Description Unit Qty Amount

Collection

OTHER CONTRACTS AND SUNDRY ITEMS

-

-

-

Page 57 of 58

Item Description Amount

Summary

PRELIMINARIES AND GENERAL -

BUILDINGS -

EXTERNAL WORKS -

OTHER CONTRACTS AND SUNDRY ITEMS -

NET CONSTRUCTION COST EXCLUDING VAT NAD -

PLUS: VAT 15% -

TOTAL CONSTRUCTION COST TO BID DOCUMENT NAD -

Page 58 of 58

TECHNICAL SPECIFICATION FOR CONSTRUCTION AND RENOVATION OF THE

BIPA PROPERTY ON ERF 8681 WINDHOEK

PROJECT NO: 2518

SUPPLY, DELIVERY AND INSTALLATION OF THE ELECTRICAL

INSTALLATION WORKS

Architect – Principal Agent Civil/Structural Engineers

Marley Tjitjo Architects Denchi Consulting Engineers

Tel: (061) 220 604 P.O. Box 80352

P.O.Box 96088 Tel: (061) 228 183

WINDHOEK WINDHOEK

Quantity Surveyors Electrical/Mechanical Engineer

Dawid Nell Quantity Surveyors Denchi Consulting Engineers

Tel: (061) 244 779 Tel: (061) 228 183

P.O.Box 40113 P.O. Box 80352

WINDHOEK WINDHOEK

BIDDER’S NAME : ......................................................

BID AMOUNT : ......................................................

DATE : ......................................................

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid Documentation\Electrical\2518 - Elec

Tech.Spec.doc

1.1

CONTENTS

PART DESCRIPTION PAGES

I LIST OF DRAWINGS..............................................…...................................1.1

II DETAILED TECHNICAL SPECIFICATIONS.................................................2.1

III DOCUMENTS TO BE COMPLETED BY ELECTRICAL BIDDER…………...3.1

IV BILL OF QUANTITIES…………………………………………………………….4.1

IIV SCHEDULE OF RATES FOR VARIATIONS……………………………………8.1

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

1.1

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY

BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RENOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRICAL INSTALLATIONS

PART I: LIST OF DRAWINGS

The following drawings apply to this project:

1. DRAWINGS

Drawing No. Title

2518 - E-01 LIGHTING LAYOUT

2518 - E-02 POWER LAYOUT

2518 - E-03 DB SCHEMATICS

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY

BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RENOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRICAL INSTALLATIONS

PART II: DETAILED TECHNICAL SPECIFICATION

1. SCOPE OF CONTRACT

This Contract covers in broad terms the supply, delivery, erection, commissioning, and maintenance

guarantee for 12 months of the electrical installation as specified below:

(a) Existing Building, New Building and Guard house electrical installations

(b) Supply and installation of Distribution Boards

(c) Supply and installation of 10kVA UPS

(d) Supply and install wire ways for electronic services

(e) Supply installation and commissioning of the Generator, and Change Over

All the Bidders shall submit certified proof of a valid license issued by CoW, to carry out

installation works on 400V installations in the CoW operational area.

2. STANDARDS

All material and equipment supplied and/or installed under this contract shall be new and the best of

their respective kinds and shall comply with the requirements laid down in the latest editions of the

relevant SANS and their amendments (if any) and the requirements of this Specification.

In event of items bearing the SANS mark being available in respect of the materials and equipment

required, only items bearing this mark will be acceptable. The workmanship under this Contract shall

be of a high standard and to the satisfaction of the Engineer.

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

3. VALUE ADDED TAX, IMPORT TAXES AND DUTIES

Bidders shall allow in their tender for all VAT, Import Taxes and Duties, to be paid in respect of all

items of material, labour and equipment to be supplied in terms of this Contract where relevant. The

successful Bidder will be liable and responsible for paying all VAT, Import Taxes and Duties.

4. RADIO- AND TV-INTERFERENCE

All equipment installed under this contract shall comply with the Government Notice No. R.2246 and

any other applicable rules and regulations in respect of radio- and TV-interferences. Any equipment

found producing interference after commissioning, shall be suppressed or replaced to the satisfaction

of the Engineer without any additional cost.

5. REGULATIONS

The work shall be carried out strictly in accordance with and all material and equipment supplied shall

comply with the following laws and regulations where applicable.

a) The latest edition of the "Code of Practice for the Wiring of Premises", SANS 10142 as

amended.

b) The "Electricity Supply By-Laws and Regulations" of the Supply Authority.

The Contractor will be responsible for serving all notices and paying all fees due in terms of the

above laws and regulations.

6. LOCAL SYSTEM AND OPERATING CONDITIONS

All materials and equipment supplied and/or installed under this Contract shall be suitable for

satisfactory operation and shall have prescribed characteristics under the following conditions:

a) Ambient Operating Conditions

i) Altitude: 1 090 metres above sea level

ii) Minimum ambient temperature: -5 Degrees Celsius

iii) Maximum ambient temperature: +40 Degrees Celsius

iv) Humidity: Up to saturation point

b) Electrical System Particulars

11 kV-systems

11 000 volt, 3-phase, 3-wire, 50 Hz AC system with LT neutral earthed.

LT System

400V, 3 phases, 4 wires, 50Hz AC with earthed neutral

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

7. DRAWINGS AND INFORMATION TO BE SUBMITTED

Drawings and information to be submitted on completion of the Works:

i) Two sets of paper prints of all the drawings showing all "as built" features of the installation.

ii) One set of sepia prints for the drawings in (i) above.

iii) Three complete sets of operating and maintenance manuals containing all drawings, test

certificates, settings of equipment as commissioned, installation, commissioning and

maintenance details, operating instructions, as well as a complete list of spare parts with

reference numbers and technical description to enable the client's technical personnel to

maintain service and repair the installation.

8. TEST CERTIFICATES AND TESTS

8.1 Where test certificates are required for individual pieces of equipment, these shall be submitted to the

Engineer for approval immediately on receipt of such certificates.

8.2 Where witnessing of tests is required by the Engineer, arrangements shall be made by the Contractor

for the Engineer to witness such tests.

9. BUILDER'S WORK

The Electrical Contractor shall be responsible for the making good of all builder's work connected

with conduits, outlet boxes, distribution boards, cable entry sleeves etc., i.e. conduits installed in

chases shall be covered by a layer of coarse sand and cement and backfilling around cable entry

sleeves shall be compacted to 93% Mod AASHTO density.

10. DISTRIBUTION BOARDS & KIOSKS

10.1 General DB’s

i) General DB:

The main DB shall be surface mounted. The boards’ locations are indicated on the power

layout. The main DB shall be built to EN60439-1.

ii) UPS Distribution Boards:

The distribution boards shall be surface mounted in the server room provided unless otherwise

stated. The size of the DB's must be such that 20% spare space for future new circuits must be

allowed for. All DB's are to have doors with square key or ring type locking facilities.

Plastic locking mechanisms shall not be accepted. Switchgear is to be Legrand or Merlin Gerin

manufacture or equal approved. Fault levels and schematics are as indicated on relevant

schematic drawings.

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

11. BUILDING INSTALLATIONS

11.1 Lighting

11.1.1 General

All light switches shall be 16A type Crabtree or equal approved, colour white, mounted 1200mm

above finished floor level.

All light circuits shall be wired using 2,5mm² conductors. All earth wires are to be bare copper earth

wires.

Schedule and mounting of luminaires:

TYPE LUMINAIRE DESCRIPTION (OR EQUAL APPROVED)

RUBICON LIGHTING, Aegeon LED Downlight, non-dim, white, 100-110deg beam

A

angle, HL,120lm/w, 4K, 20W (or equal and approved)

RUBICON LIGHTING, AEMELIA SURFACED MOUNTED LED

A1

DOWNLIGHT,12W LED, 4000K, 960 LUMENS (or equal & approved)

RUBICON LIGHTING, THEI 600mmx600mm LED PANEL INCL. SURFACE

B MOUNT> KIT, 30W LED, 4000K (or equal & approved)

RUBICON LIGHTING, 1230mm LONG OPEN CHANNEL FITTING INCL. 2X18W

C

LED TUBES, IP20, WHITE (or equal & approved)

D BRIGHT STAR LIGHTING, PEN642 RATTAN PENDANT, 60W LED

SPAZIO LIGHTING, RATIONAL, RECESSED LED FOOTLIGHT, 3000K, 2W,

E LED

F RUBICON LIGHTING, SATURN, 1 x 24W, LED, BULKHEAD BLACK (or equal &

approved)

S

SPAZIO LIGHTING, OZO-SLIM DOWN FACE 3CCT

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

All light fittings shall be supplied and installed complete with lamps, ballasts control gear, diffusers,

mounting rings, etc as applicable. All fixing screws shall be stainless steel or brass (none corroding).

11.2 16A Switched socket outlets

Socket outlets shall be Legrand 16A switched, colour white and mounted as indicated on the

drawing. Socket outlet should be installed as specified below.

(i) Single 16A switched socket outlet in trunking and flush

(ii) Socket outlet with 1xschuko plug in trunking and flush

Wiring shall be 4mm² conductors and 4mm² bare copper earth wire.

All socket outlets shall be manufactured by one manufacturer to make for a standard uniform

installation. Suitable socket outlet installations shall comply with SANS standard at all the times.

11.3 Telephone/Data points

The telephone installation shall be in accordance with the requirements of the specification for

"Facilities for Telecommunication Services in Buildings" 1988 issued by the Namibian Post Office and

Telecommunication Services. All cable sleeves and conduits are to be equipped with 1.6mm and

1.2mm diameter galvanised steel draw wires respectively.

11.3.1 Flush Wall Telephone Point

Telephone points shall comprise 100mm x 100mm flush conduit boxes complete with Legrand white

cover plate fitted with RJ45 outlet. Conduits shall be 25mm dia.

11.3.2 Skirting Telephone Point

Telephone and data points in skirting trunking shall be RJ45 type Legrand Mosaic or equal approved.

11.4 Air-Conditioner Isolators

The weatherproof AC Isolators are to be Clipsal for externally mounted outdoor units. The Electrical

Contractor is to ascertain the exact installation positions of outdoor units to allow installation of

isolators in proximity. The AC Contractor shall also be responsible for the final AC connections.

11.5 Single phase isolator points (flush type)

Flush isolators shall be Legrand Alteor 20A double pole flush type or equal approved and conductors

shall be 4mm² conductors with 4mm² bare copper earth wire for single-phase units. Isolators for

larger power ratings shall be as detailed.

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

11.6 Power skirting

Power skirting shall be Legrand type, 2-compartment or equal approved. Dimensions shall be 65mm x

195mm. Power skirting shall be fixed to the wall and supported by the floor surface. The power skirting shall

come complete with body joints, dividers, endcaps, internal angles, external angels, flat angle and joints as

may be required. All sockets and outlets shall be Legrand Mosaic type and white in colour.

12. LT CABLE INSTALLATION

12.1 General

The LT cable installation shall be in accordance with the Standard Specification and SANS 10142 as

amended.

12.2 LT Cable installation

All cables shall have standard copper conductors and shall be of the PVC SWA PVC type,

600/1000V Grade and shall comply with SABS 15078-1990. All cables shall be labeled with an

approved tag on both sides identifying the cable by number. Cable numbers will be issued later but

cable prices are to be included for the cable identification tags.

13. CABLE RACKING

14.1 Welded wire mesh

Welded wire mesh cable trays shall be hot-dipped galvanized to minimum 20 microns and complete

with purpose made 45° and 90° bends and support system complete with 8mm threaded suspension

rods etc. The mesh shall be 300mm & 150mm wide with a side-height of 60mm.

14.2 Channel

Cable channels shall be ceiling mounted and be supplied complete with 8mm threaded support rods

and supports. The channel shall be P-8000 or P-9000 as specified, type ‘O’ line or equal approved.

15. UPS SYSTEMS

The UPS shall be rated 10kVA, 230V, 1 phase, as detailed.

15.1 General:

The UPS unit shall have a unit rating of 10kVA and with 30-minute battery capacity at full load. The UPS shall

be manufactured to Eaton 9SX UPS or equal approved as follows:

(i) On-line with double conversion technology.

(ii) Input power factor greater than 0,95 and THDI less than 28% for load between 50% and

100%.

(iii) Static and manual by-pass.

(iv) Sealed batteries with 10-year guarantee.

(v) In-built battery monitor.

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

(vi) Temperature sensor.

Warranty:

The rectifier / charger and inverter subassemblies shall be guaranteed (parts and labour on

site) for one year following the start-up date.

15.2 TECHNICAL REQUIREMENT FOR NEW UPS SYSTEMS

i) OPERATING PRINCIPLES

a) The UPS unit shall operate in double-conversion mode (also called on-line mode), it shall be a

VFI-type UPS (as per standard IEC 62040-2), made up of the components described in detail in

this specification.

b) Normal operation (normal AC source available): The rectifier supplies the inverter with DC

current while the charger simultaneously floats charges the battery. The load is continuously

supplied with dependable electrical power by the inverter.

c) Operation on battery power (normal AC source not available or outside tolerances): Upon failure

or excessive deterioration of the normal AC source, the inverter shall continue to supply the load

from battery power without interruption or disturbance, within the limits imposed by the specified

battery backup time.

d) Battery recharges (normal AC source restored): When the normal AC source is restored, the

rectifier shall again power the inverter, without interruption or disturbance to the load, while the

charger automatically recharges the battery.

e) Transfer to bypass AC source:

i) In the event of an overload exceeding system capabilities (short-circuits, heavy inrush

currents, etc.) the load shall be automatically transferred, instantaneously and without

interruption, to the bypass AC source, on the condition that bypass power is available

and within tolerances.

ii) To ensure transfer in complete safety, the system shall simultaneously control the static

switches.

f) UPS maintenance:

i) For maintenance purposes, all electronic components shall be accessible from the front of

the UPS.

ii) In addition, a built-in manually operated mechanical bypass system shall be installed in UPS

unit.

iii) For personnel safety during servicing or testing, this system shall be designed to isolate the

UPS units while continuing to supply power to the load from the bypass AC source. Transfer

to the manual bypass mode and back shall be possible without interruption to the load.

iii) The UPS shall also include a device making it possible to isolate the rectifiers and the charges

from the normal AC source.

g) Battery maintenance:

For safe maintenance on the battery of each UPS unit, the system shall include a circuit breaker

to isolate the battery from the rectifier/charger and inverter. When the battery is isolated from

the system, the UPS shall continue to supply the load without interruption or disturbance, except

in the event of a normal AC source outage.

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

(i) Cold start (normal AC source absent):

The battery of each UPS shall be capable of ensuring UPS start-up even if normal AC power is

not available and continuing operation within the specified back-up time (start on battery power

shall be possible on the condition that the system was already started with AC power present).

15.3 SIZING AND GENERAL CHARACTERISTICS:

i) Technology: The UPS system shall be based on six-pack IGBT technology with built-in

thermal monitoring and a high free-frequency chopping mode to dynamically optimise

efficiency and power quality.

ii) Rating:

• The UPS system shall be sized to continuously supply the rated load, at a power factor (pf)

of 0.9.

• The System shall be made up of 1 x 10kVA UPS units, with 30 minutes backup.

iii) Battery backup time:

• The backup time of each battery in the event of a normal AC source outage shall be 30

minutes for UPS

• The service life of each battery shall be equal to at least 10 years.

• Batteries shall be selected and size accordingly.

iiii). Types of loads accepted:

• If all the connected loads are non-linear (100% non-linear loads), the UPS unit shall accept

high crest factors (3:1) without derating of output.

• For both linear and non-linear loads, the voltage total harmonic distortion at UPS output:

 THDU downstream ph/ph and ph/N ≤1.5% for linear loads.

 THDU downstream ph/ph and ph/N ≤3.5% for non-linear loads.

iv) Limitation of harmonics upstream of the UPS system:

• The UPS system shall now draw a level of harmonic currents that could disturb the

upstream AC system, i.e. it shall comply with the stipulations of guide IEC 61000-3-4

(formerly IEC 1000 3-4).

• In particular, the UPS shall respect the following characteristics at the normal AC input:

• Total harmonic current distortion (THDI) upstream of the rectifier not exceeding:

a) -3% at full rated load for an RCD (computer) load, at Pn,

b) -5% from 30% to 100% of the full rated load,

• Input power factor (pf) greater than or equal to 0.9.

• These performances levels, due to the “clean” input rectifier drawing sinusoidal current,

limit upstream distortion and avoid oversizing of upstream equipment (cables, circuit

breakers, etc.), without requiring additional filters.

i) Efficiency:

Overall efficiency of the UPS unit shall be greater than or equal to: 95% @ full load.

ii) Noise level:

The noise level, measured as per standard ISO 3746, shall be less than: 66 dBA.

15.4 AC SOURCES:

(ii) Normal AC sources (rectifier input): The normal AC source supplying the UPS shall,

under normal operating conditions, have the following characteristics:

• Rated voltage230V at full rated load.

• Number of phases: 1ph + earth. The neutral is not necessary.

• Frequency: 50Hz ± 8%.

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

i) Bypass AC sources (static-bypass input, if separate from rectifier input):

• The bypass AC source shall continue to supply the load, without interruption, if its

characteristics remain within voltage tolerances (220-230volts).

• Outside these tolerances, it shall be possible to supply the load, but in downgraded mode.

15.5 ELECTRICAL CHARACTERISTICS:

a) Rectifier and charger:

i) Supply: The rectifier and charger module shall be supplied via the normal AC input. It

must be capable of operating without a neutral.

ii) Inrush current: A device shall be provided to limit inrush currents. When AC power

fails and during genset start, the rectifier shall limit the power drawn to 70% of its rating fro

ten seconds. The remaining 30% shall be supplied by the battery.

iii) Operating mode: The standard charger shall be sized to recharge the battery rapidly

iv) Battery-current limiting: For long battery life, an electronic device shall automatically

limit the charging current to the maximum value specified by the battery supplier (0.1 x

C10 for a sealed lead-acid battery).

v) Voltage regulation: Rectifier / Charger regulation shall consider the ambient

temperature of the battery and shall ensure DC output voltage fluctuations of less than 1 %

irrespective of load and AC input voltage variations (within the specified limits).

b) Batteries: the UPS unit shall be equipped with its own battery as follows:

i) Batteries in a separate cabinet:

• Sealed lead-acid type, factory mounted and wired in a cabinet identical to that of the UPS

with a service life of 10 years.

• The battery shall be installed in a cabinet identical in appearance to that of the UPS.

• The battery shall be sized to ensure continuity in the supply to the inverter for at least 30

minutes for the 8kVA UPS units.

ii) Each battery shall be sized to ensure continuity in the supply of power to the corresponding

inverter for the stated time, in the event of a normal AC source failure, with the inverter

operating at full rated load.

iii) Sizing calculations shall assume an ambient temperature between 0ºC and 40ºC.

iv) The UPS system shall include devices to ensure:

• Effective battery protection,

• Battery management,

c) Inverter: the inverter shall be sized to supply a load rated at a power factor (pf) of 0.8 taking into

account the characteristics presented below:

d) Output voltage:

(i) Rated voltage:

230 volts rms, adjustable via the user interface within tolerance of ±3% for the 8kVA UPS.

(ii) Number of phases:

1 phase + natural + earth for 8kVA.

(iii) Steady-state conditions:

The variation in the rated voltage shall be limited to ±2% for a balanced load between 0 and

100% of the rated power, irrespective of normal AC input and DC voltage levels, within the

specified limits.

(iv) Voltage variations for load step changes:

Output voltage transients shall not exceed ±1% of rated voltage for 0 to 100% or 100 to 0%

step loads. In all cases, the voltage shall return to within steady-state tolerances in less than

100 milliseconds.

e) Output frequency:

(i) Rated frequency: - 50Hz

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

(ii) Variations: -±0.5 Hz

f) Synchronisation with bypass power:

(i) When bypass power is within tolerances:

To enable transfer to bypass power, the inverter output voltage shall be synchronised with

the bypass source voltage whenever possible. To that end, during normal operation, a

synchronisation system shall automatically limit the phase deviation between the voltages to

3 degrees, if the bypass source frequency is sufficiently stable (within adjustable tolerances

of ±0.5% to ±0.8% with respect to rated frequency).

(ii) Synchronisation with an external source:

It shall be possible to synchronise with all types of external source. For example, if the

bypass source is a generator set, the synchronisation tolerances shall be approximately ±8%

(adjustable) with respect to the rated frequency.

(iii) Autonomous operation following loss of synchronization with bypass power:

When the bypass source frequency deviates beyond these limits, the inverter shall switch

over to free-running mode with internal synchronisation, regulating its own frequency to

within ±0.1%. When bypass power returns to within tolerances, the inverter shall

automatically resynchronise.

(iv) Variation in frequency per unit time:

During the switch to free-running mode and the switch back to synchronised mode,

frequency variations per unit time (dF/dt) shall be limited to 1 Hz/s or 2 Hz/s (user defined).

g) Overload capacity:

(i) 10 minutes at a load representing 125% of the rated load.

(ii) 1 minute at a load representing 150% of the rated load.

(iii) 1 second at a load representing 210% of the rated load.

(iv) If necessary, the UPS shall operate as a generator (current limiting) with a peak capacity of

270% for 150 milliseconds, to allow highly disturbed transient operating states (high

overloads, very high crest factors, etc.) without transferring the load to the bypass.

h) Static bypass: Load transfer to the static bypass:

• The UPS unit shall be equipped with a static bypass comprising a static switch. The static

bypasses shall be controlled simultaneously by a built-in system. Instantaneous transfer of

the load form the inverters to bypass power and back shall take place without a break or

disturbance in the supply of power to the load, on the condition that the bypass source

voltage and frequency are within the specified tolerances and that the inverters are

synchronised.

• Transfer shall take place automatically in the event of a major overload or an internal inverter

fault.

• Manually initiated transfer shall also be possible.

• If the bypass power is outside the specified tolerances or is not synchronised with the

inverter, automatic transfer of the load from the inverter to bypass power shall take place

after a calibrated interruption adjustable from 13 to 1000 ms.

i) Static-switch protection:

• Each static switch shall be equipped with an RC filter for protection against switching

overvoltage’s and lightning strikes.

j) Discrimination and short-circuit capacity:

• If the bypass power is within the specified tolerances, the presences of the static switch shall

make it possible to use the short-circuit power of the bypass source to trip the downstream

protection devices of common inverter output.

• To ensure tripping in a selective manner, the available power shall be sufficient to trip

protection devices with high ratings (circuit breaker rated In/2 or UR fuses rated In/4, where

In is the rated UPS-system current).

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

• If the bypass source is outside the specified tolerances, the UPS system on its own shall, for

the same discrimination requirements, be capable of tripping circuit breakers rated In/2 or UR

fuses rated In/4, irrespective of the type of short-circuit.

• Parallel; connection of a number of UPS units significantly improves discrimination.

k) System earthing arrangements:

The UPS shall be compatible with the local system earthing arrangement.

15.5 MECHANICAL CHARACTERISTICS:

(i) Mechanical structure:

The UPS and batteries shall be installed in cabinet(s) with a degree of protection IP20 (standard

IEC 60529). Access to the subassemblies making up the system shall be exclusively through the

front.

(ii) Scalable design (Concerns only UPS with the battery installed in a separate cabinet):

• The UPS shall be designed to allow the installed power to be easily increased on site by

connection of additional UPS units, either to meet new load requirements or to exchange

system availability by introducing redundancy.

• The transformation shall be possible directly on site, without returning the equipment to the

factory and without causing excessive system downtime.

(iii) Dimensions:

The UPS shall require as little floor space as possible. To gain space, it shall be possible to

install the UPS with the back to the wall.

(iv) Connections

• To facilitate connections, all terminal blocks must be easily accessible from the front when

the UPS is installed with back to the wall. Entry of upstream and downstream power cables,

as well as any auxiliary cables, shall be possible through the bottom for a false floor.

• The UPS shall be equipped with an earth-circuit connector, in compliance with the listed

standards.

• The cables shall comply with the listed standard and be mounted in compliance with the

stipulations. The neutral conductor shall be oversized for any third-order harmonic currents

and their multiples (the size of the neutral shall be 1.5 times that of each phase).

(v) Safety:

• The equipment shall meet the requirements of degree of protection index IP21, in

compliance with standard IEC 60529.

• For the safety of maintenance personnel, the cabinet shall be provided with a manually

operated mechanical bypass designed to isolate the rectifier, charger, inverter and static

switch while continuing to supply the load from the bypass AC source.

• It shall be possible to send to the UPS an external EPO order resulting in opening of the

battery circuit breaker and the upstream circuit breaker.

(vi) BATTERY MANAGEMENT:

a) Battery meter:

A battery-meter function shall estimate the available backup time of the UPS system as a

function of the battery charge and the percent load. It shall be possible to set the battery meter

so that it can take into account the exact battery configuration installed with the UPS.

b) Digital battery monitoring:

• The UPS shall be equipped with a system for battery digital management.

• Based on a number of parameters (percent load, temperature, battery type and age), the

system shall control the battery charge voltage and continuously calculate:

1) The true available backup time,

2) The remaining service life,

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

15.6 DISPLAYS AND CONTROLS:

(i) User interface:

The UPS operation shall be facilitated by a user interface, comprising:

(a) A graphic display (at least quarter VGA and high resolution are preferable),

(b) Controls,

(c) Status indications with mimic panel,

(d) The information and controls shall be centralised by a system (electronic board) built into

one of the UPS units.

(ii) Graphic display:

The graphic display shall facilitate operation by offering the functions listed below:

(a) Operating language:

It shall be possible to display in the English language all the operating information supplied

on the screens.

(b) Step by step operating help:

The graphic display shall assist the user by providing step by step help in the user’s

language.

(c) Animated colour mimic diagram:

The mimic diagram shall enable display of installation parameters, configuration, operating

status and alarms and indication of operator instructions for switching operations (e.g.

bypass).

(d) Display of measurements:

  • shall be possible to display the following measurements:
  • It Inverter output phase-to-phase voltages,
  • Inverter output currents,
  • Inverter output frequency,
  • Voltage across battery terminals,
  • Battery charge or discharge current,
  • Rectifier/charger input phase-to-phase voltages,
  • Rectifier/charger input currents,
  • Crest factor,
  • Active and apparent power,
  • Power factor of the load,
  • Battery temperature,

(c) Display of status conditions and events:

It shall be possible to display the following indications:

  • Load on battery power,
  • Load on UPS,
  • Load on automatic bypass,
  • General alarm,
  • Battery fault,
  • Remaining battery backup time,

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

  • Low battery warning,
  • Bypass AC source outside tolerances,
  • Battery temperature,
  • Additional information shall be provided in view of accelerating servicing of the system.

(d) Controls:

The UPS shall comprise the following controls:

• Two ON and OFF buttons: Located on the front panel of the UPS, they shall control UPS

unit ON/OFF status. It shall be possible to turn OFF the UPS externally via an isolated dry

contact.

• EPO terminal block: The UPS shall be equipped with an emergency power off

terminal block for complete system shutdown following reception of an external

control signal. The EPO command shall result in:

 Shutdown of UPS units,

 Opening of the static switch on the bypass line and of the battery circuit

breaker,

 Opening of an isolated dry contact on the programmable card,

• Alarm reset button: This button shall turn off audio alarms (buzzer). If a new alarm

is detected after clearing the first, the buzzer sounds again.

15.7 COMMUNICATION:

a) Standard communication: It shall be possible to remote the following controls, indicators

and measurements. To that end, the UPS unit shall have standard equipment.

(i) A programmable card for input/output information. This card shall provide eight dry

contracts: six for incoming information and two for outgoing information.

(ii) At least three communication ports for later addition, without interrupting operation of

communication cards implementing different protocols, e.g. SNMP, J Bus/ModBus, RS232,

USB, XML.

15.8 OPERATION:

15.9.1 PROTECTION:

a) UPS: The UPS shall include protection against AC-source overvoltage’s (as per standard IEC 60146),

excessive external or internal temperature rise and vibrations and impacts during transport.

b) Rectifier and charger: The rectifier and charger shall automatically shut down if the DC voltage reaches

the maximum value specified by the battery manufacturer or if the temperature exceeds the limits specified

above.

c) Inverter: Inverters shall self-protect against overloads and short-circuits, irrespective of the operation

mode (AC power or battery power).

d) Batteries:

(i) Protection against deep discharge and self-discharge: the UPS shall comprise a device

designed to protect the battery against deep discharges, taking into account the characterises of the

discharge cycles, with isolation of the battery by a circuit breaker.

(ii) Independent regulation and monitoring system:

• A regulation system shall regulate the battery voltage and the charge current.

• A second system, independent of the regulation, shall monitor the battery voltage and the

charge current. Consequently, if the regulation system fails, the monitoring system steps in to

shut down the charger and avoid overcharging.

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

(iii) Regulation of the battery voltage depending on the ambient temperature:

• A temperature sensor adapts the charge voltage to the ambient temperature.

• This regulation system takes into account the chemical reaction and prolongs the battery service

life.

• The permissible temperature range is set in the personalisation parameters.

• An alarm shall be issued for temperatures outside the permissible range.

(iv) Self-test:

• An automatic device shall carry out Battery monitoring. Self-test intervals shall be set to one

month by default, but shall be adjustable.

• This self-test system shall, where necessary, initiate indications via LEDs on the front panel or a

message to a remote monitoring system.

15.9.2 MAINTAINABILITY:

Local and remote diagnostics and monitoring - E. Services: The UPS shall be equipped

with a self-test system to check operation of the system each time it is started. To that end, the

supply control/monitoring electronics shall offer:

a) Auto-compensation of component drift,

b) Acquisition of information vital for computer-aided diagnostics or monitoring (local or

remote):

c) Overall readiness for remote supervision services provided by the manufacturer.

15.9.3 STANDARD AND TESTS:

All equipment shall be designed and built-in accordance with accepted engineering practice and

applicable international standards, listed below:

a) IEC 6014A-4: UPS – Safety,

b) IEC 62040-1 and EN 62040-1: UPS – Safety,

c) IEC 62040-2 and EN 62040-2: UPS – Electromagnetic compatibility – (level C3 / C2 class A

is optional),

d) IEC 62040-3 and EN 62040-3: UPS – Performance,

e) IEC 60950 / EN 60950: Safety of IT equipment, including electrical business equipment.

f) IEC 61000-2-2: Compatibility levels for low-frequency conducted disturbances and signalling

in public low-voltage power supply systems.

g) IEC 61000-3-4: Limits for harmonic current emissions (equipment input current >16 A/ph.

h) IEC 61000-4: EMC – Electrical fact transient/burst immunity.

i) EN 55011 and EN 55022: Limits and methods of measurement of radio interference

characteristics and industrial, scientific and medical (ISM) radio-frequency equipment-Level

A conducted and radiated emissions.

j) IEC 439: Low-voltage switchgear and control gear assemblies.

k) IEC 60529: Degrees of protection provided by enclosures (IP Code)

l) ISO 3746: Sound power levels

m) CE making

What is more, the equipment must comply with environmental-protection standards, with

production taking place on premises certified ISO 14001. The UPS design procedure shall be

covered by an ISO 9001 quality system as well as a dependability study to ensure maximum

reliability.

c) Certification of conformity: The manufacturer shall provide, on request, a complete

qualification fire demonstrating compliance with the above standards. What is more, the

indicated levels of performance shall be confirmed by certification from independent

laboratories (e.g. TUV or Veritas)

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

15.10 BACKUP SERVICES:

a) Maintenance: The supplier shall propose contracts covering two levels of maintenance.

1) Level one: simple checks and settings, procedures accessible without any dismounting and

involving no risk.

2) Level two: preventive maintenance, check not inhibiting continuous operation of the system

and preparing operations for Manufacturer services.

b) Technical competency:

Customer operations: the supplier shall offer a training programme

Service personnel: the supplier shall ensure that service personnel are qualified.

c) System start-up: the system and equipment shall be started up on site by the supplier or its

authorised agent. The procedure shall include checks on the characteristics of the upstream

and downstream protection devices and on the UPS installation parameters.

d) Replacement parts: The supplier shall undertake to provide certified original replacement parts

for at least ten years following the date of delivery.

16 UPS CABINET

All the UPS must be installed in the closed cabinet as specified below.

(i) Floor-standing cabinet, 25U glass door must be installed in the UPS room

(ii) Dimensions: 1250x600x800

(iii) Cable Entry: Top and Bottom

(iv) Colour: Gray

(v) Protection Degree: IP 20

17 EARTHING AND BONDING

17.1 Bonding

All exposed metal parts including roofs, gutters, down pipes, waist pipes etc. shall be bonded in

accordance with SANS 10142 as amended.

17.2 Building Earths

The building earth shall be supplied and installed by a specialist earthing company.

17.3 Distribution board Earths

Each ground level distribution board shall be earthed by using the supply cable earth conductors.

18 USER OPERATING & MAINTENANCE TRAINING

This type of training shall be provided on site by the system manufacturer/supplier and shall be

scheduled as follows,

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

• During system commissioning

• At practical completion

• During defects liability period

Training shall involve a familiarization course for at least three User Client / MOH / MOW members

with the system and basic trouble shooting procedures and techniques.

19 MANUALS, SPARES & SYSTEM SOFTWARE

Three full sets of all operating and maintenance manuals, system layouts, wiring and interconnect

ion drawings shall be provided both in hard copy and electronic format. Drawings are to be

delivered i n DWG and DXF formats, AutoCAD 2000 or later releases together with a list of

recommended spares.

The contractor shall also provide one (I) set of recommended (in a suitable container) as specified

by the supplier/manufacturer of the Two-Way VHF Radio Communication system.

The contractor shall supply these items prior to Project Practical Completion

20 Training & Handover (O&M) Documentation:

20.1 Training:

The appointed contractor shall train a number of representatives of the client in the operation of the

relevant system installed by the contractor. The training should cover the following aspects of the

system.

Description of the system architecture configuration of any GUI's and operation of any controls at the

displays Configuration of any databases Monitoring and acknowledging of any alarms Creating,

configuring and generating trend/other reports Creating and configuring any time schedules Manually

controlling any field points (if relevant) Any first-line maintenance procedures required for the

hardware The contractor should provide separate printed and electronic copies of Operator's

handbooks and training materials for all attendees.

20.2 O&M Manuals:

The contractor shall provide a complete set of Operation and Maintenance manuals for this project.

The documentation shall include (if applicable to the system installed):

Updated design specification including listings and descriptions of any application programs

As-builts: site plans and floor plans showing labelled locations of hardware and network equipment,

controllers, sensors and routes for cabling and cable containment (The engineers may assist with the

“Cadding” process). Schematic diagrams of the system including logical device locations and

networking addressing.

Itemised list of equipment installed indicating make, model, serial number, size and range of

operation A datasheet for each item of equipment in the system Configuration data detailing nay user

configurable parameters and a definition of what the configuration parameter affects Instructions for

installing software Instructions on report generating Instructions on using real time display

Instructions on using alarm and event handlers Instructions on archiving any databases testing and

commissioning results Maintenance instructions for all software and hardware fault finding guide

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

detailing common issues and steps for rectification Documentation should be submitted electronically

on a CD.

20 MATERIAL DETAIL SPECIFICATIONS:

20.1 LV Reticulation Material Specification

ITEM DESCRIPTION SUPPLIER CODE/SPECIFICATION

1. Low Voltage Cables

1.1 PVCPVCSWAPVC SANS 1507 : 1990

Cables

1.2 SANS 1411 : part 1 - 1986

Earth continuity

conductors

connection cable

2. PVCPVCSWAPVC SANS 808

cable accessories Complete with lugs and cable shroud 3

2.1 Cable terminations m

Bimetallic

3.1 Meters kWh

3.1.1 Three phase 3 Phase, 230V 25/100A Actaris

complete with modem

3.2 Moulded case circuit

3.2.1 breaker CBI Type SF, 5 kA

3.2.2 5 - 100 A, SP and TP CBI Type JSO

125 - 500 A, TP

3.4 Heinemann, 2.5 kA

Moulded case circuit

breaker - secondary

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

21 AUTOMATIC STANDBY GENERATOR SET

21.1 General

The AMF set shall be rated 60kVA prime rating super silent canopy type package unit to be

installed on a slab outdoors.

The diesel engines shall comply with BS-5514 and shall be multi-cylinder, naturally aspirated or

turbo-charged, four-cycle, heavy duty, water- or air-cooled units, suitable for cold starting and

operating on commercial diesel fuel as available in Namibia.

The engines must be capable of producing sufficient power, at the altitude and ambient

temperature at which the engines must operate to continuously drive the alternators at their rated

full load outputs, or at a 10% overload for one hour in any consecutive twelve-hour period without

overheating.

The sets shall be able to, within 15 seconds, accept at least 80% of the specified generator full

load kVA output in one step as soon as the operating speed has been obtained. The engines

shall be capable of accepting full load at rated voltage within sixty seconds of start-up.

21.2 Speed

Engine speed shall not exceed 1500 r/min and the flywheel shall be such that the cyclic

irregularity meets the requirements of BS 649.

21.3 Fuel system

The fuel pumps shall be suitable to pump fuel that complies with SABS 342. Primary and

secondary filters with replaceable elements shall be fitted immediately before the fuel pumps.

The filters shall be fitted with pressure differential switches ahead of the fuel pumps which shall

energize a red alarm indicator light and screen on the generator control panel to indicate dirty filters

when the pressure differential rises above the factory recommended value. Water traps shall be

fitted upstream from the fuel filters.

21.4 Governor

The governors fitted to the engines shall control the speed to ± 4% of the specified speed or ± 2 Hz

on the frequency according to BS-2613.

When full load is disconnected/connected suddenly the temporary speed variation shall not exceed

15% of nominal value and the permanent speed variation not more than 5%.

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

The engines shall also be fitted with overspeed cut-outs to stop the engines should the speed rises to

10% above nominal speed. Manual adjustment of the nominal engine speed shall be possible via a

linkage with an adjusting knob and locknut.

21.5 Lubrication

The engines shall have a pressure feed lubrication system which shall deliver oil to all components of

the engine via full flow filters with replaceable elements, oil strainers, oil coolers and pressure relief

valves. The oil pumps shall be of the positive displacement type.

Low oil pressure switches shall activate fuel cut off solenoids when the oil pressure drops below the

manufacturer's minimum operating pressure and activates a red indicator light on the generator

panel.

21.6 Cooling

The engines shall be water cooled. Water cooled engines must be pressurized with water circulated

through the engines and radiators by centrifugal pumps. The pumps shall be of belt, gear or

electrical motor driven pype. The radiators shall be heaving duty, cross or vertical flow type and of

adequate size to ensure adequate cooling to meet designed power output.

Cooling air shall be forced through the radiators by pusher-type fans, the capacity of the fans being

sufficient to displace an adequate volume of air through the radiators against the extra resistance of

the cooling air ducting between the radiators and the louvered openings in the wall of the generator

room, to maintain the water within the required temperature range for adequate cooling of the

engines. The fans shall be covered with suitable shrouds or cowls which shall be securely bolted to

the radiators to prevent injury to maintenance personnel.

The engines shall be fitted with over-heating protection systems to shut down the engines in case of

overheating of the cooling water, fan belts or fan failure and shall have low water level cut-outs in the

radiator top tanks.

The flow of water through the cooling system shall be controlled by thermostats. The thermostats

shall control the flow of water to ensure rapid heating of the water to a temperature suitable for the

design operating conditions of the engines.

Air cooled engines shall have a suitable blower capable of displacing an adequate volume of air to

maintain the engine within the designed operating temperature range. The blower shall be

adequately shielded to prevent injury to maintenance personnel. The capacity of the blower shall be

sufficient to allow for the extra resistance of the cooling air ducting between the engine and the

louvered openings in the generator room walls.

21.7 Starting

DC starter motors shall be fitted with starters engaging on toothed gears on the engine flywheel.

Provision shall be made to prevent the starter from engaging before the engine has come to a

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

standstill in case of unsuccessful starting attempts.

The engine shall be able to start up during summer and winter conditions without any special ignition

devices.

The generator control panel shall be equipped with a three start attempt device which shall allow up

to three consecutive starting attempts, then preventing further starting attempts and activate a red

indicator light, labelled start failure, on the control panel.

21.8 Battery charging

The engines shall not be fitted with battery charging alternator. Batteries shall be charged via mains

solid state trickle chargers. The Trickle chargers shall be fitted in the control panels and shall form

part of this contract.

21.9 Air Cleaners

The engines shall be fitted with Donaldson type, heavy duty, dry element two, stage air cleaners. The

air cleaners shall be complete with indicators to indicate the air cleaner element condition.

21.10 Instruments

All instruments shall be clearly marked with the normal operating range. The following instruments

shall be fitted in the generator control panel.

i) Oil temperature ΕC

ii) Oil pressure kPA

iii) Cooling water temp ΕC

iv) A hour meter with five-digit display

i) Engine tachometer calibrated in r/min

vi) Centre zero Ammeter, Battery charging

vii) Battery Voltmeter

viii) Exhaust temperature ΕC

21.11 Generator

The generator shall be rated 400V, three phase and be able to supply 55kVA prime at elevation in

Windhoek at an ambient temperature of 30˚C. The generator shall be capable of sustaining a 10%

overload at rated voltage for one hour in any consecutive twelve-hour period in accordance with to

BS 649.

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

The generators shall be drip proof, fan ventilated, brushless and screen protected and constructed

in accordance with BS-2613. Insulation shall be Class E.

The generators shall be self-exciting and be able to control the output voltage within ± 2,5%

between full load and no-load at PF of 0,8 lagging to unity, including speed variation of ± 4% from

rated speed.

The generator shall be able to generate the specified output at the specified altitude and

temperature at 0,8 power factor and at rated speed.

An automatic voltage regulator with manual operated trimmer shall be installed in the generator

control panel.

When full load is applied, the voltage shall recover to ± 2,5% of rated voltage within 300msec. and

the transient voltage dip shall not exceed 15% of rated voltage.

The generator shall be able to handle an overload 2,5 times the rated output for at least 10

seconds at close to zero power factor.

The generator shall be adequately suppressed against radio and television interferences.

21.12 Coupling

The generator-engine coupling shall be suitably protected to prevent injury of maintenance staff.

21.13 Mounting

The Generator and engine shall be mounted on a common rigid I-beam frame. Anti-vibration

mountings shall be used to mount the engine and alternator to the mounting frame.

The frame shall have factory made holding-down bolt holes.

21.14 Battery

The battery shall be maintenance free type located next to the generator.

The battery banks. shall either be 12V or 24V with sufficient capacity for six consecutive non-start

start-ups, each 20 sec long at the startup speed of the engines. The battery is to be kept charged

by solid state chargers that automatically adjust the rate of charge.

21.15 Exhaust system

The total installation shall operate with minimum noise and vibration. The installation shall meet

the requirements of SABS 083, and the noise shall not exceed NC 50, 3 metres from the building.

As this project is in a noise-sensitive eco-environment, the generator sets must both be sound

attenuated and operate at between 69 and 73 dBA at full load at 7 metres.

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

The engine shall be fitted with a domestic or hospital type low noise silencer.

The exhaust pipe shall be so designed that rainwater, or birds cannot enter the system.

21.16 Storage of fuel

The generator shall have an in-built fuel tank allowing a minimum of 16 hrs continuous operation.

All pipework, filters etc shall be standard.

In addition, a 2000 litre outdoor diesel tank is to be supplied and installed complete with all piping to

the generators, tank shall be installed as to allow natural flow of diesel to the generator without the

need of pumps.

21.17 Generator Control Panel

These panels shall be sheet steel wall mounted boards with IP55 protection.

The control panel shall provide the following control functions:

1) An automatic mains failure control panel shall be provided to start the Generator

automatically on a Mains failure and adjustable load transfer time of 1 min to 15 min and

engine shut down after load transfer delay time.

Change over contactors shall be mechanically and electrically interlocked.

2) Three starts attempt before lock-out.

3) Urgent alarms shall be blocked off during starting

4) Generator running shall be indicated when generator voltage is more than 30% of rated

voltage or if applicable when the tachometer generates the run signal required. A potential

free contact shall also be prewired for telemetry signals.

5) Auto-off-test selector switch.

6) Emergency stop push button with key operated release.

7) Battery charger.

The following engine protection shall be provided for each generator set.

1) Low oil pressure, engine shut down, alarm.

2) Low water level in radiator, engine shut-down, alarm.

3) High water temperature, engine shut-down, alarm.

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

4) Dirty fuel filters or blocked filters, alarm.

5) Over/under speed engine shut-down, alarm.

6) Fan belt drive failure, alarm.

7) Day tank level low (10% - engine shut-down, alarm).

8) Low battery voltage, alarm.

A red indicator light shall be provided for each fault as well as a common alarm potential free

contact prewired for telemetry signals.

The following instruments shall also be mounted on the generator control panel.

All instruments shall be 72 mm square.

1 x Voltmeter - 0 - 500V plus seven position selector switches

3 x Ammeters - Maximum demand instantaneous - CT operated

1 x Frequency meter, Reed type

1 x Hour counter per engine

1 x Circuit breaker rated for Generator size

1 x Isolator rated for Mains supply cable

1 x Set of automatic change-over contactors, electrically and mechanically interlocked.

21.18 Electrical

All control wiring shall be carried out using 1,5mm² PVC insulated conductors. A set of outgoing

terminals shall be provided in each panel associated with the generator set. All cables shall enter

each panel from the button. The generator supply cables shall be rated to match the maximum

output of the alternator.

The generator installation shall be earthed in accordance with the SABS 0142 as necessary.

The earth continuity conductors shall be suitably crimped to lugs before being secured using brass

bolts and nuts. The generator control panel earth bar shall be connected to the following: -

i) The generator neutral

ii) The generator mounting frame

iii) All non-current carrying metal parts

iv) The Main DB earth bar.

All earth continuity conductors will be of stranded copper conductors. Aluminium conductors are

not acceptable.

21.19 Sound attenuators

The diesel generator set shall be a super silent soundproofed machine of the weatherproof canopy

type.

21.20 Commissioning and hand-over

The Tenderer is to allow in his tendered price for the training of the users staff members in the

operation and normal servicing of the generator sets.

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

Before hand-over, the tenderer shall carry out the following: -

ii) Once the successful tenderer has satisfied himself that the works are complete in every detail

as specified in the contract documents, he shall inform the Engineer in writing of a proposed

date for a first delivery inspection. The Engineer shall be given at least 7 days notice of such a

date.

The Engineer will confirm in writing the acceptability of such a date.

ii) All maintenance and operating manuals, drawings, spare fan belts, filters etc. shall be

handed over to the Engineer before the first delivery inspection takes place.

iii) At the inspection the successful tenderer shall carry out operational start-up/shut-down and

full load tests. All equipment required for the tests shall be provided by the successful

tenderer at his own expense. These tests shall be carried out at the tenderers premises

before delivery to site.

Any defect or items requiring attention will render the first delivery inspection invalid and the

tenderer will be required to rectify the defects or items before again arranging for a first

delivery inspection.

iv) The Engineer reserves the right to inspect any part of the works at any time during the

contract period.

vi) Final delivery inspection will be arranged on completion of the works on the same basis s a

for first delivery inspection. Final delivery will not be carried out before the last day of the

guarantee period. The completion certification will be issued to the tenderer only after the

satisfactory completion of the first and final delivery inspections.

22 TRAINING AND HANDOVER (O&M) DOCUMENTATION

22.1 Training.

The appointed contractor shall train a number of representatives of the client in the operation of

the relevant system installed by the contractor. The training should cover the following aspects of

the system.

Description of the system architecture configuration of any GUI’s and operation of any controls at

the displays configuration of any data bases monitoring and acknowledging of any alarms creating,

configuration and generating trend/other reports creating and configuration any field points (if

relevant) any first-time maintenance procedures required fro the hardware the contractor should

provide separate printed and electronic copies of Operator’s Handbooks and Training Materials for

all attendees.

22.2 Maintenance Manuals.

The appointed contractor shall provide a complete set of Operation and Maintenance manuals for

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

2.1

this project. The documentation shall include (if applicable to the system installed). Updated

design specification including listings and descriptions of any application programs.

As-builds: site plans and floor plans showing labelled locations of hardware and network

equipment, controllers, sensors and routes for cabling and cable containment (the engineers may

assist with the Cladding process. Schematic diagrams of the system including logical device

locations and networking addressing.

Itemised list of equipment installed indicating make, model, serial number, size and range of

operation A datasheet for each item of equipment in the system Configuration data detailing nay

user configurable parameters and a definition of what the configuration parameter affects

Instructions for installing software Instructions on report generating Instructions on using real time

display Instructions on using alarm and event handlers Instructions on archiving any databases

testing and commissioning results Maintenance instructions for all software and hardware fault

finding guide detailing common issues and steps for rectification Documentation should be

submitted electronically on a USB.

23 Signage:

Contractors shall make provision for the procurement and fixing of all mandatory notices. Signage

shall be provided in the areas as designated by the Engineers.

The following signage listing is intended as a guide:

• Water extinguisher prohibition signs,

• Notices prohibiting unauthorised persons from handling or interfering with equipment,

• Notices containing the procedure in case of fire,

• Directions for the resuscitation of persons suffering from the effects of electrical shock,

• Signage prohibiting unauthorised entrance in areas of operational MV equipment Single Line

diagrams or drawings,

24 Maintenance and Guarantee Period:

The entire installation shall be guaranteed for Twelve (12) months on all parts and workmanship.

Date of commencement of guarantee period shall start after the Practical completion date.

The installation shall be maintained for the same period of twelve months, and the cost of the

maintenance shall be included in the tendered price. The Contractor shall also allow for two

complete simulated fire drills carried out with the tenant staff at times to be fixed within the

guarantee period.

Both fire drills shall be organised and conducted by an experienced and competent instructor of the

Contractor’s staff.

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

3.1

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY

BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RENOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRICAL INSTALLATIONS

PART III: FORMS TO BE COMPLETED BY BIDDER

A INFORMATION ABOUT THE BIDDER

B AUTHORITY FOR SIGNATORY

C SCHEDULE OF WORK EXECUTED BY THE BIDDER

D SCHEDULE OF WORK TO BE SUB-LET

E AUTHORITY TO WORK ON LV (400V) INSTALLATIONS IN OSHAKATI

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid Documentation\Electrical\2518 -

Elec Tech.Spec.doc

3.1

A. INFORMATION ABOUT THE BIDDER

1. IF THE BIDDER IS A COMPANY

1.1 Directors of the Company

List the Directors of the Company, their nationality together with the date on which each Director has

been appointed:

Name of Director Date of Appointment Nationality

……………………… ……………………… ………………………

……………………… ……………………… ………………………

……………………… ……………………… ………………………

……………………… ……………………… ………………………

1.2 Shareholding

(a) List all the shareholders of the Company:

Full names Nationality

………………………………………………. ……………………

………………………………………………. ……………………

………………………………………………. …………...……….

………………………………………………. …………………….

(b) List of all companies of which the Company is a shareholder:

…………………………………………………………………………………………………………….

…………………………………………………………………………………………………………….

…………………………………………………………………………………………………………….

…………………………………………………………………………………………………………….

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid Documentation\Electrical\2518 -

Elec Tech.Spec.doc

3.1

2. IF THE BIDDER IS CLOSED CORPORATION

List the members of the Closed Corporation, their nationality including, their date of appointment as well

as their percentage interest in the C.C.

Name of Member Date of Appointment % Interest in C.C. Nationality

……………………… ……………………… …………… ………………………

……………………… ……………………… …………… ………………………

……………………… ……………………… …………… ………………………

3. IF THE BIDDER IS A PARTNERSHIP

List the partners in the Partnership, the date of accession as well as each one's profit/loss distribution

ratio.

Name of Partner Date of Accession Profit/loss Nationality

Distribution

Ratio

…………………………… ……………………… ……………… ………………………

…………………………… ……………………… ……………………. ………………………

…………………………… ……………………… ……………………. ………………………

…………………………… ……………………… ……………………. ………………………

4. IF THE BIDDER IS AN INDIVIDUAL

Supply the full names, and I.D. number of the Bidder:

Full names I.D. Number Nationality

……………………………… ………………………. ………………………

………………………………… ………………………. ………………………

………………………………… ………………………. ………………………

SIGNED ON BEHALF OF BIDDER: ..................................................

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid Documentation\Electrical\2518 -

Elec Tech.Spec.doc

3.1

B. AUTHORITY FOR SIGNATORY

Signatories for Companies, Partnerships or Closed Corporations must establish their authority by

attaching a copy of the relevant resolution of their Board of Directors, Members or Partners duly signed

and dated. An example is shown below for a Company:

By resolution of the Board of Directors at a meeting on ...........................................................

........................................................................................................................................ 2026.

at ..............................................................................................................................................

Mr..............................................................................................................................................

whose signature appears below, has been duly authorized to sign all documents in connection with this

Bid Reference No. ....................................................................................................................

on behalf of (block capitals) ................................................................................................. .

SIGNED ON BEHALF OF COMPANY: .............................................................

IN HIS CAPACITY AS: .............................................................

DATE: .............................................................

SIGNATURE OF SIGNATORY:…...............................................................

WITNESSES: 1. .......................................................................

2. .......................................................................

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid Documentation\Electrical\2518 -

Elec Tech.Spec.doc

3.1

C. SCHEDULE OF WORK EXECUTED BY THE BIDDER

1. COMPLETED CONTRACTS

The Bidder must insert in the spaces provided below a list of work completed by him during the past five

(5) years. Only work of a similar nature to this Contract must be listed.

CONSULTING NATURE

EMPLOYER ENGINEER OF YEAR

NAME AND TEL. WORK COMPLETED

2. CURRENT CONTRACTS

The Bidder must insert in the spaces provided below, a list of work at present under construction by his

firm.

CONSULTING VALUE EXPECTED

EMPLOYER ENGINEER NATURE OF OF COMPLETION

NAME AND TEL. WORK WORK DATE

SIGNED ON BEHALF OF BIDDER: ...........................................

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid Documentation\Electrical\2518 -

Elec Tech.Spec.doc

3.1

D. SCHEDULE OF WORK TO BE SUB-LET

The Bidder shall list below items of specialized work on this Contract which he intends to sub-let.

If the Bidder intends to carry out specialized work himself, he shall state this.

The acceptance of this Bid shall not be construed as approval of the work to be sub-let. Should any or

all of the Sub-contractors not be approved after acceptance of Quotation, this shall in no way invalidate

this Bid and the quoted rates and prices for the various items of work shall remain final and binding even

in the event of a Subcontractor not listed below, being approved by the Engineer.

ITEM DESCRIPTION OF WORK NAME OF SUBCONTRACTOR

SIGNED ON BEHALF OF BIDDER: ..........................................................

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid Documentation\Electrical\2518 -

Elec Tech.Spec.doc

3.1

E. AUTHORITY TO WORK ON MV (11 kV) & LV (400V) INSTALLATIONS IN WINDHOEK.

I herewith certify that I ...............................................................................................................................

representative of (bidder) ..........................................................................................................................

....................................................................................................................................................................

of (address) ................................................................................................................................................

....................................................................................................................................................................

....................................................................................................................................................................

telephone number ......................................................................................................................................

telex number .............................................................................................................................................

fax number .................................................................................................................................................

am authorised by City of Windhoek to carry out MV (11kV) and LV 400V installation works in Windhoek.

I further certify that I ascertained myself of all local conditions which may affect the work or the cost thereof and

that I am satisfied with the description of the works and that I fully understood the work included in the contract

as specified or implied.

A copy of the licence is attached. ……………………………………………… Yes / No

SIGNED ON BEHALF OF BIDDER: .....................................................................................................

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid Documentation\Electrical\2518 -

Elec Tech.Spec.doc

4.1

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY

BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RENOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRICAL INSTALLATIONS

PART IV: BILL OF QUANTITIES

The quantities in these Bills of Quantities are not to be used for ordering materials.

The Bill of Quantities forms part of and must be read in conjunction with the specification, which contains

the full description of the work described in the Bills of Quantities, reference should be made to the

specification for the full meaning or description of work to be done and materials and equipment to be used

in this service.

The total bid price on the bid Form shall constitute the contract price of the successful bidder. Bidders are

advised to check their item extensions and total additions, as no claim for arithmetical errors will be

considered.

No alteration, erasure or addition is to be made in the text of the Bill of Quantities. Should any alteration or

erasure be made, it will not be recognized but the original wording of the Bills of Quantities will be adhered

to.

The priced Bill of Quantities of the successful bidder will be checked, and the Engineer reserves the right to

call for adjustments to any individual price and to rectify the discrepancy.

Variations in the scope and extent of the work included in the Bill shall be allowed to meet the Employer's

requirements and shall be measured and costed at rates entered in the Bill, where appropriate, and shall

form additions to or deduction from the total of the Bill.

Any items or variations for which rates have not been included in the Bill shall be agreed and priced as non-

scheduled items in accordance with the provisions of the contract.

The rules covering the extent and cost of the variation shall be those provided for in the form of conditions

of contract.

Unless a separate rate for the supply and for the installation of any item is specifically called for, the supply

and installation costs of any item shall be fully included in the unit price.

The description of each item shall, unless otherwise stated herein, be held to include making, conveying

and delivering, unloading, storing, unpacking, hoisting, setting, fitting and fixing in position, cutting and

waste, patterns, models and templates, plant, temporary works, return of packing’s, establishment charges,

profit and all other obligations arising out of the conditions of contract.

All fittings and accessories always include the connections thereto.

All measurements are net, unless otherwise stated, and tenders must allow in their rates of wastage.

The quantities and rates included for day work shall form part of the bid price, but bidders shall note that

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

4.1

this item must be regarded as provisional and will only be payable to the contractor if and when a written

order to this effect has been issued.

All provisional sums shall be expended as directed by the Engineer and any balance remaining shall be

deducted from the amount of the contract sum.

All taxes, duties both import and/or customs, and any other surcharges, surtaxes and charges shall be

included in all prices given in this priced Bill of Quantities.

VAT is to be added only in the price summary of the Bill of Quantities.

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid

Documentation\Electrical\2518 - Elec Tech.Spec.doc

4.1

4A SCHEDULE OF TECHNICAL DETAIL

The Tenderer shall complete the following schedule as part of his Tender submission.

ITEM DESCRIPTION MANUFACTURER

1 Distribution Boards

2 400V Switchgear

3 1000V PVC SWA PVC

4 Telephone Points

5 Socket outlets

6 Geyser outlets

7 TV outlets

8 Light switches

9 Light fittings type:

A

A1

B

C

D

E

F

S

Weatherproof Isolators

Power Skirting

Floor boxes

14 P-9000 Channel

15 Welded wire mesh cable tray

16 Heavy duty cable tray

UPS System

UPS Batteries

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid Documentation\Electrical\2518 -

Elec Tech.Spec.doc

4.1

Mini-Sub

19 11kV Switchgear

20 MV Cable

Generator

22 Change over

............................................................ .................................................

SIGNATURE OF BIDDER DATE

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid Documentation\Electrical\2518 -

Elec Tech.Spec.doc

4.1

PART IIV: SCHEDULE OF RATES FOR VARIATIONS

4.1 GENERAL

4.1.1 The rates entered in this schedule shall serve unaltered to calculate the value of variation orders

(additions or omissions) issued in terms of the Contract.

4.1.2 The rates entered shall exclude the Main/Principal Contractor's discount.

4.1.3 These rates shall include the following items necessary for the supply, delivery, handling and installation

of all applicable equipment:

Nett cost of material.

  • Profit, storing cost, handling charges, etc. for material.
  • Nett costs of labour.
  • Labour overheads and profit on labour.
  • General sales tax and any other duties payable.
  • Attributable overhead costs.

4.1.4 As the rates entered will only be used to calculate the value of variations, the Bidder shall complete

only list those rates of items to be used under this contract.

4.2 PROFIT ON MATERIAL FOR OMISSION AND ADDITIONS: (%)

The following percentage profit will be required on all materials for additions or omissions not covered by

any other section of this schedule. This percentage shall include all direct overheads, handling charges,

etc.

Nett percentage: ----------%

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid Documentation\Electrical\2518 -

Elec Tech.Spec.doc

4.1

4.3 RATES FOR ADDITIONAL LABOUR: (N$/h)

These rates shall be applied to determine labour costs not covered by any of the other sections of this

schedule.

Supervisor/ Qualified Appren- Conduit Labourer

Foremen artisan tice installer

Normal

rate ----------- --------- ---------- ---------

Overtime

(week) ----------- --------- ---------- ---------

Saturday

time ----------- --------- ---------- ---------

Sunday

time ----------- --------- ---------- ---------

4.4 RATES FOR TRANSPORT : (N$/km)

Rates shall include the cost of a licensed driver fuel, oil, maintenance, etc.

Vehicle capacity Rate per kilometer

Up TO 1500 kg ------------------

1600 to 3000 kg ------------------

3100 to 7000 kg ------------------

SIGNATURE OF BIDDER : ____________________ DATE: ____________

NAME OF BIDDER : _______________________________________

ADDRESS : _______________________________________

: _______________________________________

: _______________________________________

TELEPHONE NUMBER : _______________________________________

FACSIMILE NUMBER : _______________________________________

\\dnqshost\ProjectData\2025 Projects\2025-04 - BIPA Revised concept\February 2026\BIPA - M&E Bid Documentation\Electrical\2518 -

Elec Tech.Spec.doc

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY (BIPA)

PROCUREMENT REFERENCE NO:

PROPOSED NEW BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY(BIPA): ELECTRICAL INSTALLATIONS

ITEM DESCRIPTION UNIT QTY LABOUR MATERIAL TOTAL AMOUNT N$

RATE RATE RATE

Tenderers shall allow for the following

items whatever cost they may consider

necessary for carrying out and

observance of the item:

1.1 Transport Sum 1

1.2 Site Establishment (stores etc) Sum 1

1.3 Setting Out Sum 1

1.4 Progress Meetings Sum 1

1.5 Attendance for measurement Sum 1

1.6 Site Supervision Sum 1

1.7 Insurance, Warranties Sum 1

1.8 Telephone, stationery etc. Sum 1

1.9 Tests and inspection prior to completion. Sum 1

1.10 Any other items necessary to complete Sum 1

the building electrical installations

1.11 Allow for co-ordination with the Hospital Sum 1

management

TOTAL CARRIED FORWARD TO SUMMARY

2518 - Electrical Bill

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY (BIPA)

PROCUREMENT REFERENCE NO:

PROPOSED NEW BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY(BIPA): ELECTRICAL INSTALLATIONS

Sect. 2 : Civil Work

ITEM DESCRIPTION UNIT QTY LABOUR MATERIAL TOTAL AMOUNT N$

RATE RATE RATE

CIVIL WORK

2.1 Electrical Work

i) Trench in hard pickable material for m 60

Area lights underground cables, complete

with warning tape, backfill and

compaction.

.

ii) 50mm diameter PVC sleeves for cable m 5

entry installed complete including draw-

wires.

iii) 50mm diameter PVC long radius bends No 9

for cable entry to DB's.

iv) 32mm diameter PVC sleeves for cable m 30

entry installed complete including draw-

wires.

v) 32mm diameter PVC long radius bends No 6

for cable entry to DB's.

TOTAL CARRIED FORWARD TO SUMMARY

2518 - Electrical Bill

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY (BIPA)

PROCUREMENT REFERENCE NO:

PROPOSED NEW BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY(BIPA): ELECTRICAL INSTALLATIONS

Sec. 3: 1000V Cable Reticulation

ITEM DESCRIPTION UNIT QTY LABOUR MATERIAL TOTAL AMOUNT N$

RATE RATE RATE

1000V Cable Reticulation

3.1 Supply and delivery and installation of

1000V PVC SWA PVC cables (copper)

i) 35mm² x 4C (SPLIT BOX) m 35

ii) 25mm² x 4C (MDB) m 15

iii) 16mm² x 2C (DB-1) m 40

iv) 10mm² x 2C (GDB) m 15

v) 6mm² x 2C (UPS) m 10

3.2 Supply and delivery and installation of

bare copper earth wire.

i) 25mm² m 35

ii) 16mm² m 15

iii) 10mm² m 40

iv) 6mm² m 25

3.3 Supply and delivery and installation of

termination units including mechanical

clamps, lug, corrotion, proof bolts, nuts

washer etc. to terminate the following

cables:-

i) 35mm² x 4C No 2

ii) 25mm² x 4C No 2

iii) 16mm² x 2C No 2

iv) 10mm² x 2C No 2

v) 6mm² x 2C No 2

vi) 25mm² BCEW No 2

vii) 10mm² BCEW No 2

viii) 6mm² BCEW No 4

3.4 Supply and installation of Split Box as

follows:

i) Ground mounted enclosure with 20% No 1

spare space

ii) 100A TP MCB No 1

iii) 80A TP MCB (MDB) No 1

iv) 60A DP MCB(DB-1) No 1

TOTAL CARRIED FORWARD TO SUMMARY

2518 - Electrical Bill

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY (BIPA)

PROCUREMENT REFERENCE NO:

PROPOSED NEW BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY(BIPA): ELECTRICAL INSTALLATIONS

Sect 4 : Existing Building Electrics

ITEM DESCRIPTION UNIT QTY LABOUR MATERIAL TOTAL AMOUNT N$

RATE RATE RATE

Existing Building Electrics

4.1 Supply and installation of DBs as follows:

(a) Main-DB

i) Surface in duct mounted enclosure with No 1

20% spare space

ii) 80A TP MCB, 6kA No 1

iii) 32A DP MCB, 6kA (GDB) No 12

iv) 30A DP MCB, 6kA No 12

v) 43A TP E/L isolator, 6kA No 3

vi) 20A DP MCB, 6kA No 9

vii) 16A SP MCB, 6kA No 4

viii) 6A No 1

ix) Surge Arrestors No 4

(b) UPS-DB

i)Surface in duct mounted enclosure with No 1

20% spare space

ii) 20A SP MCB, 6kA No 5

vi) Surge arrestors No 2

4.2 Supply and installation of light fitting as

follows:

i) Type A No 20

ii) Type A1 No 15

iii) Type B No 20

iv) Type C No 5

v) Type D No 3

vi) Type E No 11

vii) Type F No 11

vii) Type S No 26

TOTAL CARRIED FORWARD

2518 - Electrical Bill

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY (BIPA)

PROCUREMENT REFERENCE NO:

PROPOSED NEW BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY(BIPA): ELECTRICAL INSTALLATIONS

ITEM DESCRIPTION UNIT QTY LABOUR MATERIAL TOTAL AMOUNT N$

RATE RATE RATE

BROUGHT FORWARD

4.3 Supply and installation of light points No. 111

complete with 2.5mm wiring, conduits, etc

4.4 Supply and installation of UPS Isolator No. 2

point complete with 6mm wiring, etc

4.5 Supply and installation of light switches:

i) One way: 1 lever No 10

2 lever No 7

i) Two way: 1 lever No 5

2 lever No 5

iii) Daylight switch No 1

4.6 Supply and installation of earth rods plus No 4

35mm² conductor from earth to Roof

structure via 25mm Ø conduit and 100 x

100 flush inspection box.

4.7 Supply and installation of telephone / data

outlets include RJ-45 sockets

i) in trunking No 35

4.8 16 Amp socket outlets including 4mm²

wiring, conduit etc.

i) 16A SSO - in trunking No 25

ii) 16 A UPS SSO - in trunking No 25

iii) 16A combination SSO (1x3pin plug, No 15

1x2 pin round plug & 2x2USB) - flush

iv) TV POINT including sleeves to No 2

television satelite dish

4. 9 Supply and installation of isolators as

follows:

i) 6A DP isolator for fans No 1

ii) 20A DP isolator complete including No 1

4mm² conductors and 4mm² BCEW for

geyser

4. 9 Supply and installation of isolators as

follows:

i) 6A DP isolator for fans No 6

ii) 20A DP isolator complete including No 2

4mm² conductors and 4mm² BCEW for

geyser

iii) 30A DP isolator complete including No 7

6mm² conductors and 4mm² BCEW for

geyser

TOTAL CARRIED FORWARD

2518- Electrical Bill

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY (BIPA)

PROCUREMENT REFERENCE NO:

PROPOSED NEW BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY(BIPA): ELECTRICAL INSTALLATIONS

ITEM DESCRIPTION UNIT QTY LABOUR MATERIAL TOTAL AMOUNT N$

RATE RATE RATE

BROUGHT FORWARD

iv) 20A DP isolator complete including No 2

4mm² conductors and 4mm² BCEW for

Hand Dryers

4. 10 Supply and installation of 2 compartment

trunking as follows:

i) straight lengths No 75

ii) end-caps No 14

iii) internal 90° bends No 16

4.11 Supply and installation of P9000 cable m 40

managemnet channel including rods and

fixing brackets

TOTAL CARRIED FORWARD TO SUMMARY

2518- Electrical Bill

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY (BIPA)

PROCUREMENT REFERENCE NO:

PROPOSED NEW BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY(BIPA): ELECTRICAL INSTALLATIONS

Sect 5 : New Building Electrics

ITEM DESCRIPTION UNIT QTY LABOUR MATERIAL TOTAL AMOUNT N$

RATE RATE RATE

New Building Electrics

5.1 Supply and installation of DBs as follows:

(a) DB-1

i) Surface in duct mounted enclosure with No 1

20% spare space

ii) 60A DP MCB, 6kA No 1

iii) 30A DP MCB, 6kA No 8

iii) 43A TP E/L isolator, 6kA No 3

iv) 20A DP MCB, 6kA No 2

v) 20A SP MCB, 6kA No 10

vi) 16A SP MCB, 6kA No 3

vii) 6A No 1

viii) Surge Arrestors No 4

ix) Supply and installation of a Prepaid No 1

Meter

5.2 Supply and installation of light fitting as

follows:

i) Type A No 16

ii) Type A1 No 6

iii) Type B No 11

iv) Type C No 2

vii) Type F No 15

vii) Type S No 5

5.3 Supply and installation of light points No. 55

complete with 2.5mm wiring, conduits, etc

Supply and installation of light switches:

i) One way: 1 lever No 9

2 lever No 2

i) Two way: 1 lever No 2

2 lever No 3

TOTAL CARRIED FORWARD

2518- Electrical Bill

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY (BIPA)

PROCUREMENT REFERENCE NO:

PROPOSED NEW BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY(BIPA): ELECTRICAL INSTALLATIONS

ITEM DESCRIPTION UNIT QTY LABOUR MATERIAL TOTAL AMOUNT N$

RATE RATE RATE

BROUGHT FORWARD

iii) Daylight switch No 2

v) Intermediate switch No 2

5.4 Supply and installation of earth rods plus No 2

35mm² conductor from earth to Roof

structure via 25mm Ø conduit and 100 x

100 flush inspection box.

5.5 Supply and installation of telephone / data

outlets include RJ-45 sockets

i) in trunking No 10

16 Amp socket outlets including 4mm²

wiring, conduit etc.

i) 16A SSO - in trunking No 10

ii) 16 A UPS SSO - in trunking No 10

iii) 16A combination SSO (1x3pin plug, No 25

1x2 pin round plug & 2x2USB) - flush

5.6 iv) TV POINT including sleeves to No 1

television satelite dish

5.7 Supply and installation of isolators as

follows:

i) 6A DP isolator for fans No 2

ii) 20A DP isolator complete including No 1

4mm² conductors and 4mm² BCEW for

geyser

iii) 30A DP isolator complete including No 7

4mm² conductors and 4mm² BCEW for

Aircon

iv) 20A DP isolator complete including No 2

4mm² conductors and 4mm² BCEW for

Hand Dryers

5.8 Supply and installation of 2 compartment

trunking as follows:

i) straight lengths No 40

ii) end-caps No 10

iii) internal 90° bends No 5

TOTAL CARRIED FORWARD

2518- Electrical Bill

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY (BIPA)

PROCUREMENT REFERENCE NO:

PROPOSED NEW BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY(BIPA): ELECTRICAL INSTALLATIONS

ITEM DESCRIPTION UNIT QTY LABOUR MATERIAL TOTAL AMOUNT N$

RATE RATE RATE

BROUGHT FORWARD

5.90 Supply and installation of P9000 cable m 35

managemnet channel including rods and

fixing brackets

5.10 Supply and installation of floor box

complete including the following:

i) floor box enclosure No 2

ii) 16A SSO No 2

iii) 16A UPS SSO No 2

iv) Data poInt No 4

TOTAL CARRIED FORWARD TO SUMMARY

2518- Electrical Bill

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY (BIPA)

PROCUREMENT REFERENCE NO:

PROPOSED NEW BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY(BIPA): ELECTRICAL INSTALLATIONS

Sect 6 : Guard House Electrics

ITEM DESCRIPTION UNIT QTY LABOUR MATERIAL TOTAL AMOUNT N$

RATE RATE RATE

Guard House Electrics

6.1 Supply and installation of DBs as follows:

(a) GDB

i) Surface in duct mounted enclosure with No 1

20% spare space

ii) 32A dP E/L isolator, 6kA No 1

iii) 20A DP MCB, 6kA No 2

iii) 16A SP MCB, 6kA No 2

iv) 6A No 1

v) Surge Arrestors No 2

6.2 Supply and installation of light fitting as

follows:

i) Type A No 5

ii) Type F No 10

6.3 Supply and installation of light points No. 16

complete with 2.5mm wiring, conduits, etc

Supply and installation of light switches:

6.4

i) Two way: 1 lever No 2

ii) Daylight switch No 1

6.5 Supply and installation of earth rods plus No 1

35mm² conductor from earth to Roof

structure via 25mm Ø conduit and 100 x

100 flush inspection box.

6.6 Supply and installation of telephone / data

outlets include RJ-45 sockets

i) in trunking No 2

6.7 16 Amp socket outlets including 4mm²

wiring, conduit etc.

i) 16A SSO - in trunking No 5

ii) 16 A UPS SSO - in trunking No 2

iii) 16A combination SSO (1x3pin plug, No 2

1x2 pin round plug & 2x2USB) - flush

TOTAL CARRIED FORWARD

2518- Electrical Bill

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY (BIPA)

PROCUREMENT REFERENCE NO:

PROPOSED NEW BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY(BIPA): ELECTRICAL INSTALLATIONS

SECTION DESCRIPTION AMOUNT N$

BROUGHT FORWARD

6.8 Supply and installation of 2 compartment

trunking as follows:

i) straight lengths No 5

ii) end-caps No 2

TOTAL CARRIED FORWARD TO SUMMARY

2518- Electrical Bill

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY (BIPA)

PROCUREMENT REFERENCE NO:

PROPOSED NEW BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY(BIPA): ELECTRICAL INSTALLATIONS

Sect 7: Standby Generator and UPS

SECTION DESCRIPTION AMOUNT N$

STANDBY GENERATOR AND UPS

7.1 Supply and installation of canopy type No 1

outdoor low-noise automatic mains failiure

sets, 60kVA prime rating, with first filling of

fuel.

7.2 Supply and installation of 10kVA UPS No 1

system,complete with 30 minutes battery

back-up capacity

TOTAL CARRIED FORWARD TO SUMMARY

2518- Electrical Bill

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY (BIPA)

PROCUREMENT REFERENCE NO:

PROPOSED NEW BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY(BIPA): ELECTRICAL INSTALLATIONS

Sect 8: Maintenace

SECTION DESCRIPTION AMOUNT N$

MAINTENANCE

8.1 Cost required for the 12 month Sum 1

maintenance period including at least one

site visit every 3 months.

TOTAL CARRIED FORWARD TO SUMMARY

2518- Electrical Bill

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY (BIPA)

PROCUREMENT REFERENCE NO:

PROPOSED NEW BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY(BIPA): ELECTRICAL INSTALLATIONS

SUMMARY OF SECTIONS

SECTION DESCRIPTION AMOUNT N$

SECT 1 GENERAL

SECT 2 CIVIL WORK

SECT 3 1000V CABLE RETICULATION

SECT 4 EXISTING BUILDING ELECTRICS

SECT 5 NEW BUILDING ELECTRICS

SECT 6 GUARD HOUSE ELECTRICS

SECT 7 STANDBY GENERATOR AND UPS

SECT 8 MAINTENANCE

Sub-total

ADD 10% CONTINGENCIES

TOTAL ELECTRICAL BID AMOUNT

2518- Electrical Bill

TECHNICAL SPECIFICATION FOR CONSTRUCTION AND RENOVATION

OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK

PROJECT NO: P2518

SUPPLY, DELIVERY AND INSTALLATION OF THE ELECTRONIC

INSTALLATION WORKS

Architect – Principal Agent Civil/Structural Engineers

Marley Tjitjo Architects Denchi Consulting Engineers

Tel: (061) 220 604 PO Box 80352

PO Box 96088 Tel: (061) 228 183

WINDHOEK WINDHOEK

Quantity Surveyors Electrical/Mechanical Engineer

Dawid Nell Quantity Surveyors Denchi Consulting Engineers

Tel: (061) 244 779 Tel: (061) 228 183

PO Box 40113 PO Box 80352

WINDHOEK WINDHOEK

BIDDER’S NAME : ......................................................

BID AMOUNT : ......................................................

DATE :

......................................................

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

PART 2 – Employer’s Requirements

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

Section II - Employer’s Requirements

Section 1: General Technical Specification .......................................................................................... 2.2

Section 2: List of Electronics Drawings for the Execution of the Contract ........................................... 2.4

Section 3: Detailed Technical Requirements for the Execution of the Contract .................................. 2.8

Section 4: Schedule of Rates for Material .......................................................................................... 2.35

Section 5: Schedule of Quantitites ..................................................................................................... 2.48

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

SECTION I: GENERAL TECHNICAL SPECIFICATION

PART II: DETAILED TECHNICAL SPECIFICATION

1. SCOPE OF CONTRACT

This Contract covers in broad terms the supply, delivery, erection, commissioning, and

maintenance guarantee for 12 months of the electronics installations specified below:

Telephone and Data structured cabling for the existing building and new building.

Supply and installation including programming, configuration and commissioning of

access control and CCTV systems

Supply and installation of a TV screen/ smart board

All the Bidders shall provide authorization license by the manufacturer of the system

they are offering.

2. STANDARDS

All material and equipment supplied and/or installed under this contract shall be new

and as per the product specification in Part IV and shall comply with the requirements

laid down in the latest editions of the relevant SANS or BS and their amendments (if

any) and the requirements of this Specification.

The material specified is the preferred material. If alternative materials are offered,

they shall be specified in Schedule E for approval of the engineer. Rates entered in the

schedule of quantities shall be for the specified materials. Schedule E shall reflect the

saving. In event of items bearing the SANS mark being available in respect of the

materials and equipment required, only items bearing this mark will be acceptable. The

workmanship under this contract shall be of a high standard and to the satisfaction of

the Procurement Board.

3. RADIO AND TV INTERFERENCE

All equipment installed under this contract shall comply with the Government Notice

No. R.2246 and any other applicable rules and regulations in respect of radio and TV

interferences. Any equipment found producing interference after commissioning, shall

be suppressed or replaced to the satisfaction of the Procurement Board without any

additional cost.

The Electrician will make provision for conduits and wire ways. However, immediately

upon appointment, the contractor will be expected to check all conduits so installed

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

and satisfy themselves of the adequacy and correctness thereof. Any additional

requirements or change shall be immediately communicated in writing to the Engineer.

The Bidder shall allow in their bid price for all material, labour, supervision, transport,

escalation tests and all other items necessary to complete the contract in its entirety.

As this is a fixed price contract, it is expected that the successful Bidder will finalise all

details for immediate ordering of materials.

In the event where the supply and/or installation of any item, material or equipment

does not form part of this Contract, it will be specifically indicated as such in his

specification and/or the accompanying drawings.

4. VAT, IMPORT TAXES AND DUTIES

Bidders shall allow in their Bid for all VAT, Import Taxes and Duties, to be paid in respect

of all items of material, labour and equipment to be supplied in terms of this Contract

where relevant. The successful Bidder will be liable and responsible for paying all VAT,

Import Taxes and Duties.

5. REGULATIONS

The work shall be carried out strictly in accordance with and all material and equipment

supplied shall comply with the following laws and regulations where applicable.

a) The latest edition of the "Code of Practice for the Wiring of Premises", SABS 0142

(1993 as amended).

b) The "Electricity Supply By-Laws and Regulations" of the Supply Authority.

The Contractor will be responsible for serving all notices and paying all fees due in terms

of the above laws and regulations.

6. LOCAL SYSTEM AND OPERATING CONDITIONS

All materials and equipment supplied and/or installed under this Contract shall be

suitable for satisfactory operation and shall have prescribed characteristics under the

following conditions:

a) Ambient Operating Conditions

Altitude : 1 100 metres above sea level

Minimum ambient temperature : -5 Degrees Celsius

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

Maximum ambient temperature: +40 Degrees Celsius

Humidity: Up to saturation point

b) Electrical System Particulars

LT System

420V, 3 phase, 4 wire, 50Hz AC with earthed neutral

7. DRAWINGS AND INFORMATION TO BE SUBMITTED

Drawings and information to be submitted on completion of the Works:

i) Two sets of paper prints of all the drawings show all "as built" features of the

installation.

ii) One set of sepia prints for the drawings in (i) above.

iii) Three complete sets of operating and maintenance manuals containing all

drawings, test certificates, settings of equipment as commissioned, installation,

commissioning and maintenance details, operating instructions, as well as a

complete list of spare parts with reference numbers and technical description to

enable the client's technical personnel to maintain service and repair the

installation.

8. TEST CERTIFICATES AND TESTS

7.1 Where test certificates are required for individual pieces of equipment, these shall

be submitted to the Engineer for approval immediately on receipt of such

certificates.

7.2 Where witnessing tests are required by the Engineer, arrangements shall be

made by the Contractor for the Engineer to witness such tests.

9. BUILDER'S WORK

The Electrician shall be responsible for the making good of all builder's work connected

with conduits, outlet boxes, distribution boards, cable entry sleeves etc., i.e. Conduits

installed in chases shall be covered by a layer of coarse sand and cement and backfilling

around cable entry sleeves shall be compacted to 93% Mod AASHTO density.

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

SECTION II: LIST OF DRAWINGS FOR THE EXECUTION OF THE PROJECT

2. DRAWINGS

Drawing No. Title

2518-EL-01 Electronics Layout

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

SECTION III: DETAIL TECHNICAL REQUIREMENT FOR THE EXECUTION OF THE

CONTRACT

1. Telephone and Data Structured Cabling

This Section of the works covers in broad terms the supply, delivery, erection,

commissioning,

maintenance guarantee for 12 months of the structured (Telephone and data) cabling

installation as specified below.

The installations shall cover the following:

(a) Telecom and Data network cabling, Cat 6, patch panels and switches complete

with RJ45 Jacks, Network Switches, Patch Panels, cabinets Etc.

(b) Wi-Fi routers

Floor Telephone and Data Outlets Switch

Existing Building 38 1 x 48 Port Switch in Server

New Building 38 1 x 24 Port Switch wall mounted

2. STRUCTURED CABLING

2.1 Cables

All cables should be Molex Category 6 specification with a bandwidth of 250 MHz and a

maximum data rate of 10 Gbps.

Patch Cables:

Cables must meet the requirements of TIA/EIA-568-C.2, CAT 6 specifications. Gold

plated contacts must give an insertion / extraction life of 1000 cycles.

The cable must be Molex and feature four stranded pairs, 24 AWG stranded copper,

insulation and a PVC jacket (4 pair UTP).

The cables must have an attenuation of 40.5 dB per 100 meters at 250 MHz.

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

2.2 Permanent Connections:

All permanent connections are to be silver-plated 45° insulation displacement contacts.

2.3 Patch Panels:

Patch panels shall be 24-way or 48-way as specified in the Bills of Quantities CAT 6 RJ

patch panels suitable for 250 MHz. They shall utilize high performing km8 keystone jack.

They shall allow inexpensive cable management, full fixing kit and twin labelling

management.

The panels should meet the requirements of TIA/EIA-568-C.2, CAT 6 specifications.

Panels must be used for universal wiring, with labelling for T568-A or T568-B wiring.

Connectors should be RJ-45 female for straight through wiring.

Patch panels shall be type Molex.

2.4 RJ45 Jacks/Keystone – CAT 6

These should be suitable for CAT 6 solid and CAT 6 stranded data cable. Installers shall

use only purpose-made jack termination tools. All materials shall be type Molex or Krone.

They should be TIA/EIA-568-C.2, CAT 6 standard.

They must incorporate a locking latch to hold the jack housing firmly and have snap-in

installations feature.

Contacts should be phosphor bronze with tin plating (50µm gold plating over 100µm

nickel under plating.

Contact resistance should be maximum 20 mili ohms.

DC resistance should be 0.1 ohms maximum.

Current rating should be 1.5 amps and insulation resistance should be 500 mili ohms

minimum.

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

2.5 POE Cisco Switches

Bidders are to provide 24-port and 48-port POE Cisco Switches as indicated elsewhere.

The switches shall feature 24 or 48 10/100/1000 Ethernet ports shall be RJ-45

connectors.

The switches shall support wireless or voice over IP use and have maximum power of

15.4W to an Ethernet port.

The switches shall come complete with AC power adapters, rack-mounting kits complete

with sirens and all associated software / registration requirements.

2.6 Data Cabinets

The cabinets shall be of the size specified in the bills of quantities meeting the

specifications as follows:

(i) have an aluminium frame,

(ii) size as detailed in the Bills of Quantities,

(iii) fitted with four depth reducers,

(iv) fitted with blank floor plates,

(v) fitted with four high performance balls bearing low-noise fans at the top of the cabinet

to expel air,

(vi) fitted with tinted safety plexi-glass doors and lockable doors. Two keys with label

tags to be supplied.

2.7 LABELLING

All labelling shall be printed with permanent ink PVC labels. All printed labels should be

black on white with a font size of at least 8mm.

Labelling shall be as follows:

(i) Patch Panels:

A, B, C etc. from top to bottom of the cabinet. The label will be on the left side of

the patch panel.

(ii) Wall outlets – BAC01 where:

B : Floor on which the cabinet is located

A : Cabinet number

C : Patch panel number

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

01 : Port on patch panel

The cable will be labelled with the same number at the back of the patch panel

and at the back of the wall outlet not more than 5m from the termination.

(iii) Cabinets:

All cabinets shall be marked with a label with a unique number for that cabinet in

the building.

Font size shall be 12mm minimum.

The label will be in the center of the top of the cabinet on the steel frame.

The labels will be as follows: - Cabinet A/B where:

A – Floor on which the cabinet is located, e.g. G, first, etc.

B – Cabinet number, which will be 1, 2, 3 etc. for more than one cabinet per floor.

Keys shall be supplied with numbers and labels indicating the cabinet number.

2.8 ACCEPTANCE AND TEST PROCEDURE FOR CABLING

The contractor shall inspect, complete and present a certificate to the Engineer, certifying

that:

(i) The only products of one supplier as offered were utilized,

(ii) As-built drawings showing installed portions of all outlets,

(iii) Outlets and patch panels are correctly labelled,

(iv) That the installations are done in accordance with the manufacturer’s specifications,

(v) All points are tested and test results documented and a 5-year site warranty

obtained,

(vi) That all test equipment used is calibrated and that calibration certificates are

available and valid on request,

Prior to final acceptance, the following documentation shall be required:

a) Certificate certifying the aspects detailed in the acceptance are test procedure above,

b) Manufacturers quality inspection form,

c) Test results,

d) Warranty certificate,

e) As-built drawings,

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

2.9 SPLICE ENCLOSURES AND FIBRE TAILS FOR FIBRE OPTIC CABLES

All products shall be merged with the manufacturers’ name and product code.

Splice enclosures shall be 24-way 19’ rack mountable.

Mid-couplers installed shall be of the SC or SFF type. Polyper mid-couplers will not be

accepted.

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

Installation specifications:

Indoor backbone fiber optic cables shall have a minimum bend radius of 10 times the

cable outside diameter when under no load and 15 times the cables outside diameter

when being pulled.

a) Vertical optic fiber cables:

Where the rise of an option fiber cable exceeds 20m, use must be made of light

buffer cables. Cables strain relief is to be installed at each vertical rise and

thereafter at 1m intervals. Cable drums shall be supported with an axle on trestles.

No twisting cables will be allowed. The optic fiber cable shall be terminated in the

19’’ rack mountable 24-way fiber splicing termination tray on mid-couplers or be

spliced onto unjacketed pigtails connected to the mid-couplers. The splice tray shall

house sufficient splice organizers. All splices shall be protected by splice protectors.

All cores in a cable shall be terminated at both ends.

2.10 FIBRE OPTIC CABLE REQUIREMENTS

The fibre cable performance shall be multi-mode fibre graded 50/125.

Optic Properties shall be as follows.

(i) Attenuation at 850nm______________________________2,504 dB/km

(ii) Attenuation at 1300nm______________________________0,704 dB/km

(iii) Bandwidth at 850nm______________________________400 MHz.km

(iv) Bandwidth at 1300nm______________________________800 MHz.km

Geometric Properties shall be as follows:

Core diameter : 50 ± 2mm

Numerical aperture : 0,200 ± 0,015

Cladding diameter : 125 ± 2mm

Core / Cladding Non-Circularity : 3,0mm

Cladding non-circularity : 2%

Coating diameter : 245 ± 10mm

Coating concentricity : ˂15mm

Coating non-concentricity : ˂5mm

The optical fiber utilized shall be indoor type LAN cable as follows:

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

(i) PVC / LSZH outer sheath

(ii) Non-metallic strength number

(iii) Gel fitted loose tubes

(iv) Colour side fibers

All cables shall be marked with the manufacturer’s name, type of cable length and data of

manufactures at no more than 1 meter intervals.

2.11 FIBRE OPTIC LABELLING

a) Labelling of fiber optic cables shall be by a carrier strip on method.

The cable shall be marked at each end of the cable as close as possible to a termination

point. Identification will be typically 4FO/1A: 2B where:

• 4FO = the fiber count

• 1A = the cabinet from

• 2B = the cabinet to

b) Fiber splice trays shall be labelled as follows: A, B, C etc. from the top of the cabinet.

The label will be on the left side of the Patch Panel.

c) The mid-couplers will be labelled as follows: G/A/B/1-4 were

i) G - floor

ii) A - cabinet number

iii) B - fiber optic patch panel number

iv) 1-4 – mid-coupler numbers

All labelling shall be printed with permanent ink PVC labels, black on white, with a

minimum font size of 8mm.

2.12 ACCEPTANCE AND TEST PROCEDURE

On completion of a fiber link an acceptance test, (light bounce / power meter shall be

performed from both ends. The readings shall be recorded and the bi-directional event

and average link loss calculated.

Test results shall be stored in hard and soft copies,

Maximum connector mated pair loss shall not exceed 0,75db

Maximum connections loss shall not exceed 0,5db

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

Maximum splice loss shall not exceed 0,3db

Prior to handover, the contractor shall complete an inspection certificate and certify that:

a) The installed products are approved by the engineer and that a certificate of approval

and delivery notes for the installed items are available on request

b) The splice trays are installed in the correct positions in the cabinet.

c) The splice trays are labelled correctly

d) Fiber cables are labelled correctly

e) All relevant documentation is complete and correct (test results, wiring schedule and

inspection certificate)

3. Access Control

3.1 General

The access control system shall run off one central management system, with the

software enabling system operators to configure, monitor and control the entire access

control system. The hardware and system components shall include the following:

i) Server for the operating system. This will be in the server room.

ii) Workstation to be in an office to be identified later. The default location will be

the server room.

iii) Controllers to manage the field devices.

iv) Proximity cards complete with Biometric reader and card encoder.

v) Door hardware including bolt-action locks, complete with power suppliers and

batteries, door loops and door closers.

vi) All software and licences.

vii) Training for at least five staff members over a period of at least 3 days.

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

3.2 Access Control to Doors

3.2.1 General: Doors to be controlled are as follows:

A total of 8 doors are to be controlled. The doors shall be controlled by controllers that

interface between the server, the door maglock, access finger print/card reader and the

door controller.

3.2.2 Controller:

The controller shall communicate with the server using TCP/IP internet transmission

protocol. The controller shall be able to support up to 500 events and 1000 cards for

access control purposes.

The controller shall allow peer-to-peer communication for remote monitoring, back–up

and control. The controller shall offer dial-up ability for off-site remote monitoring.

Controllers shall be type Gallagher 6000 or equal. Controllers shall come complete with

purpose made lockable cabinets. The cabinet shall be manufactured of steel and be able

to house the controllers, 8 Amp power supply and four (4) 7Ah batteries. The cabinet

shall come complete with mounting plate. Controllers shall control a maximum of eight (8)

doors each.

3.2.3 Electronic Door Locks:

a) Locks shall be fail-safe type, releasing upon loss of power or fire alarm activation.

b) Minimum holding force: 300 kg per lock.

c) Locks shall include door position monitoring contacts for integration with the

management system.

d) Installation shall comply with local fire codes and emergency egress requirements

4. CCTV System Installations:

4.1 General

The new IP Based CCTV Surveillance System shall be a state-of-the-art CCTV Video

Surveillance system. The system shall be an IP network based fully distributed digital video

system. The system shall provide full selection capability from the workstation at any point

within the network of the system.

The CCTV system shall provide unlimited expansion capability for the addition or

modification of video inputs. The system shall adhere to widely used CCTV standards and

shall be compatible with components from various manufacturers. A proprietary system,

which does not interface with components from 3rd party manufacturers (Cameras,

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

Recording Hardware, Recording Software, Security Management software, DVR, NVR),

complying with accepted standards, shall not be considered for this installation.

Equipment shall be selected and installed so that repairs may be accomplished on site by

module replacement, utilizing spare components whenever possible.

All cameras mounted within and on the building will be linked to and powered by a star-

topology distributed network of POE switches & Network Video Recorders (NVR’s) installed

in the building.

4.2 CCTV Cameras are to be installed as follows:

a) Indoors : 15 indoor dome cameras

b) Outdoors : 15 outdoor bullet cameras at entrances and Exits

c) Server room : 2 indoor dome cameras

The Network Video Management Software (NVMS), Network Video Recorder (NVR)

Hardware, Network Surveillance Cameras and related components shall be installed and

commissioned by authorized integrators trained and certified by the manufacturer. Proof

of certification shall be included in the tender.

4.3 Network Video Recorders (NVR)

The NVR is to be utilized to process and store video data from all the IP-based video

cameras (specified elsewhere in this document) and is to be supplied and installed

complete with a single processor and an effective 30 days of recording capacity.

4.4 The Network Video Recorder (NVR) shall:

• Have a 2U rack-mount chassis.

• Be scalable to operate seamlessly in an environment with multiple NVRs, as a

single solution.

• Record up to 32 MB/s of image data from up to 128 camera channels running at 30

images per second per channel.

• Have enterprise-class reliability with a minimum RAID-10 hard drive configuration,

and the hall have a redundant power supply.

• Have hard drives and power supplies which shall be hot-swappable for online

maintenance and repairs.

• Have a minimum of 2 x 1Gbps Ethernet ports.

• Operating System Microsoft Windows 10 x64 Pro or Windows Server O/S or equal

and approved.

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

4.5 Network Video Management Software (NVMS)

• The Network Video Management Software (NVMS) shall:

• Be a secure distributed-network platform with enterprise class reliability for

capturing, managing, and storing high-definition multi-megapixel surveillance video

while efficiently managing bandwidth and storage for megapixel cameras.

• Have the capability to manage both audio and video from a broad range of multi-

megapixel IP cameras. In addition, the system must have the capability to

accommodate conventional and PTZ analogue cameras and both audio and video

from a broad range of third-party IP cameras, and encoders from other reputable

manufacturers.

• As it may be a requirement, integrate the NVMS into third party Access Control,

Fire Detection and Intercom Control systems.

• CAT6 Ethernet cabling shall be used as standard to connect all CCTV cameras to

switches.

• There shall be fibre uplinks between all switches and the core VMS cabinet.

• The viewing stations and network video recorders shall have CAT7 uplinks

between them and the VMS cabinet.

• The video management system shall offer both video stream and video stream

storage management. Further to this all camera, channels shall be individually

configurable with respect to frame rate and resolution.

• The optimum frame rate shall be 20 frames per second, and system shall be

designed in such a way, and be event (motion) triggered recording.

• Cameras should be ONVIF and H.264 compliant.

• System should be able to manage and guarantee bandwidth and provide frame

rate control.

• System should support multiple IP video streams.

• System should be able to record 50 cameras simultaneously or more.

4.6 Cameras

The IP-based surveillance cameras supplied by the contractor are required to function in

conjunction with the Network Video Management Software (NVMS) to provide a complete

solution.

To reduce network bandwidth and processor loading each camera is to employ HDSM to

operate seamlessly between the network video recorders and the remote monitoring

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

workstations. To achieve the required level of detail, all camera types supplied and

installed should not provide less than 135 pixels/metre of digital image clarity.

All cameras must be able to cope adequately with variable lighting conditions and

specifically in scenes where simultaneous low and high light exist concurrently. This will

ensure facial identification in all scenes, and under all conditions, where such cameras

are to be installed.

4.7 General Specifications for ALL IP-Cameras

The camera shall satisfy these minimum specifications requirements:

Smart:

• Must support a minimum of 4 behaviour analysis, line crossing, intrusion detection,

unattended baggage detection, and object removal detection,

• Support Smart recording, edge recording,

• Support start encoding, low bit rate, low latency,

Image:

• HD 1920x1080@30fps,

• Support H.264+/H.264/MJPEG video compression, multi–level video quality

configuration,

• Support defog, BLC/3D DNR/ROI/HLC,

Infrared:

• Smart IR, prevent over exposure in close distance,

Network:

• Must support network storage via micro-SD/SDHC/SDXC card (128G), local storage

and NAS (NFS, SMB/CIFS), ANR,

• Shall support alarm trigger on: Motion detection, video tampering, network

disconnected, IP address conflict, illegal login, HDD full, HDD error, Alarm input, Alarm

output,

Interface:

• Support Audio I/O (-S) 1 Input (line in/mic in, 3.5 mm), 1 output (3.5 mm) support two-

way audio communication,

• Support Communication Interface via 1 RJ45 10M/100M self-adaptive Ethernet port,

RS485,

4.8 The camera shall have the following key features:

Indoor dome Camera:

• 1/2.8" Progressive Scan CMOS,

• 1920 × 1080 @60fps,

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

• High frame rate,

• Dark fighter or Light finder technology,

• H.265, H.265+,

• 120dB WDR,

• IP66, IK10,

• IR range: up to 40 m,

• BLC/3D DNR/ROI/HLC,

• Smart encoding: Support low bit rate, low latency,

• Colour: 0.005 Lux @ (F1.2, AGC ON), 0 Lux with IR,

• Colour: 0.0068 Lux @ (F1.4, AGC ON), 0 Lux with,

Outdoor dome Camera

• 1/2.8" Progressive Scan CMOS,

• 1920 × 1080 resolution,

• 2.8 to 12 mm focal length,

• Dark fighter/Light finder technology,

• H.265, H.265+, H.264+, H.264,

• 120dB Wide Dynamic Range,

• BLC/3D DNR/ROI/HLC,

• IP67, IK10,

4.9 Monitoring Workstation System

The CCTV room shall include remote monitoring capability for both CCTV and

Access Control Systems as follows:

• A Remote Monitoring Workstation (RMWS) for the IP Based CCTV Surveillance

System as well as for the Access Control System,

• 40” LED wall mounted display monitors, supplied complete with TV license, and

mounting brackets,

• Workstation periphery equipment such as DVI splitter, Keyboard, Video, Mouse,

(KVM) switch, etc.

The Remote Viewing stations shall:

• Consist of a professional enterprise quality Remote Monitoring Workstation (RMWS)

specifically designed to achieve the highest performance for viewing within a multi-

megapixel High Definition Surveillance System,

• Be supplied in a desktop form factor and must have the capacity to support up to four

high resolution (full-HD) monitors displaying a total 144 channels of concurrent video,

• Be pre-loaded with Client Software and supplied with a keyboard and mouse,

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

4.10 Structured cabling for CCTV

General

All cameras and access control systems mounted within the building will be linked to and

powered by a star-topology distributed network of cables, POE switches, patch panels,

brush panels and in Cabinets.

Cables

All cables shall be Molex Category 6 specification with a bandwidth of 250 MHz and a

maximum data rate of 10 Gbps. Cables must meet the requirements of TIA/EIA-568-C.2,

CAT 6 specifications. Gold plated contacts must give an insertion / extraction life of 1000

cycles.

The cable must be Molex and feature four stranded pairs, 24 AWG stranded copper,

insulation and a PVC jacket (4 pair UTP). The cables must have an attenuation of 40.5 dB

per 100 meters at 250 MHz.

Permanent Connections:

All permanent connections are to be silver-plated 45° insulation displacement

contacts.

Patch Panels:

Patch panels shall be 24-way or 48-way as specified in the Bills of Quantities CAT 6 RJ

patch panels suitable for 250 MHz. They shall utilize high performing km8 keystone jack.

They shall allow expansive cable management, full fixing kit and twin labelling

management.

The panels should meet the requirements of TIA/EIA-568-C.2, CAT 6 specifications.

Panels must be used for universal wiring, with labelling for T568-A or T568-B wiring.

Connectors should be RJ-45 female for straight through wiring.

Patch panel shall be typing Molex.

4.11 POE Cisco Switches

Bidders are to provide 12-port,24-port and 48-port POE Cisco Switches as indicated in

the BoQ. The switches shall feature 24 or 48 10/100/1000 Ethernet ports shall be RJ-45

connectors. The switches shall support wireless or voice over IP use and have maximum

power of 15.4W to an Ethernet port. The switches shall come complete with AC power

adapter, rack mounting kits complete with fans and all associated software / registration

requirements.

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

4.12 Data Cabinets

The 19” cabinets shall be as follows:

• have an aluminium frame, size as detailed in the Bills of Quantities,

• fitted with four depth reducers,

• fitted with blank floor plates,

• fitted with four high performance ball bearing low-noise fans at the top of the cabinet to

• fitted with tinted safety plexi-glass doors and lockable doors. Two keys with label tags

to be supplied

• All labelling shall be printed with permanent ink PVC labels. All printed labels shall be

black on white with a font size of at least 8mm.

1.1 Training Programme

Bidders shall allow for training of at least four (4) persons, as nominated by the user department.

1.2 Operating manuals

Three complete sets of the operating manuals, in English, shall be provided to be used by the

user department.

1.3 Guarantees and Maintenance

With effect from the date of firs delivery certificate, the contractor shall at his own expense

undertake regular servicing of the installation during the maintenance period of 12 months and

shall make all adjustments necessary for the correct operation thereof

SECTION IV: SCHEDULE OF RATES FOR MATERIAL

1. SCHEDULE OF QUANTITIES

The rates are to be used in the relevant sections of the Schedule of Quantity for pricing.

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

SCHEDULE OF QUANTITIES

The quantities in these Bill of Quantities are provisional and shall be measured as executed and

paid for according to prices in the Bill of Quantities and any unexpended amounts shall be

deducted from the amount of the contract sum.

The quantities in these Bill of Quantities are not to be used for ordering materials.

The Bill of Quantities form part of and must be read in conjunction with the specification, which

document contains the full description of the work to be done and material and equipment to be

used and unless otherwise described in the Bill of Quantities, reference should be made to the

specification for the full meaning or description of work to be done and materials and equipment

to be used in this service.

The total tender price on the Tender Form shall constitute the contract price of the successful

tenderer. Bidders are advised to check their item extensions and total additions, as no claim for

arithmetical errors will be considered.

No alteration, erasure or addition is to be made in the text of the Bill of Quantities. Should any

alteration, or erasure be made, it will not be recognized but the original wording of the Bill of

Quantities will be adhered to.

The priced Bill of Quantities of the successful tenderer will be checked and the Engineer reserves

the right to call for adjustment to any individual price and to rectify the discrepancy.

Variations in the scope and extent of the work included in the Bill shall be allowed to meet the

employer's requirements and shall be measured and costed at rates entered in the Bill, where

appropriate, and shall form additions to or deductions from the total of the Bill.

Any items or variations for which rates have not been included in the Bill shall be agreed and

priced as non-scheduled items in accordance with the provisions of the contract.

The rules covering the extent and costing of the variation shall be those provided for in the form of

conditions of contract.

Unless a separate rate for the supply and for the installation of any item is specifically called for,

the supply and installation cost of any item shall be fully included in the unit price.

The description of each item shall, unless otherwise stated herein, be held to include making,

conveying and delivering, unloading, storing, unpacking, hoisting, waste, patterns, models and

templates, plant, temporary works, return of packing, establishment charges, profit and all other

obligations arising out of the conditions of contract.

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY – BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

All fittings and accessories always include the connections thereto. All measurements are nett, unless

otherwise stated, and Bidders must allow in their rates for wastage.

The quantities and rates included for day work shall form part of the tender price, but Bidders

shall note that this item must be regarded as provisional and will only be payable to the contractor

if and when a written order to this effect has been issued.

All provisional sums shall be expended as directed by the Engineer and any balance remaining

shall be deducted from the amount of the contract sum.

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

PART 3 – Conditions of Contract and Contract Forms

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

PART IV: FORMS TO BE COMPLETED BY BIDDER

A INFORMATION ABOUT THE BIDDER

B AUTHORITY FOR SIGNATORY

C SCHEDULE OF WORK EXECUTED BY THE BIDDER

D SCHEDULE OF WORK TO BE SUB-LET

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

A. INFORMATION ABOUT THE BIDDER

1. IF THE BIDDER IS A COMPANY

1.1 Directors of the Company

List the Directors of the Company, their nationality together with the date on

which each Director has been appointed:

Name of Director Date of Appointment Nationality

……………………… ………………………

………………………

……………………… ………………………

………………………

……………………… ………………………

………………………

1.2 Shareholding

(a) List all the shareholders of the Company:

Full names Nationality

………………………………………………. ……………………

………………………………………………. ……………………

………………………………………………. …………...……….

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

(b) List all companies of which the Company is a shareholder:

…………………………………………………………………………………………………

………….

…………………………………………………………………………………………………

………….

…………………………………………………………………………………………………

………….

…………………………………………………………………………………………………

………….

2. IF THE BIDDER IS A CLOSED CORPORATION

List the members of the Closed Corporation, their nationality including, their

date of appointment as well as their percentage interest in the C.C.

Name of Member Date of Appointment % Interest in C.C. Nationality

……………………… ……………………… ……………

………………………

……………………… ……………………… ……………

………………………

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

……………………… ……………………… ……………

………………………

3. IF THE BIDDER IS A PARTNERSHIP

List the partners in the Partnership, the date of accession as well as each one's

profit/loss distribution ratio.

Name of Partner Date of Accession Profit/loss Nationality

Distribution

Ratio

…………………………… ………………………

………………

………………………

…………………………… ………………………

……………………. ………………………

…………………………… ………………………

……………………. ………………………

…………………………… ………………………

……………………. ………………………

4. IF THE BIDDER IS AN INDIVIDUAL

Supply the full names, and I.D. number of the Bidder:

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

Full names I.D. Number Nationality

……………………………… ……………………….

………………………

………………………………… ……………………….

………………………

………………………………… ……………………….

………………………

SIGNED ON BEHALF OF BIDDER: ..................................................

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

B. AUTHORITY FOR SIGNATORY

Signatories for Companies, Partnerships or Closed Corporations must establish

their authority by attaching a copy of the relevant resolution of their Board of

Directors, Members or Partners duly signed and dated. An example is shown

below for a Company:

By resolution of the Board of Directors at a meeting on .................................

..............................................................................................................2026.

at ...................................................................................................................

Mr ...................................................................................................................

whose signature appears below, has been duly authorized to sign all

documents in connection with this

Bid Reference No. ..........................................................................................

on behalf of (block capitals) ...........................................................................

.

SIGNED ON BEHALF OF COMPANY:

.....................................

........................

IN HIS CAPACITY AS:

.....................................

........................

DATE:

.....................................

........................

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

SIGNATURE OF SIGNATORY:

.....................................

........................

WITNESSES: 1. .......................................................................

2. .......................................................................

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

C. SCHEDULE OF WORK EXECUTED BY THE BIDDER

1. COMPLETED CONTRACTS

The Bidder must insert in the spaces provided below a list of work completed

by him during the past five (5) years. Only work of a similar nature to this

Contract must be listed.

CONSULTING NATURE

EMPLOYER ENGINEER OF YEAR

NAME AND TEL. WORK COMPLETE

D

2. CURRENT CONTRACTS

The Bidder must insert in the spaces provided below, a list of work at present

under construction by his firm.

CONSULTING VALUE EXPECTED

EMPLOYER ENGINEER NATURE OF COMPLETIO

NAME AND OF WORK N

TEL. WORK DATE

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

SIGNED ON BEHALF OF BIDDER: ...........................................

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

D. SCHEDULE OF WORK TO BE SUB-LET

The Bidder shall list below items of specialized work on this Contract which he

intends to sub-let.

If the Bidder intends to carry out specialized work himself, he shall state this.

The acceptance of this Bid shall not be construed as approval of the work to be

sub-let. Should any or all of the Sub-contractors not be approved subsequent

to acceptance of Quotation, this shall in no way invalidate this Bid and the

quoted rates and prices for the various items of work shall remain final and

binding even in the event of a Subcontractor not listed below, being approved

by the Engineer.

ITEM DESCRIPTION OF NAME OF

WORK SUBCONTRACTOR

SIGNED ON BEHALF OF BIDDER: ..........................................................

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

PART V : SCHEDULE OF INFORMATION

(a) The Tenderer shall state in the Schedule of Information the requested

information.

(b) Approval of equipment and materials will be subject to full submission of

information specified in Part 4 and / or Part 5.

(c) Full technical brochures with marked-up design points shall be submitted with

this part.

(d) Failure to complete this Schedule of Information will invalidate the Tender.

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

6.1 SCHEDULE OF MATERIAL

(i) POE Switches:

Manufacturer's Name:

.................................................................................................................

Country of Origin:

.........................................................................................................................

(ii) Patch Panel:

Manufacturer's Name:

..................................................................................................................

Country of Origin:

........................................................................................................................

(iii) UTP Cable:

Manufacturer's Name:

..................................................................................................................

Country of Origin:

........................................................................................................................

(iv) RJ45 Outlets:

Manufacturer's Name:

..................................................................................................................

Country of Origin:

........................................................................................................................

(v) Fibre Patch Panel:

Manufacturer's Name:

..................................................................................................................

Country of Origin:

........................................................................................................................

(vi) Data Cabinets:

Manufacturer's Name:

..................................................................................................................

Country of Origin:

........................................................................................................................

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

(vii) Indoor Camera:

Manufacturer's Name:

..................................................................................................................

Country of Origin:

........................................................................................................................

(viii) Outdoor Camera:

Manufacturer's Name:

..................................................................................................................

Country of Origin:

........................................................................................................................

(ix) Display Screen:

Manufacturer's Name:

..................................................................................................................

Country of Origin:

........................................................................................................................

(x) Access control:

Manufacturer's Name:

..................................................................................................................

Country of Origin:

........................................................................................................................

(xi) Magnetic Locks:

Manufacturer's Name:

..................................................................................................................

Country of Origin:

........................................................................................................................

(xii) Card Readers:

Manufacturer's Name:

..................................................................................................................

Country of Origin:

........................................................................................................................

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

PART VII : SCHEDULE OF RATES FOR VARIATIONS

7.1 GENERAL

7.1.1 The rates entered in this schedule shall serve unaltered to calculate the

value of variation orders (additions or omissions) issued in terms of the

Contract.

7.1.2 The rates entered shall exclude the Main/Principal Contractor's discount.

7.1.3 These rates shall include the following items necessary for the supply,

delivery, handling and installation of all applicable equipment:

Nett cost of material.

  • Profit, storing cost, handling charges, etc. for material.
  • Nett costs of labour.
  • Labour overheads and profit on labour.
  • General sales tax and any other duties payable.
  • Attributable overhead costs.

7.1.4 As the rates entered will only be used to calculate the value of variations,

the tenderer shall complete only those rates of items to be used

under this contract.

7.2 PROFIT ON MATERIAL FOR OMISSION AND ADDITIONS : (%)

The following percentage profit will be required on all materials for

additions or omissions not covered by any other section of this schedule.

This percentage shall include all direct overheads, handling charges, etc.

Nett percentage: ----------%

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY BID REFERENCE NO: W/ONB/00-00/00

CONSTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

7.3 RATES FOR ADDITIONAL LABOUR : (N$/h)

These rates shall be applied to determine labour costs not covered by any

of the other sections of this schedule.

Supervisor/ Qualified Appren- Conduit Labourer

Foremen artisan tice installer

Normal

rate ----------- --------- ---------- ---------

Overtime

(week) ----------- --------- ---------- ---------

Saturday

time ----------- --------- ---------- ---------

Sunday

time ----------- --------- ---------- ---------

7.4 RATES FOR TRANSPORT : (N$/km)

Rates shall include the cost of a licensed driver fuel, oil, maintenance, etc.

Vehicle capacity Rate per kilometer

Up TO 1500 kg ------------------

1600 to 3000 kg ------------------

3100 to 7000 kg ------------------

SIGNATURE OF TENDERER : ____________________ DATE:

____________

NAME OF TENDERER :

__________________________

_____________

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY BID REFERENCE NO: W/ONB/00-00/00

COTRUCTION AND RONOVATION OF THE BIPA PROPERTY ON ERF 8681 WINDHOEK:

ELECTRONIC INSTALLATIONS

ADDRESS :

_____________________________________

__

:

_____________________________________

__

:

_____________________________________

__

TELEPHONE NUMBER :

_____________________________________

__

FACSIMILE NUMBER :

_____________________________________

__

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY (BIPA)

PROCUREMENT REFERENCE NO:

PROPOSED NEW BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY(BIPA): ELECTRONIC INSTALLATIONS

No.1: GENERAL

ITEM DESCRIPTION UNIT QTY LABOUR MATERIAL TOTAL AMOUNT N$

RATE RATE RATE

GENERAL

Tenderers shall allow for the following

items whatever cost they may consider

necessary for carrying out and observance

of the item:

1.1 Transport Sum 1

1.2 Site Establishment Sum 1

1.3 Setting Out Sum 1

1.4 Progress Meetings Sum 1

1.5 Attendance for measurement Sum 1

1.6 Site Supervision Sum 1

1.7 Insurance, Warranties Sum 1

1.8 Telephone, stationery etc. Sum 1

1.9 Tests and inspection prior to completion. Sum 1

1.10 Allow for general items Sum 1

TOTAL CARRIED FORWARD TO SUMMARY

2518 - Electronics Installations Bill

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY (BIPA)

PROCUREMENT REFERENCE NO:

PROPOSED NEW BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY(BIPA): ELECTRONIC INSTALLATIONS

No 2: DATA AND STRUCTURED CABLING

ITEM DESCRIPTION UNIT QTY LABOUR MATERIAL TOTAL AMOUNT N$

RATE RATE RATE

DATA AND STRUCTURED CABLING

2.1 Supply and installation of Molex CAT 6 No 5

UTP highwire grey cable, 500m drum

2.2 Supply and installation of CAT 6 UTP 48 No 1

Port Patch Panel - Molex

2.2 Supply and installation of CAT 6 UTP 24 No 1

Port Patch Panel - Molex

2.3 Supply and installation of 48 port POE No 1

Cisco Switch - Catalyst 2960-S, 2 x SFP,

Lan Base

2.4 Supply and installation of 24 port POE No 1

Cisco Switch - Catalyst 2960-S, 2 x SFP,

Lan Base

2.4 Supply and installation of brush panels No 4

2.5 Supply and installation of single CAT 6 No 49

outlets Molex

2.6 Supply and installation of a 27U Panel No 1

Cabinet, free standing

2.7 Supply and installation of a 9U Panel Sum 1

Cabinet, free standing

2.7 Supply and installation of power supply for Sum 1

both cabinate

2.8 Supply and installation of all labels Sum 1

2.9 Supply and installation of fibre cable m 40

multimodem 8 Core, 50/125 MM

2.10 Supply and installation of fibre patch cord No 4

multimode

2.11 Supply and installation of fibre patch panel No 4

multi mode

2.12 Supply and installation of Cisco Catalyst No 1

Fibre switch - 12 Port

2.13 Supply and installation of SFP multimode No 5

1000 base module

2.14 Supply and installation of splice cassette No 1

multimode

2.15 Supply and installation of splice enclosure No 1

multimode

2.16 Supply and installation of entry gland No 2

multimode

2.17 Supply and installation of tray for fibre No 2

TOTAL CARRIED FORWARD

2518- Electronics Installations Bill

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY (BIPA)

PROCUREMENT REFERENCE NO:

PROPOSED NEW BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY(BIPA): ELECTRONIC INSTALLATIONS

No 2: DATA AND STRUCTURED CABLING

ITEM DESCRIPTION UNIT QTY LABOUR MATERIAL TOTAL AMOUNT N$

RATE RATE RATE

BROUGHT FORWARD

2.18 Supply and installation of mid-couplers No 2

multimode

Supply and installation of unjacketed No 4

pigtails 50/125 MM multimode

2.19 Supply and installation of flylead 1m long, No 49

Molex

2.20 Supply and installation of patch cord 1m No 49

long, Molex

2.21 Supply and installation of cabinet fan No 1

pack, complete with plug top, cable and

finger guard

2.22 Supply and install items required but not

listed:

(i) Sum 1

(ii) Sum 1

(ii) Sum 1

TOTAL CARRIED FORWARD TO SUMMARY

2518- Electronics Installations Bill

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY (BIPA)

PROCUREMENT REFERENCE NO:

PROPOSED NEW BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY(BIPA): ELECTRONIC INSTALLATIONS

No 3: CCTV

ITEM DESCRIPTION UNIT QTY LABOUR MATERIAL TOTAL AMOUNT N$

RATE RATE RATE

CCTV

3.1 Supply and installation of high definition

internal IP cameras, day/night, 5MP, HD

resolution with intergrated IR illuminators

I) Indoor dome cameras No 12

I) Bullet cameras No 15

3.2 Supply and installation of NVR with 4TB No 1

HDD, main and back-up

3.3 Supply and installation of NVR, server, Sum +

storage for 28 days

3.4 Supply and installation of 18 Port PoE No 2

switches

3.5 Supply and installation of all network and Sum 1

related cables

3.6 Supply and installation of HD 46" monitor No 2

3.7 Allow for all licences as follows:

(i) general software Sum 1

(ii) camera licences No 27

3.8 Supply and installation of 19'' industrial No 1

cabinets complete

3.9 Allow for integration into system for Sum 1

designated workstations

3.10 Allow for any items not detailed above but

necessary for successful completion of the

(i) Sum 1

(ii) Sum 1

(iii) Sum 1

TOTAL CARRIED FORWARD TO SUMMARY

2518- Electronics Installations Bill

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY (BIPA)

PROCUREMENT REFERENCE NO:

PROPOSED NEW BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY(BIPA): ELECTRONIC INSTALLATIONS

No 4 : ALARM SYSTEM

ITEM DESCRIPTION UNIT QTY LABOUR MATERIAL TOTAL AMOUNT N$

RATE RATE RATE

ALARM SYSTEM

4.1 Supply and installation of PIR Sensors No 25

4.2 Supply and installation of door contacts No 8

4.3 Supply and installation of controller box No 2

complete with accessories

4.4 Supply and installation of 15W siren No 2

including wiring, etc

4.5 Supply and installation of 6 Core Cabling Sum 1

4.6 Supply and installation of red light above Sum 8

door includng wiring, etc

4.7 Allow for co-ordination and intergration of Sum 1

radio transit to armed response company

4.9 Supply and installation of alarm keypad No 2

with accerssories

4.10 Allow for any item not included above but

necessary for the completion of the

installations:

(i)............................................................ Sum 1

(ii)....................................................... Sum 1

(iii)................................................... Sum 1

TOTAL CARRIED FORWARD TO SUMMARY

2518 - Electronics Installations Bill

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY (BIPA)

PROCUREMENT REFERENCE NO:

PROPOSED NEW BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY(BIPA): ELECTRONIC INSTALLATIONS

No 5 TRAINING

ITEM DESCRIPTION UNIT QTY LABOUR MATERIAL TOTAL AMOUNT N$

RATE RATE RATE

TRAINING

5.1 Allow for staff training to 5 people for 1 Sum 1

days (8hrs) for the CCTV, Alarm and Data

& structured cabling

TOTAL CARRIED FORWARD TO SUMMARY

2518 - Electronics Installations Bill

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY (BIPA)

PROCUREMENT REFERENCE NO:

PROPOSED NEW BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY(BIPA): ELECTRONIC INSTALLATIONS

No 6 MAINTENANCE

ITEM DESCRIPTION UNIT QTY LABOUR MATERIAL TOTAL AMOUNT N$

RATE RATE RATE

MAINTENANCE

6.1 Cost required for the 12 month Sum 1

maintenance period including at least one

site visit every 3 months.

TOTAL CARRIED FORWARD TO SUMMARY

2518 - Electronics Installations Bill

BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY (BIPA)

PROCUREMENT REFERENCE NO:

PROPOSED NEW BUSINESS AND INTELLECTUAL PROPERTY AUTHORITY(BIPA): ELECTRONIC INSTALLATIONS

SUMMARY OF SECTIONS

SECTION DESCRIPTION AMOUNT N$

SECT 1 GENERAL

SECT 2 DATA AND STRUCTURED CABLING

SECT 3 CCTV

SECT 4 ALARM SYSTEM

SECT 5 TRAINING

SECT 6 MAINTENANCE

SUB-TOTAL

ADD 10% CONTINGENCIES

TOTAL ELECTRONICS BID AMOUNT

2518 - Electronics Installations Bill

TECHNICAL SPECIFICATIONS, BILL OF

QUANTITIES AND DRAWINGS FOR AIR

CONDITIONING AND VENTILATION

INSTALLATIONS

Contents

Section 1: Eligibility Criteria

Section 2: Technical Specifications

Section 3: Forms to be Completed by Bidder

Section 4: Bill of Quantities

Section 5: Schedule of Rates for Variations

Section 6: Evaluation Criteria for Bidder

Section 7: List of Drawings

SECTION 1: ELIGIBILITY CRITERIA

To be eligible to participate in this Restricted Bidding exercise, the Bidder should:

(a) have a valid company Registration Certificate;

(b) have an original valid good Standing Tax Certificate;

(c) have an original valid good Standing Social Security Certificate;

(d) have a valid certified copy of Affirmative Action Compliance Certificate, proof from Employment

Equity Commissioner that bidder is not a relevant employer, or exemption issued in terms of

Section 42 of the Affirmative Action Act, 1998;

(e) have a written undertaking as contemplated in section 138(2) of the Labour Act, 2007

(f) have a certificate indicating SME Status (for Bids reserved for SMEs);

(g) be registered with the Procurement Policy Unit (for Bids reserved to categories of bidders and

goods);

(h) submit signed Bid-Securing Declaration.

(i) in case of a Joint Venture, all parties must submit the above and a valid JV Agreement

(j) have a detailed company profile showing a list of the HVAC works carried out to date and the

value of those HVAC works.

SECTION 2: TECHNICAL SPECIFICATIONS

2.1 GENERAL

This specification is for the supply, delivery, installation, and testing, commissioning and free

maintenance during the guarantee period of:

• Air Conditioning & Ventilation Equipment specified

At the new BIPA Office Development on Erf 8681, Windhoek.

The specification and drawings form part of, and shall be read in conjunction with all contract

documents and drawings; bills of quantities and the project specifications dealt with in this

section.

2.2 LOCATION OF THE SITE AND SITE CONDITIONS

The site is located on Erf 8681 in Windhoek, Khomas Region.

The average site altitude is 1,650m above sea level. The average minimum

and maximum temperatures are ±4°C and 38°C during the winter and summer months

respectively.

No official site inspection will be conducted prior to bid closing date and bidders must ensure

that they familiarise themselves with local conditions.

2.3 CONTRACTOR’S RESPONSIBILITIES

The Ventilation Contractor shall be responsible for the supply, installation, testing,

commissioning and free maintenance during the guarantee period of the installation detailed

in this specification and on the accompanying drawings.

The Ventilation Contractor shall provide all materials, equipment, labour and services

necessary for the complete, safe and efficient operation of the electrical installation in

accordance with the intention of this specification and drawings.

The work shall be carried out strictly in accordance with the following:

• The Machinery and Occupational Safety Act No. 6 of 1983 and the relevant regulations

as amended.

• Manufacturers Installation manuals of the various equipment.

• SABS 400: National Building Regulations

• SABS 0147: Refrigerating systems including plants associated with air conditioning

systems

• SABS 1238: Air-conditioning ductwork

Please note the following:

• As-built drawings to be submitted upon completion of the contract.

• Comprehensive operating and maintenance manuals shall be submitted upon the

completion of the contract.

Conflicts between specification and drawing if any such conflict is discovered where upon

the Engineer shall be informed.

2.4 SUMMARY OF WORKS

The work, as detailed in the attached specifications and accompanying drawings, includes

the, supplying / manufacturing, delivery, installation, testing, commissioning and free

maintenance for 12 months during the guarantee period to provide the Employer with a fully

functional and operable mechanical plant.

2.5 WORK INCLUDED & EXCLUDED FROM THIS CONTRACT

The installation excludes:

All work specified in this document form part of this contract unless specifically excluded. All

building work will be done by others.

The following work does not form part of the contract:

• Building and finishing of the buildings and all other associated work;

• Electrical distribution outside of the buildings. Electrical points for the equipment will be

contractor will do the final connections of all HVAC equipment.

2.5.1 The installation includes:

• Supply and installation of Air Conditioning and Ventilation equipment as outlined in the

Engineer’s Drawings.

The successful bidder shall provide all materials, tools, equipment, labour and services

necessary for the complete, safe and efficient operation of the installation in accordance

with the intent of this specification.

2.6 INTERPRETATION OF DOCUMENTS AND DRAWINGS

The bid document shall be read in conjunction with the relevant drawings and, in case of

discrepancies, such discrepancies must be pointed out to the Engineer. Likewise, any

obvious errors and/or omissions in the bid document or on drawings shall be pointed out to

the Engineer and he shall rectify all such errors in writing.

The positions of equipment, service outlets, etc., as shown on the drawings are approximate,

and in some cases diagrammatic. The successful Bidder must verify the actual positions on

site before construction and/or installation thereof can commence as no extra's will be allowed

for any alterations to work proceeded with before proper verification.

Before fixing equipment, the Ventilation Contractor shall check with the Main Contractor on

his detail drawings for the exact positioning of outlets and/or equipment. Any discrepancies

between the Main Contractor's detail drawings and the Mechanical Engineer's drawings must

be pointed out to the Engineer. The Ventilation Contractor shall co-ordinate all work on site

with the other Successful bidders as well as with drawings for other services.

Bid drawings must be handed in with the completed bid document, as bids without drawings

will be regarded as incomplete. The Sub-Contractor shall sign these drawings and clearly

mark all proposed alterations, deviations and errors with a red ink pen.

2.7 WORK PROGRAMME

The preliminary programme for the execution of the works is as follows:

Hand-over of site to Main Contractor -

Estimated Handover to Successful bidder -

Practical Completion and Hand-over of Completed Works to -

Employer

End of Defects liability period -

The Successful bidder shall co-ordinate his work programme with that of the Main

Contractor and submit his programme to the Engineer for approval.

2.8 PROJECT TECHNICAL SPECIFICATIONS

2.8.1 General

2.8.1.1 Refrigerant Insulation

All refrigerant suction tubes shall be insulated with 10 mm TERMAFLEX Type 33SE

peroxydically improved (crosslinked) polyethylene foam tube insulation with quick-zip

fastener, which shall meet the following requirements:

Temperature range - 80 to + 120°C.

Thermal conductivity:

+ 30°C 0,038 °C W/m²K

0°C 0,038 °C W/m²K

– 30°C 0,031 °C W/m²K

Specific mass 35 kg/m³

Odour properties Neutral

Cellular structure Totally enclosed

Fire properties Self-extinguished to DIN

4012-B1

and ASTMD-11692-59T.

Insulation exposed to weather, or where required for protection against mechanical damage,

shall be protected with aluminum, galvanized steel stainless steel sheet.

2.8.1.2 Refrigerant Charge

The refrigerant shall be either R410a or R407. The Contractor shall charge the system free of

cost to the Client for the first year of plant operation, i.e. any leak will be rectified and the

system shall be charged by the Contractor during the defects liability period at no extra cost.

The pipework shall include a refrigerant charge point in the plant room, where the system can

be filled if required.

2.8.1.3 Refrigerant Piping

Please refer to standard specifications.

• Materials & Installation: Strictly as per Manufacturers specifications; the Contractor

shall submit routing drawings / sketches to the Engineer for approval.

• Sizing of refrigerant: Strictly as per Manufacturers specifications lines.

• Factory charged systems shall first be pressure tested and thereafter be vacuum

tested. Field charged systems shall only be pressure tested.

• Refrigerant pipes and equipment shall be tested under vacuum and indications of leaks

shall not be permitted at a pressure of 0, 68 kPa absolute, maintained for a period of one

hour with the vacuum pump uncoupled.

• Refrigerant pipes and equipment shall be tested with clean dry nitrogen with a small

quantity of refrigerant for a period of 24 hours at a test pressure of 1.1 times the

appropriate maximum working pressure in terms of SABS 0147 – 1978: code of Practice

for Refrigeration and Air Conditioning Installations.

• All connections shall be inspected for leaks by mean of a sensitive leak detector and soap

bubble test.

• Flexible metal vibration absorbers shall be fitted at the compressor discharge and suction

connections.

• Refrigerant tubing shall be secured in fittings padded with at least 13 mm thick felt strip, to

prevent transmission of vibration.

2.8.1.4 Condensate drain piping

Materials Ceiling void: uPVC all piping exposed to mechanical damage :

copper

uPVC piping exposed to direct sunlight required a UV resistant

paint coating

Sizing Strict as per relevant drawing

Slope preferably : 1:50

Min : 1:100

Accessories First 3 m of condensate line (if mounted in ceiling void) shall be

required Insulated P-Trap shall be installed if the condensate line

terminates in the sewer Reticulation (To prevent the migration of

unwanted odours).

All pipes, vessels etc. operating below ambient dew point shall be insulated and a vapour

barrier provided.

2.8.1.5 Pipe supports

Piping and cables against outside walls shall be covered with adequately sized "Instruct"

channels, which shall be painted after installation. Hangers and supports to allow adjustment

of slope of piping and removal without dismantling pipes. Hangers and supports to be

complete with all necessary structural steel, rods, bolts, nuts, turnbuckles and other

components including clamps, rods, bolts, nuts etc. to be painted with two coats of zinc

chromate primer and where exposed to view with two additional coats of approved oil paint.

2.8.2 Split Air conditioners

2.8.2.1 General requirements

• The units shall be completely protected against over pressure in the system and

improper operation by the user.

• The temperature to be gradually adjustable and automatically controlled within 2°C

by a thermostat.

• The indoor unit to have three selectable fan speeds.

• The indoor unit shall be quiet running with an average sound pressure level measured

at a distance of 2m not exceeding 28 dB(A) at the low setting and 30 dB(A) at the

high setting respectively, and the centrifugal fan shall be completely balanced.

• Air filters to be easily accessible for cleaning.

• The controller shall be mounted as indicated on the drawing.

• The electrical sub-contractor will provide a 100 x 100 outlet with a 25-mm conduit to

above ceiling for the controls.

• The room temperature shall be sensed at the return air inlet of the indoor unit.

• Condensate water to be discharged as indicated on the drawing.

• The gas and liquid piping to be insulated to prevent moisture condensation. All

piping to be installed on galvanised mild steel cable trays provided by the sub-

contractor.

• The outdoor units shall be mounted on suitable heavy-duty angle iron wall mounted

brackets painted same colour as wall and provided by the sub- contractor.

• Wired control panels are preferred for this type of unit.

All split units shall be of the inverter controlled compressor type.

2.8.2.2 High Wall mounted Split (HWS) Units

The following wall mounted split type (HWS) air-conditioners, complete as specified on the

relevant drawings, shall be provided. The air-conditioner shall conform to the following detail

requirements and shall be provided with a:

Make : Samsung or Daikin

Type : High wall split (HWS)

Locations & capacities : As per drawing

Heating/cooling : Cooling and Heating

Installation : Strictly in accordance with Manufacturer’s specifications;

Aesthetics of the installation is of utmost importance

Electrical : 230VAC/50Hz/1phase or

2.8.2.3 Installation Details for outdoor unit

Outdoor units for the high wall split air conditioners shall be bolted to an approved supporting

structure manufactured from welded 40 x 40 x 4 angle iron sections. 3 mm fillet welds shall

apply throughout. The framework shall be adequately bolted to the wall. The framework shall

be thoroughly cleaned and neatly painted in a colour scheme to be approved by the Engineer.

The indoor units shall be installed according to manufacturer’s instructions. Piping between

the indoor and outdoor units shall be chased in walls or installed above the ceiling. Making

good afterwards will be done by the principle contractor.

The outdoor unit shall always be selected in such a manner that the connected indoor units

require the full capacity of the outdoor unit. The outdoor units shall preferably be selected for

the least total number of units.

All outdoor units must be installed on the roof slab on top of the line shops. The outdoor units

shall be installed according to manufacturer’s instructions.

2.8.2.4 Remote Control Panels (RCPs)

RCP’s shall be installed next to the door of the room.

2.8.2.5 Cassette type air-conditioning unit

• Ceiling cassette type cooling cycle only air-conditioner shall be installed in position as

indicated on the drawings.

• The units shall be completely protected against over pressure in the system and

improper operation by the user.

• The temperature to be gradually adjustable and automatically controlled within 2°C by a

thermostat.

• The indoor unit to have three selectable fan speeds.

• The indoor unit shall be quiet running with an average sound pressure level measured

at a distance of 2m not exceeding 35 dB(A) at the low setting and 43 dB(A) at the high

setting respectively, and the centrifugal fan shall be completely balanced.

• Air filters to be easily accessible for cleaning.

• The controller shall be mounted as indicated on the drawing. The electrical sub-

contractor will provide a 100 x 100 outlet with a 25-mm conduit to above ceiling for

the controls.

• The room temperature shall be sensed at the return air inlet of the indoor unit.

• Condensate water to be discharged as indicated on the drawing.

• The gas and liquid piping to be insulated to prevent moisture condensation. All

piping to be installed on galvanised mild steel cable trays provided by the sub- contractor.

• The outdoor units shall be mounted on suitable heavy-duty angle iron wall mounted

brackets painted same colour as wall and provided by the sub-contractor.

• Wired control panels are preferred for this type of unit.

2.8.2.6 Installation

Installation of the units shall be strictly in accordance with the manufacturer’s specifications

and requirements. Aesthetics are considered to be of the utmost importance.

2.8.2.7 Capacities

The capacities indicated in the tender drawings are the de-rated effective capacities at

ambient temperature and pressure. Any equipment offered by the Tenderer shall meet or

exceed the requirements as indicated.

2.8.3 Rooftop Packaged Air Conditioning Units

The following rooftop packaged air-conditioners, complete as specified on the relevant

drawings, shall be provided. The air-conditioner shall conform to the following detail

requirements and shall be provided with a:

Make : Daikin

Model : UATYQ550CY1

Cooling Capacity : 55.59 kW

Type : Rooftop Packaged Air Conditioning Unit

Locations & capacities : As per drawing

Heating/cooling : Cooling and Heating

Installation : Strictly in accordance with Manufacturer’s specifications;

Aesthetics of the installation is of utmost importance

Electrical : 400VAC/50Hz/3phase

2.8.4 VENTILATION Equipment

General

2.8.4.1 Ductwork Material

Ductwork shall be fabricated from prime quality galvanised sheet steel, except where

otherwise called for.

2.8.4.2 Fabrication Standards

Ductwork shall be fabricated and installed in accordance with the following specification which

shall be read in conjunction with the standards laid down by the Sheet Metal and

Refrigeration Contractors National Association (of America) (SMACNA) which standards shall

be adhered to in detail excepting only as hereinafter specified.

2.8.1.3 Rectangular Ductwork

Duct Size Long Side - Up to 750 mm 751 to 1370 1371 to 2130 2131 upwards

mm

Sheet Steel Thickness - mm

0,6 0,8 1,0 1,2

Cross Bracing Length - mm

2400 2400 2400 2400

Longitudinal Seams Pittsburgh Lock for all Duct Sizes

Cross Joints At Maximum Centres of 2400mm / 1220mm

Long Side S’Slip 25mm 38mm 38mm Bar Slip

Slip Slip Reinforced or

Short Side Drive Slip Drive Slip 38 x 2mm L.

If under 450 mm Reinforced Standing seam

otherwise 38mm or 38 x 3 mm

Bar Slip L Flanges

ALTERNATIVELY on all Pocket Lock Pocket Lock Pocket Lock

sides 25 mm 38 mm 38mm L.RFD

Supports Minimum

Angles - mm 38 x 3 38 x 5 38 x 6 50 x 6

Rods. Dia. mm 6 10 12 12

Spacing, maximum - 3600 3000 2400 1800

mm

NOTE: SHEET METAL STRAPS WILL NOT BE ACCEPTED FOR SUSPENSION OF

DUCTWORK

Rectangular ductwork shall be regarded as low velocity ductwork suitable for pressures up

to 50mm wg and velocities up to 10 meters per second. It shall accordingly be fabricated

and installed in compliance with the above requirements and the “Low Velocity Duct

Construction Standard” manual published by SMACNA.

2.8.1.4 Circular Ductwork

Circular ducting of approved size shall be installed in all exposed areas, i.e. Trading Areas.

2.8.5 Fans

2.8.5.1 General

Fans shall be statically and dynamically balanced and shall be free of any objectionable

vibrations. Fan bearings shall be selected for a minimum of 200 000 hours average life.

Lubrication points for fan bearings shall be readily accessible and shall where necessary be

extended to the outside of the fan casing. The shafts and bearings are to be properly

protected from rust and corrosion by means of suitable wrapping and protective grease

coatings prior to commissioning

Fan openings shall be provided with protective wire guards in accordance with the Manpower

and Occupational Safety Act, 1983. The unit shall be supplied with a safety harness or

weather cab complete with a back draught shutter

Fans shall be selected highest possible efficiency with lowest possible blade tip speed.

2.8.5.2 Axial Fans

Unless otherwise specified, axial flow fans shall be in-line, direct driven type, with motor

mounted inside the fan housing. The fan rotor assembly shall be attached directly to the

motor shaft.

The fan casings shall be spun from mild steel with integral pre-drilled and radiuses inlet

flange, hot dipped galvanized after manufacture. Vibration isolators shall be installed if

required.

Fans shall be provided with adjustable pitch blades. Fans installed under free intake

conditions shall be fitted with an inlet cone supplied by the fan manufacturer.

Fan motors shall be totally enclosed, rated for continuous operations of the squirrel cage

induction type suitable for vertical and horizontal installation and Class F insulation. Motor

protection shall be to IP55 with a temperature range between –40°C to +50°C. DONKIN, AMS

or WOODS fans will be preferred for this type of fan.

2.8.5.3 Capacities

The capacities indicated in the table below are the effective capacities. Any equipment offered

by the Bidding Ventilation Contractor shall meet or exceed the requirements as set out below.

Any alternative equipment offered, must be attached to the submitted bid.

Section II Table 1

Room/Area Existing Building Boardroom

Category Fresh Air Supply

Qty 1

Type Axial Fan

Req. Capacity 40 L/s

Make and Model S&P TD-350/125 SILENT or Equal

Req. Static Pressure 100 Pa or Greater

Max. Allowable Noise 40 dBA

Req. Accessories 1. Speed Controller

Section II Table 2

Room/Area New Building Boardroom

Category Fresh Air Supply

Qty 1

Type Axial Fan

Req. Capacity 50 L/s

Make and Model S&P TD 500/150 or Equal

Req. Static Pressure 100 Pa or Greater

Max. Allowable Noise 55 dBA

Req. Accessories 1. Speed Controller

2.8.5.4 Electrical Supply

Fan motors shall be totally enclosed, rated for continuous operation with sealed life bearings

and with Class F insulation. Motor protection shall be to IP55 with a temperature range

between –10ºC to +50ºC. Electrical supply will be provided by the electrical sub-contractor.

2.8.5.5 SOUND ATTENUATORS

Sound attenuators shall be provided and installed where necessary and shall be selected to

provide the Noise Criteria levels specified in Part Three hereof. Sound attenuators shall be

the factory fabricated product of an accredited manufacturer of such equipment such as

SOUND ATTENUATORS LIMITED or TROX, who publish selection data on their products

which data shall be submitted to the Engineers for approval of each sound attenuator offered.

Metalwork on sound attenuators shall be galvanised steel or aluminium and acoustic

insulation shall be non-combustible material, properly bonded and covered as so not to permit

insulation particles being eroded by air movement over them.

Sound absorbing lining material of sound attenuators in low velocity ductwork shall have a

density of not less than 24 kg/ms and a thickness of not less than 25 mm and in medium

pressure ductwork the thickness shall not be less than 50 mm with a minimum density of 48

kg/ms. Material for cell type sound absorbers shall be of the rigid type. The sound absorbing

efficiency at each frequency shall not be less than:-

Frequency-cycles per second 250 500 1000 2000

Percentage Absorption 45 65 70 80

Lining which is damaged in shipment or due to exposure or any other cause shall not be

installed and any material, which may be damaged prior to the final acceptance, shall be

replaced as directed by the Engineer.

Casings shall be manufactured of galvanized sheet steel not lighter than the thickness

previously specified herein for ductwork of the same dimensions.

2.8.6 INFORMATION, DIAGRAMS, DRAWINGS AND MANUALS TO BE SUBMITTED

As part of his bid and subsequent contract, it will be required from the Bidder/Contractor to

submit certain documents as per this section, in accordance with the following programme:

2.8.6.1 WITH THE BID (AT CLOSING DATE):

• Marked-up copies of all drawings indicating in red all required alterations to the

concrete, brickwork or whatever other aspect falling outside the scope of his contract;

• Manufacturer's pamphlets and/or brochures illustrating all equipment offered;

• Any other information that the Bidder regards necessary to clarify his offer.

2.8.6.2 Within 40 days after Award of the Contract:

• Working drawings of all ducting and piping routes showing layouts, equipment used

and dimensions.

• A work programme as specified herein.

2.8.6.3 On Completion:

• A complete set of "As-Built" drawings;

• A test & commissioning certificate

• Three sets of comprehensive maintenance/operating manuals prepared for the

specific installation including AS BUILT drawings, diagrams and maintenance

schedules etc.(Refer to the Standard specifications).

All manuals and certificates shall be completed in an orderly and logical manner, and shall be

bound in booklet form with a protective cover. The text of instructions, diagrams and

drawings shall be "English".

2.8.7 REJECTION OF INFERIOR WORK AND MATERIAL

All inferior work or work containing inferior material, shall be rejected by the Engineer at his

discretion, where upon the HVAC Contractor shall immediately remove and rectify the works

as required and bear all costs in connection therewith.

2.8.8 GENERAL STANDARD OF WORK

The specification and drawings are intended to show the type of plant required and the

minimum standard of equipment acceptable. Should bidders consider that additional plant,

fittings, etc be necessary to ensure a satisfactory and first class installation, these must be

allowed for on a separate priced sheet, indicating the extend of additional plant, fitting, etc.

In the absence of any such variations in the bid, it will be understood that bidders have

included for everything to ensure a satisfactory installation which will comply with good

Engineering Practice in all respects. All work shall be done by a competent person(s) who

has served a recognized apprenticeship or who has had a minimum of five years’ experience

in this type of installation.

2.8.9 TESTING AND COMMISSIONING

Applicable to this Contract – refer to Standard Specifications

2.8.10 12-MONTH FREE MAINTENANCE GUARANTEE

Applicable to this Contract – refer to Standard Specifications

The maintenance and guarantee period shall be twelve (12) months from the date of

successful first delivery acceptance and shall comply with the relevant clauses of the

Standard Specification.

It is required that bidders allow for 12 months maintenance services of the installation, four

visits, one every 3 months after successful practical conception.

SECTION 3: FORMS TO BE COMPLETED BY BIDDING VENTILATION CONTRACTOR

A INFORMATION ABOUT THE BIDDER

B AUTHORITY FOR SIGNATORY

C SCHEDULE OF WORK EXECUTED BY THE BIDDER

D SCHEDULE OF WORK TO BE SUB-LET

A. INFORMATION ABOUT THE BIDDER

1. IF THE BIDDER IS A COMPANY

1.1 Directors of the Company

List the Directors of the Company, their nationality together with the date on which

each Director has been appointed:

Name of Director Date of Appointment Nationality

................................................. ……………………............... ……………………….

................................................. ……………………............... ……………………….

................................................. ……………………............... ……………………….

1.2 Shareholding

(a) List all the shareholders of the Company:

Full names Nationality

………………………………………………. ……………………

………………………………………………. ……………………

………………………………………………. …………...……….

(b) List all companies of which the Company is a shareholder:

……………………………………………………………………………………………………

……………………………………………………………………………………………………

……………………………………………………………………………………………………

……………………………………………………………………………………………………

2. IF THE BIDDER IS A CLOSED CORPORATION

List the members of the Closed Corporation, their nationality including, their date of

appointment as well as their percentage interest in the C.C.

Name of Member Date of Appointment % Interest in C.C. Nationality

…………………………. ……………………….. …………………….. …………………

…………………………. ……………………….. …………………….. …………………

…………………………. ……………………….. …………………….. …………………

3. IF THE BIDDER IS A PARTNERSHIP

List the partners in the Partnership, the date of accession as well as each one's

profit/loss distribution ratio.

Name of Partner Date of Accession Profit/loss Nationality

Distribution

Ratio

…………………………….. …………………….. …………… …………………….

…………………………….. …………………….. …………… …………………….

…………………………….. …………………….. …………… …………………….

4. IF THE BIDDER IS AN INDIVIDUAL

Supply the full names, and I.D. number of the Bidder:

Full names I.D. Number Nationality

……………………………………….. …………………………….. ……………………

……………………………………….. …………………………….. ……………………

……………………………………….. …………………………….. ……………………

SIGNED ON BEHALF OF BIDDER: ..................................................

B. AUTHORITY FOR SIGNATORY

Signatories for Companies, Partnerships or Closed Corporations must establish their

authority by attaching a copy of the relevant resolution of their Board of Directors,

Members or Partners duly signed and dated. An example is shown below for a

Company:

By resolution of the Board of Directors at a meeting on ..........................................................

........................................................................................................................................ 2022.

at ..............................................................................................................................................

Mr .............................................................................................................................................

whose signature appears below, has been duly authorized to sign all documents in

connection with this

Bid Reference No. ....................................................................................................................

on behalf of (block capitals) ................................................................................................. .

SIGNED ON BEHALF OF COMPANY: ……………………………………………………...

IN HIS CAPACITY AS: ………………………………………………………………………..

DATE: …………………………………………………………………………….....................

SIGNATURE OF SIGNATORY: ……………………………………………………………

WITNESSES: 1. .......................................................................

2. .......................................................................

C. SCHEDULE OF WORK EXECUTED BY THE BIDDER

1. COMPLETED CONTRACTS

The Bidder must insert in the spaces provided below, a list of work completed by him

during the past five (5) years. Only work of a similar nature to this Contract must be

listed.

CONSULTING NATURE

EMPLOYER ENGINEER OF YEAR

NAME AND TEL. WORK COMPLETED

2. CURRENT CONTRACTS

The Bidder must insert in the spaces provided below, a list of work at present under

construction by his firm.

CONSULTING VALUE EXPECTED

EMPLOYER ENGINEER NATURE OF OF COMPLETION

NAME AND TEL. WORK WORK DATE

SIGNED ON BEHALF OF BIDDER: ...........................................

D. SCHEDULE OF WORK TO BE SUB-LET

The Bidder shall list below items of specialized work on this Contract which he intends

to sub-let.

If the Bidder intends to carry out specialized work himself, he shall state this.

The acceptance of this Bid shall not be construed as approval of the work to be sub-

let. Should any or all of the Sub-contractors not be approved subsequent to

acceptance of Quotation, this shall in no way invalidate this Bid and the quoted rates

and prices for the various items of work shall remain final and binding even in the

event of a Subcontractor not listed below, being approved by the Engineer.

ITEM DESCRIPTION OF WORK NAME OF SUBCONTRACTOR

SIGNED ON BEHALF OF BIDDER: ..........................................................

E. ALTERNATIVE QUOTATIONS

In addition to my/our Tender without any qualifications and strictly on the basis of the

Tender Documents, I/we wish to submit the following alternative quotations:

ALTERNATIVE NUMBER DETAIL

Full details are submitted with this Document but bound separately.

SIGNED ON BEHALF OF TENDERER: ...............................................................

SECTION 4: BILL OF QUANTITIES

The quantities in these Bills of Quantities are not to be used for ordering materials.

The Bill of Quantities forms part of and must be read in conjunction with the specification,

which contains the full description of the work described in the Bills of Quantities, reference

should be made to the specification for the full meaning or description of work to be done and

materials and equipment to be used in this service.

The total bid price on the Bid Form shall constitute the contract price of the successful

tenderer. Bidders are advised to check their item extensions and total additions, as no claim

for arithmetical errors will be considered.

No alteration, erasure or addition is to be made in the text of the Bill of Quantities. Should any

alteration, or erasure be made, it will not be recognized but the original wording of the Bills of

Quantities will be adhered to.

The priced Bill of Quantities of the successful bidder will be checked and the Engineer

reserves the right to call for adjustments to any individual price and to rectify the discrepancy.

Variations in the scope and extent of the work included in the Bill shall be allowed to meet the

Employer's requirements and shall be measured and costed at rates entered in the Bill, where

appropriate, and shall form additions to or deduction from the total of the Bill.

Any items or variations for which rates have not been included in the Bill shall be agreed and

priced as non-scheduled items in accordance with the provisions of the contract.

The rules covering the extent and costing of the variation shall be those provided for in the

form of conditions of contract.

Unless a separate rate for the supply and for the installation of any item is specifically called

for, the supply and installation costs of any item shall be fully included in the unit price.

The description of each item shall, unless otherwise stated herein, be held to include making,

conveying and delivering, unloading, storing, unpacking, hoisting, setting, fitting and fixing in

position, cutting and waste, patterns, models and templates, plant, temporary works, return of

packing’s, establishment charges, profit and all other obligations arising out of the conditions

of contract.

All fittings and accessories always include the connections thereto.

All measurements are net, unless otherwise stated, and tenderers must allow in their rates of

wastage.

The quantities and rates included for day work shall form part of the bid price, but bidders shall

note that this item must be regarded as provisional and will only be payable to the contractor if

and when a written order to this effect has been issued.

All provisional sums shall be expended as directed by the Engineer and any balance

remaining shall be deducted from the amount of the contract sum.

All taxes, duties both import and/or customs, and any other surcharges, surtaxes and charges

shall be included in all prices given in this priced Bill of Quantities.

VAT is to be added only in the price summary of the Bill of Quantities.

SECTION 5: SCHEDULE OF RATES FOR VARIATIONS

5.1 GENERAL

5.1.1 The rates entered in this schedule shall serve unaltered to calculate the value of variation

orders (additions or omissions) issued in terms of the Contract.

5.1.2 The rates entered shall exclude the Main/Principal Contractor's discount.

5.1.3 These rates shall include the following items necessary for the supply, delivery, handling

and installation of all applicable equipment:

Nett cost of material.

  • Profit, storing cost, handling charges, etc. for material.
  • Nett costs of labour.
  • Labour overheads and profit on labour.
  • General sales tax and any other duties payable.
  • Attributable overhead costs.

5.1.4 As the rates entered will only be used to calculate the value of variations, the Bidder

shall complete only list those rates of items to be used under this contract.

5.2 PROFIT ON MATERIAL FOR OMISSION AND ADDITIONS : (%)

The following percentage profit will be required on all materials for additions or omissions

not covered by any other section of this schedule. This percentage shall include all direct

overheads, handling charges, etc.

Nett percentage: ----------%

5.3 RATES FOR ADDITIONAL LABOUR : (N$/h)

These rates shall be applied to determine labour costs not covered by any of the other

sections of this schedule.

Supervisor/ Qualified Appren- Conduit Labourer

Foremen artisan tice installer

Normal

rate ----------- --------- ---------- ---------

Overtime

(week) ----------- --------- ---------- ---------

Saturday

time ----------- --------- ---------- ---------

Sunday

time ----------- --------- ---------- ---------

5.4 RATES FOR TRANSPORT : (N$/km)

Rates shall include the cost of a licensed driver fuel, oil, maintenance, etc.

Vehicle capacity Rate per kilometer

Up TO 1500 kg ------------------

1600 to 3000 kg ------------------

3100 to 7000 kg ------------------

SIGNATURE OF BIDDER : ____________________ DATE: ____________

NAME OF BIDDER : _______________________________________

ADDRESS : _______________________________________

: _______________________________________

: _______________________________________

TELEPHONE NUMBER : _______________________________________

FACSIMILE NUMBER : _______________________________________

SECTION 6: EVALUATION CRITERIA FOR BIDDING VENTILATION CONTRACTOR

This section contains supplementary criteria that the Employer shall use to evaluate bids.

1. Evaluation:

The following mandatory documents of the Bidding Ventilation Contractor must

accompany the bid submission:

I. A valid company Registration Certificate.

II. An original or certified copy of a valid good standing Tax Certificate.

III. An original or certified copy of a valid good standing Social Security

Certificate.

IV. A valid certified copy of an Affirmative Action Compliance Certificate, proof

from Employment Equity Comissioner that bidder is not a relevant employer

or exemption issued in terms of Section 42 of the Affirmative Action Act,

1998.

V. A written undertaking as contemplated in Section 138 (2) of the Labout Act,

2007.

VI. A valid certified copy of a certificate indicating SME Status (for bids reserved

to SMEs).

VII. A certified copy of a valid full Business Registration Certificate Trade Licence:

(Bidders are required to tender in line with business principles of HVAC

contracting /maintenance of HVAC systems).

VIII. Proof of registration with the Procurement Policy Unit (for Bids reserved to

categories of bidders and goods)

IX. A signed Bid-Securing Declaration

X. Company profile showing list of air conditioning and ventilation installations

completed, with their value of work.

XI. Letter from the Air Conditioning and Ventilation equipment suppliers

indicating that the bidder is authorized to install the equipment offered in this

bid submission.

Description of Requirement Yes/No

Item I A valid company Registration Certificate submitted

Item II Original or certified copies of a valid good standing Tax

Certificate submitted

Item III Original or certified copy of a valid good standing Social

Security Certificate submitted

Item IV A valid certified copy of an Affirmative Action Compliance

Certificate submitted

Item V A written undertaking as contemplated in Section 138 (2) of the

Labout Act, 2007 submitted

Item VI A valid certified copy of a certificate indicating SME Status

submitted

Item VII A certified copy of a valid full Business Registration Certificate

Trade Licence as an HVAC Installer submitted

Item VIII Proof of registration with the Procurement Policy Unit (for Bids

reserved to categories of bidders and goods) submitted

Item IX A signed Bid-Securing Declaration submitted

Item X I. Company profile showing list of air conditioning and

ventilation installations completed, with their value of work.

Item XI Letter from the air conditioning and ventilation equipment

suppliers indicating that the bidder is authorized to install the

equipment offered in this bid submission.

ITB 6.3(c) proposals for the timely acquisition (own, lease, hire, etc.) of the

essential equipment; Transport truck ,lifting equipment, moving

equipment, ladders or scaffolding, assorted hand tools,

Electrical test equipment.

ITB 6.3(d) a Contract Manager/Supervisor with five years’ experience in

works of an equivalent nature and volume, CV to be attached.

ITB 6.3(e) liquid assets and/or credit facilities, net of other contractual

commitments and exclusive of any advance payments which

may be made under the Contract, of no less than the amount

N$ 600,000.00. Proof to be attached

Note: Letter of Intent from any financial institution will not

be considered valid credit facility.

In addition to the criteria listed in ITB 6.3, ITB 13.1 and ITB 33 the following criteria

shall apply:

(a) Adequacy of Technical Proposal

Evaluation of the Bidder's Technical Proposal will include an assessment of the

Bidder's technical capacity to mobilize key equipment and personnel for the

contract consistent with its proposal regarding work methods, scheduling, and

material sourcing in sufficient detail and fully in accordance with the requirements

stipulated in Section I.

EQUIPMENT OFFERED (Maximum 20 points)

Equipment Offered - Ventilation Installations

To be completed by

(To be completed

client

by Bidder)

Item Engineer's Specification Compliance (Yes/No)

Yes - Acceptable Offer

Bidder's Offer

No - Unacceptable Offer

Split High Split High Wall A/C Units shall be Samsung

Wall A/C New Max Inverter AR4500 Series or Equal

Units and Approved.

Split

Split Ceiling Cassette A/C Units shall be

Ceiling

Samsung Wind Free Four (R32) Series or

Cassette

Equal and Approved.

A/C Units

Fresh Air Fresh Air Supply Fans shall be S&P TD

Supply Silent Series or Equal and Approved, and

Fan with speed controller

Item Description Max 20 Points

Fully completed Partially Not completed

(20 Points) completed (0 Points)

(10 Points)

1.3 Equipment Offered – Air

Conditioning & Ventilation

Installations

CONTRACTOR’S DATA SHEET (Maximum 15 points)

Item Description Max 15 Points

2.1 Key Personnel (Project Manager, Foremen, etc.) 1=5

points (Max)

2.2 Technical Personnel (Technicians, Artisans, etc.) 1-

2=3points : > 3=5points Max=5 points

2.3 Support Staff (1-2 = 3 points : > 3 = 5 points Max=5

points)Max= 5points)

Sub Total Points

SERVICE FACILITIES (Maximum 10 points)

Item Description Max 10 Points

3 In Namibia In SADC Other

(10 Points) (5 Points) (0 Points)

3.1 Service Staff, Workshop and

Equipment available in Namibia

PLANT AND EQUIPMENTS (Maximum 15 points)

Item Relevant Equipment Points Description/Type Owned/Hired

4.1 Transport (Truck) 5

4.2 Electrical test equipment for 2

Neonatal Appliances

4.3 Lifting equipment (lifts, cranes, 2

hoist, etc,)

4.4 Moving equipment (forklifts, hand 2

trucks, floor dollies, etc.)

4.5 Hand and machine tools 2

(spanners, driver, drills, etc.)

4.6 Climbing equipment (ladders, 2

scaffolding, lifts, etc.)

Total Points

COMPLETED PROJECTS OF SIMILAR NATURE (Maximum 20 points)

Project Name Completed Project Value in Millions

on Time (Successfully completed minimum of 1 projects

(yes/no) within 5 years)

(N$0 (N$1 000 001 (N$2 000 001

to to and above):

N$1 000 000): N$2 000 000): 20 points

10 points 15 points

Total points

MECHANICAL VENTILATION EQUIPMENT MANUFACTURER CERTIFICATION (Maximum

10 points)

Item Description Max 10 points

Provided

(Yes = 10

No = 0)

6.1 Bidder certified / approved by Manufacturer

6.2 Copy of proof to be attached

MECHANICAL VENTILATION EQUIPMENT SPARE PARTS AND MAINTENANCE (Maximum

10 points)

Item Description Max 10 points

Provided

(Yes = 10

No = 0)

7.1 Spare parts for all equipment offered available ex-stock in

SADC Countries

7.2 Maintenance service for equipment offered available outside

SADC Countries

Range of Quotations

Only bids that obtain 70% or more of the technical scores and whose bid prices fall within

the range of 15% below or 15% above the estimated Installation cost, including

contingencies, escalation and VAT, will be further evaluated.

Formulae:

SECTION 7: LIST OF DRAWINGS

DRAWING CODE DESCRIPTION

2518-AC-01 HVAC INSTALLATIONS – EXISTING BUILDING

2518-AC-02 HVAC INSTALLATIONS – NEW BUILDING

Page 1

ITEM SECTION DESCRIPTION UNIT QTY LAB. MATER. TOTAL AMOUNT

NO REFERS RATE RATE RATE N$

SECTION A:

PRELIMINARY AND GENERAL

A.1 THE SITE AND STORAGE

A.1.1 Employer default Item 1

A.1.2 Damage to buildings or other services

and making good Item 1

A.1.3 Packing and storage Item 1

A.1.4 Observation of site condition and

co-ordination Item 1

A.1.5 Use of site Item 1

A.1.6 Fencing, lighting and guarding Item 1

A.1.7 Site Control Item 1

A.1.8 Allowance for collection and disposal of

rubbish or excavation material Item 1

A.2 MANAGEMENT OF CONTRACT

A.2.1 Construction programme Item 1

A.2.2 Provisional Sums Item 1

A.2.3 Forman and Contractor's agent Item 1

A.2.4 Workman Item 1

A.2.5 Procedures Item 1

A.2.6 Progress of works and site visit Item 1

A.2.7 Co-operation with other contractors Item 1

A.2.8 Responsibility for Works Item 1

A.3 MATERIALS AND WORKMANSHIP

A.3.1 Quality of work Item 1

A.3.2 Quality control Item 1

A.3.3 Samples Item 1

A.3.4 Spare parts Item 1

A.4 TEMPORARY WORKS, PLANT AND

SERVICES

A.4.1 Temporary works and plant Item 1

A.4.2 Equipment Item 1

A.4.3 Testing equipment Item 1

A.4.4 Temporary services Item 1

A.5 FINANCIAL ASPECTS

A.5.1 Penalties Item 1

A.5.2 Escalation Item 1

A.5.3 Security Item 1

A.5.4 Insurance Item 1

AMOUNT CARRIED FORWARD

2518-HVAC-BOQ.xlsx

Page 2

ITEM SECTION DESCRIPTION UNIT QTY LAB. MATER. TOTAL AMOUNT

NO REFERS RATE RATE RATE N$

AMOUNT BROUGHT FORWARD

A.5.5 Reserved rights Item 1

A.5.6 Stamp Duties Item 1

A.5.7 Forward cover Item 1

A.5.8 Material off site Item 1

A.5.9 Government and local regulations Item 1

A.5.10 Fees Item 1

A.5.11 Placing of orders Item 1

A.5.12 Terms of payment Item 1

A.5.13 Variation orders Item 1

A.6 DOCUMENTATION AND MEASUREMENT

A.6.1 Standard Measurement Item 1

A.6.2 Scale and Dimensions Item 1

A.6.3 Workshop drawings and "As-Built"

workshop drawings Item 1

A.6.4 Operating and Maintenance Manuals Item 1

A.7 TRANSPORT

A.7.1 Transport to site Item 1

A.8 TEST, COMMISSION AND HAND OVER

A.8.1 Contractors inspection and commissioning Item 1

tests

A.8.2 Contractors test and inspection reports Item 1

A.8.3 Preliminary and completion inspection Item 1

A.9 GUARANTEE AND MAINTENANCE

A.9.1 Guarantee/maintenance period Item 1

A.9.2 Replacement Item 1

A.9.3 Rejection of equipment Item 1

AMOUNT CARRIED FORWARD TO SUMMARY

A. PRELIMINARY AND GENERAL

2518-HVAC-BOQ.xlsx

Page 3

ITEM SECTION DESCRIPTION UNIT QTY LAB. MATER. TOTAL AMOUNT

NO REFERS RATE RATE RATE N$

SECTION B: AIR CONDITIONING

AND VENTILATION INSTALLATIONS

B.1 Air Conditioning Installations

Split in-ceiling four way cassette units; with wired

remote controllers, the following nominal cooling

capacities and reverse cycle heating, as Samsung

B.1.1 Wind-Free 4 way (R32) or Equal and Approved, with

fresh air intake kit, condensate drain pump and

matching outdoor units.

B.1.1.1 AC140RN4DKG/EU (13.4 kW) set 2

Split high wall air conditioning units; with remote

controllers, the following nominal cooling capacities

B.1.2 and reverse cycle heating, as Samsung New Max

Inverter AR4500 Series or Equal and Approved

B.1.2.1 AR12BSHGAWK/FA (3.05 kW) set 1

B.1.2.2 AR18BSHGAWK/FA (4.69 kW) set 6

B.1.2.3 AR24BSHGAWK/FA (7.03 kW) set 6

Complete refrigeration piping between indoor and

B.1.3

outdoor units with sleeved insulation L/Sum 1

B.1.4 Complete A/c drain piping L/Sum 1

B.1.5 All pipe and cable trunking/sleeves L/Sum 1

B.1.6 All power and control cabling between

outdoor and indoor units and power

supply and units L/Sum 1

B.1.7 Outdoor mounting brackets Set 15

B.2 Ductwork A: Fresh Air Supply to Boardroom

at the Existing Building

Axial supply fan as S&P TD-Silent or Equal Axial Fan,

B.2.1

with speed controller, filter box and SA Wall Terminal

B.2.1.1 TD-350/125 Silent (40 l/s) No 1

Ducting to be fabricated from mild steel 2mm sheeting

in accordance to SABS. Hangers(OLPC) and

B.2.2

Supports(OL) shall be of Oline mechanical supports or

equal.

B.2.2.1 Rigid Ducting (Circular):

Ø125 m 5

B.2.2.2 Flexible Ducting (Circular):

Ø125 m 0.5

B.2.2.3 Elbow Ducting (Circular), 90°

Ø125 No 1

B.2.2.4 Weather louvres as Advantage Air or Equal,

with Plenum Box

150x150 set 1

B.3 Ductwork B: Fresh Air Supply to Boardroom

at the New Building

Axial supply fan as S&P TD-Silent or Equal Axial Fan,

B.3.1

with speed controller, filter box and SA Wall Terminal

B.3.1.1 TD-500/150 Silent (50 l/s) No 1

AMOUNT CARRIED FORWARD

2518-HVAC-BOQ.xlsx

Page 4

ITEM SECTION DESCRIPTION UNIT QTY LAB. MATER. TOTAL AMOUNT

NO REFERS RATE RATE RATE N$

Ducting to be fabricated from mild steel 2mm sheeting

in accordance to SABS. Hangers(OLPC) and

B.3.2

Supports(OL) shall be of Oline mechanical supports or

equal.

B.3.2.1 Rigid Ducting (Circular):

Ø150 m 10

B.3.2.2 Flexible Ducting (Circular):

Ø150 m 0.5

B.2.2.3 Elbow Ducting (Circular), 90°

Ø150 No 1

B.3.2.3 Weather louvres as Advantage Air or Equal,

with Plenum Box

200x200 set 1

AMOUNT CARRIED FORWARD TO SUMMARY

B. AIR CONDITIONING AND VENTILATION INSTALLATIONS

2518-HVAC-BOQ.xlsx

Page 5

ITEM SECTION DESCRIPTION UNIT QTY LAB. MATER. TOTAL AMOUNT

NO REFERS RATE RATE RATE N$

SECTION C:

LUMP SUMS

C.1 All other material and everything to provide

Listed items of above:

a) L/sum 1

b) L/sum 1

c) L/sum 1

d) L/sum 1

e) L/sum 1

f) L/sum 1

g) L/sum 1

C.2 any further items required to provide

complete safe, reliable and well

functioning installation

Listed items of above:

a) L/sum 1

b) L/sum 1

c) L/sum 1

d) L/sum 1

e) L/sum 1

f) L/sum 1

g) L/sum 1

AMOUNT CARRIED FORWARD TO SUMMARY

C. LUMP SUMS

2518-HVAC-BOQ.xlsx

PRICE SUMMARY Page 6

A. Preliminary and General N$

B. Air Conditioning and Ventilation Installations N$

C. Lump Sums N$

`

Sub-Total (A) N$

Add 10% Contingencies N$

Sub-Total (B) to be transferred to Summary N$

BIDDER'S SIGNATURE _______________________________________________________

FULL NAME AND ADDRESS OF BIDDER_______________________________________

______________________________________________________________________________

DATE: ___________________________

_________________________________ _______________________

BIDDER'S SIGNATURE AND STAMP DATE

2518-HVAC-BOQ.xlsx